Revised Monthly Operating Repts for June 1991 for Brunswick Units 1 & 2
ML20082T337
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 06/30/1991
From: Rumple R
CAROLINA POWER & LIGHT CO.
To:
Shared Package
ML20082T291 List:
References
NUDOCS 9109180210
Download: ML20082T337 (6)


Text

.

The following are the revised pages of the Unit Shutdowns and Power Reductions data for the month of June 1991.

September 1991

DOCKET k3. C50-0325 UNIT NAME B v swick 1 DATE Sectem ber 1991 COMPLETED BY Ronald Rnle TELEPHONE 919-457-2752 UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH June 1991 METHOD OF LICENSEE CAUSE & CORRECTIVE ACTION TO DURATION SHUTTING DOWN EVENT SYSTEM COMPONENT FREVENT RECURRENCE NO. DATE TYPE (1) (HOURS) REASON (2) REACTOR (3) REPORT 40. CODE (4) CODE (5)91-024 910622 5 0 B 5 N/A SD . N/A Reduced power for valve testing, condenser inleskege hunt and circulating water outlet valve adjustment.

1: Tyre 2: Peason 3: Method 4: System Code: 5: Ccroonent Code F - Forced A- Equipment failure 1- Manual Instructions for Instructions for preparation of data entry S - Screduled (explain) 2- Manual Screra preparation of data B- Maintenance or test 3- Automatic scrare sheets for Licensee Event entry sheets for LER C- Refueling 4- Continuations Report (LER) flie frcn file from IEEE Standard D- Regulator; 5- Load reductions IEEE Standard 805-1983 303A-1983, per restrtetton 6- Other pe- NUREG-1022. NUREG-1022.Section VI.

E- Operator Training & Section VI. Item 13.b Item 13.c License Examination F Arkninistrati ve 6- Operational error (explain)

H- Other(emplain) i 90-0041.MSC Revision 1 September 1991 i

DOCKET h0. 053-0324 Lw!T NAME ecurswick 2 DATE .itete%ee 1991 COMPLETED Ef _.lonald Rele TELEPHONE 919-457-2752 UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH June 1991 METHOD OF LICENSEE CAUSE & CORRECTIVE ACTION TO SHUTTING D0i.1 EVENT SYSTEM COMPONENT FREVENT RECURRENCE DURATION NO. DATE TYPE (1) (HOURS) REASON (2) REACTOR (3) REPORT NO. CODE (4) CODE (s) 5 N/A AD P Reduced power for drywell entry 91-C28 910608 5 0 B to add oil to 2B Reactor Coolant Recirculation pep and to inspect 28 drywell equipent drains stro j pu,o n: tor.

3: Method 4: System Code: 5: Cce m -ent CrAe 1: Lvtg 2: Reason A- Equipment failure I-

  • nual Instructions for Instructices for F - Forced preparation of data entry preparation of data S - Scheduled (explain) 2- Manual Scram Maintenance or test 3- Automatic scram sheets for Licensee t veat entry sheets for LER B- file f m i IEEE Standard C- Refueling 4- Continuations Report (LER) file from negulatory 5- Load reductions IEEE Standard 605-1983 803A-1983 per D-restriction 6 -- Other per NUREG-1022 h3 REG-1C22.Section VI.

Operator Training & Section VI. It w 13.b Item 13.c E-License Examination F- Achinistr ative G- Operational error (explain)

H- Other (explain)

Revision 1, September 1991 90-0041.MSC

e DOCKET #0. 050-0324 UNIT NAME Brunswick 2 DATE Septe+r 1991 COMPLETED Bf Ronald Rumole TELEPHONE 919-457-2752 '

UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH June 1991 METHOD OF LICENSEE CAUSE & CORRECTIVE ACTION TO DURATION SHUTTING DOWN EVENT SYSTEM COMPONENT PREVENT RECURRENCE NO. CATE TYPE (1) (HOURS) REASON (2) REACTOR (3) REPORT NO. CODE (4) C00E (S)91-036 910630 F 0 A 5 2-91-005 TS RG Reduced power due to decrease in condenser vacuum caused by loss of 28 Steam Jet Air Ejector. The 28 SJAE was lost due to tripping ,

of E-4 bus caused by defective  !

main generator voltage regulator.

This occurred during preventive maintenance. l t

1: Ty2e 2: Reason 3: Method 4: System Code: 5: Comrent Code F - Forced A'- Equipment failure 1- Manual. Instructions for instructions for S - Scheduled (explain) 2- Manual Scram preparation of data entry preparation of data 8- Maintenance or test 3- Automatic scram sheets 'ar Licensee Event entry sheets for LER .

C- Refueling 4- Continuations Report (LER) file from file from IEEE Standard D- Regulatory 5- Load reductions IEEE Standard 805-1983 603A-1983, per l restriction 6- Other per NUREG-1022 NUREG-1022.Section VI. [

E- Operator Training & Section VI. Item 13.b Item 13.c  !

License Examination  ?

I F- Adninistrative G- Operational error I (explain) (

H- Other (explain)

I 90-0041.MSC Revision 1, September 1991

COAL CO PLANT PERFORMANCE DATA SYSTEM PAGE i RUf4 DATE 09/0../91 UPERA11NG DATA REPORT RPD36-000 RUN TIME 13:19:21 liRUNSWICK UNIT 1 DOCKET NO. 050-0325 CONFL E T FD Li Y RONAL D RUMPLE OPFRATING STATUS TE..EPHONE (919)457-27S2 .?

b

i. UNIT NAME- MUNSWICK UNIi i i NU1ES - There are 560 fust 1

(

2. HEPORTING PERIOD. JUNE 91 lbundles in the Reactor coro. There 1
3. LICENSED THERMAL POWER (Myr) 2436 lara 1090 Dwn and 160 PWR spent l
4. HAf1EPLATE HATING (GROSS MWE)< 06 0 lfuci bundles in the Puol Poci. 1
5. DESIGN ELECTRICAL RATING (NET MWE) 321.0 l'Iber e are no fuel bundles in the l
6. MAX DEPENDA1:LE CAPAC FY (GRDSS MWE) 791.0 innw I'uol storage Vault. l
7. MAX DEPENDADLE CAPAr i/ (NET MWE) 767.0 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

G. IF CHANGES OCCUR IN ;APACITY RAT INGS (ITEMS 3 1HRU 7) SINCE LAST REPORT, GIVE REASONS.

Itets 6 and 'l reflect now MDC values approved by CP&L Mraag;. .t a of August 15, 1991.

Y. POWER LEVEL TO WHICH RES1RIC1ED IF ANY (NE1 MWE)

10. REASONS FOR RESTRICTION IF ANY:

THIS YR 10 CUMUL MONTH DATE ATIVE

11. HOU;tS IN REPORTING PERIOD 720.00 4343.00 125231.00
12. NUMIiER GF HOURS REA2 TOR CRI11 CAL 720.00 2005.07 81307.23
13. REAC10k RESERVE FHU1DOWN HRU .00 .00 1647.10
14. HOURS GENERnTf"1 ON LINE 720.00 1952.41 77815.65
15. UNIT RESER N SHUTDOWN HOURS .00 .00 .00
16. GROSS IHERMAL ENERGY GEN. (MWH) 1737175.91 4550527.90 16774Hi71.00 .

i7. GROSS ELEC. ENERGY SEN. (MWH) 561120.00 1476990.00 55010465.00

10. NET ELEC. ENERGY GENERATED (MWH) 545015.00 1416535.00 52918929.00

'19 UNIT SERVICE FACTOR 100.00 44.96 62.14 20 UNIT 6VAILