ML20100Q368
| ML20100Q368 | |
| Person / Time | |
|---|---|
| Site: | Salem, Palisades, Kewaunee, Surry, North Anna, Turkey Point, 05000000 |
| Issue date: | 04/30/1984 |
| From: | Felton M, Felton J NRC OFFICE OF ADMINISTRATION (ADM) |
| To: | Sholly S UNION OF CONCERNED SCIENTISTS |
| Shared Package | |
| ML20100Q372 | List: |
| References | |
| FOIA-83-531 NUDOCS 8412170089 | |
| Download: ML20100Q368 (6) | |
Text
PDP-on
- p ne:
e UNITED STATES 8,
NUCLEAR REGULATORY COMMISSION
- 5 *-
'E WASHINGTON, D. C. 20555
%,.... f Mit 3 0 BS4 Mr. Steven C. Sholly Technical Research Associate Union of Concerned Scientists 1346 Connecticut Avenue, NW Suite 1101 IN RESPONSE REFER Washington, DC 20036 TO F0IA-83-531
Dear Mr. Sholly:
This is in further response to your letter dated September 8,1983, in which you requested, pursuant to the Freedom of Information Act,16 categories of documents. This response deals with item 6 of your letter.
The documents listed on Appendix A are being placed in the Public Document Room (PDR),1717 H Street, NW, Washington, DC.
Portions of the documents listed on Appendix B are being withheld from public disclosure because they contain unclassified safeguards information.
1 The authority for withholding this information is found in Section 147 of the Atomic Energy Act (42 U.S.C. 2167). This information is being withheld from public disclosure pursuant to exemption (3)(of the Freedom of Information Act (5 U.S.C. 552(b)(3)) and 10 CFR 9.5(a) 3) of the Commission's regulations. The nonexempt portions of these documents are l '
being placed in the PDR.
Pursuant to 10 CFR 9.9 of the Commission's regulations, it has been l
determined that the information withheld is exempt from' production or disclosure, and that its production or disclosure is contrary to the i
public interest. The persons responsible for this denial are the undersigned and for documents 1 through 3 on Appendix B, John Davis, Director, Office of Nuclear Material Safety and Safeguards; and for documents 4 through 6, the undersigned and Harold Denton, Director, Office of Nuclear Reactor Regulation.
(
l
- *UO L
e 3
PDR i-
[
Mr. Steven C. Sholly
- This denial may be appealed to the Commission's Executive Director for Operations within 30 days from the receipt of this letter. As provided in 10 CFR 9.11, any such appeal must be in writing, addressed to the Executive Director for Operations, U.S. Nuclear Regulatory Commission, Washington, DC 20555, and should clearly state on the envelope and in the letter that it is an " Appeal from an Initial FOIA Decision."
This completes action on your initial request.
Sinc ely,
/
J M. Felton,' Director
/
D'ivision of Rules and Records
,/
Office of Administration
Enclosures:
As stated I
}'
Re: F01A-83-531 APPENDIX A 1.
Undated Draft Working Paper re: Regulatory Effectiveness Review (4 pages) 2.
Undated Draft Working Paper re: Regulatory Effectiveness Review (5pages) 3.
Undated The Regulatory Effectiveness Review (RER) Program (1 paae) 4.
11/4/83 Memo for D. B. Mausshardt from R. F. Burnett re: Turkey Point RER (2 pages) 5.
9/22/83 Talking Points on RER Program for September 26-27, 1983 Management Meeting (2 pages) 6.
9/12/83 Memo for D. G. Eisenhut from R. F. Burnett re: Report on Turkay Point Regulatory Effectiveness Review (1 pace) 7.
9/6/83 Memo for C. O. Thomas from G. W. McCorkle re: SURRY REGULATORY EFFECTIVENESS REVIEW (1 page) 8.
8/25/83 Memo for J. G. Davis from R. F. Burnett re: TURKEY POINT REGULATORY EFFECTIVENESS REVIEW (1 page) 9.
8/22/83 Memo for J'. G. Davis from R. F. Burnett re: REGULATORY EFFECTIVENESS REVIEW (1 page)
- 10. 7/11/83 Note to R. F. Burnett from J. G. Davis re: REGULATORY EFFECTIVENESS REVIEW (1 page) 11, 8/4/83 Memo for C. Thomas and J. Partlow from G. W. McCorkle re: NORTH ANNA REGULATORY EFFECTIVENESS REVIEW (1 page)
- 12. 8/2/83 Memo for C. O. Thomas from G. W. McCorkle re: PUBLIC SERVICE ELECTRIC AND GAS COMPANY SALEM NUCLEAR GENERATING STATION SAFEGUARDS REGULATORY EFFECTIVENESS REVIEWS w/ enclosed Proposed Letter to Licensee (2 pages) 13.
7/28/83 BRIEFING PAPER - REGULATORY EFFECTIVENESS REVIEWS (5 pages)
- 14. 7/27/83 Memo for D. Eisenhut from R. F. Burnett re: REPORT ON TURKEY POINT REGULATORY EFFECTIVENESS REVIEW w/ enclosed Proposed Letter (2pages)
- 15. 5/20/83 Memo for C. O. Thomas from G. W. McCorkle re: CHANGES TO TECHNICAL SPECIFICATIONS REGARDING THE SURVEILLANCE FREQUENCY OF DIESEL GENERATOR DAY TANK VALVES - SALEM (1 page)
Re:
F0!A-83-531 APPENDIX A
- 16. 5/20/83 Memo for C. O. Thomas from G. W. McCorkle re: PUBLIC SERVICE ELECTRIC AND GAS COMPANY'S RESPONSES TO THE REGULATORY EFFECTIVENESS REVIEW REPORT FOR SALEM w/ enclosed Proposed Letter (2 pages) 17.
5/10/83 Memo for J. G. Davis from R. F. Burnett re: SAFEGUARDS REGULATORY EFFECTIVENESS REVIEW PROGRAM (3 pages)
- 18. 5/2/83 Hemo for J. G. Davis from R. F. Burnett re: SAFEGUARDS REGULATORY EFFECTIVENESS REVIEW PROGRAM (2 pages)
- 19. 4/27/83 Memo for C. O. Thomas from G. W. McCorkle re: CONSUMERS POWER COMPANY'S RESPONSE TO THE REGULATORY EFFECTIVENSEE REVIEW REPORT w/ enclosed Proposed Letter (2 pages)
- 20. 2/10/83 Memo for D. Eisenhut from R. F. Burnett re: REPORT ON SALEM REGULATORY EFFECTIVENESS REVIEW w/ enclosed Proposed Letter (2pages)
- 21. 2/2/83 Memo for R. F. Burnett from G. W. McCorkle re: REGULATORY EFFECTIVENESS REVIEWS AT SALEM UNITS 1 AND 2 (1 page) 22.
1/18/83 Letter to C. W. Giesler from R. F. Burnett re: RER SCHEDULED FOR KEWAUNEE (1 page)
- 23. 7/20/82 Memo for D. G. Eisenhut from R. F. Burnett re: SAFEGUARDS REGULATORY EFFECTIVENESS REVIEW PROGRAM (1 page)
- 24. 7/7/82 Note to Liz Quinn and George McCorkle from Sallie Mullen re:
MEETING WITH D. EISENHUT ON REACTOR RER'S, 7/7/82 (2 pages) 25, 6/28/82 Memo for D. G. Eisenhut from R. F. Burnett re: SAFEGUARDS REGULATORY EFFECTIVENSEE REVIEW 0F KEWAUNEE w/ enclosed Draft Letter to E. R. Matthews (3 pages) 26.
11/9/81 Memo for H. D. Thornburg from R. F. Burnett re: SELECTION OF KEWAUNEE NUCLEAR POWER STATION FOR SAFEGUARDS REGULATORY EFFECTIVENESS REVIEW w/ enclosed memo to D. Eisenhut from R. Burnett (2 pages) 27.
11/19/82 Hemo for D. Eisenhut from R. F. Burnett re: REPORT ON PALISADES REGULATORY EFFECTIVENESS REVIEW w/ enclosed Proposed Letter (2pages)
- 28. Undated THE NRC REGULATORY EFFECTIVENESS REVIEW PROGRA't (6 pages)
- 29. Undated A PROGRAM PLAN FOR REGULATORY EFFECTIVENESS REVIEWS OF NUCLEAR POWERREACTORS(29pages)
Re: F01A-83-531 APPENDIX A 30.
2/24/83 Letter to R. A. Uderitz from S. A. Varga re: SAFEGUARDS INFORMATION (2 pages)
- 31. _12/9/82 Letter to D. J. VandeWalle from D. fl. Cruthfield re:
SAFEGUARDS INFORMATION (2 pages)
- 32. 6/17/93 Memo for 0. D. Parr from C. O. Thomas re: CHANGES TO TECHNICAL SPECIFICATIONS REGARDING THE SURVEILLANCE FREQUENCY OF DIESEL GENERATOR DAY TANK VALVES - SALEM (1 page) 33.
Undated.
Memo for D. G. Eisenhut from R. F. Burnett et, al. re:
SAFEGUARDS REGULATORY EFFECTIVENESS REVIEW 0F KEWAUNEE NUCLEAR POWER STATION (1 page) 34.
6/29/83 Memo for G. W. McCorkle from C. O. Thomas re: CHANGES TO THE TECHNICAL SPECIFICATIONS REGARDING THE SURVEILLANCE FREQUENCY OF DIESEL GENERATOR DAY TANK VALVES - SALEM (1 page) 35.
9/20/82 Letter to C. W. Giesler from D. G. Eisenhut re: REGULATORY EFFECTIVENESS REVIEW (RER) w/ enclosures (4 pages)
- 36. 8/23/83 Memo for C. Thomas from 0. D. Parr re: REGULATORY EFFECTIVENESS REVIEW FOR TURKEY POINT NUCLEAR POWER STATION UNIT 3 AND 4 (2 pages)
- 37. 8/12/83 Memo for C. O. Thomas from H. B. Clayton re: COMMENTS ON REGULATORY EFFECTIVENESS REVIEW FOR TURKEY POINT NUCLEAR POWER STATION UNITS 3 AND 4 (1 page) 38.
7/13/82 Memo for R. F. Burnett from D. G. Eisenhut re: SAFEGUARDS REGULATORY EFFECTIVENESS REVIEW 0F KEWAUNEE NUCLEAR POWER STATION (1 page) 39, 6/22/83 Memo for C. O. Thomas from 0. D. Parr re: CHANGES TO TECHNICAL SPECIFICATIONS REGARDING THE SURVEILL ANCE FREQUENCY OF DIESEL GENERATOR DAY TANK VALVES - SALEM (1 page)
Re:
F01A-83-531 APPENDIX B 1.
12/82 SAFEGUARDS REGULATORY EFFECTIVENESS REVIEW SALEM NUCLEAR POWER STATION UNITS 1 AND 2 - DECEMBER 1982 (25 pages) 2.
9/82 SAFEGUARDS REGULATORY EFFECTIVENESS REVIEW PALISADES NUCLEAR POWER STATION - SEPTEMBER 1982 (16 pages) 3.
6/83 SAFEGUARDS REGULATORY EFFECTIVENESS REVIEW TURKEY POINT NUCLEAR POWER STATION UNITS 3 AND 4 - JUNE 1983 (13 pages) 4.
Undated Memo for C. O. Thomas from D. G. Mcdonald re: COMMENTS ON REGULATORY EFFECTIVENESS REVIEW AND VITAL AREA VALIDATION -
TURKEY POINT PLANT UNITS 3 AND 4 w/ attachments (6 pages) 5.
3/23/83 Letter to S. A. Varga from R. A. Uderitz re: REGULATORY EFFECTIVENESS REVIEW (1 page) 6.
7/19/83 Letter to R. A. Uderitz from S. A. Varga re: REQUEST FOR ADDITIONAL INFORMATION ON THE REGULATORY EFFECTIVENESS REVIEW REPORT FOR SALEM, UNITS 1 AND 2 w/ enclosed Comments (3 pages)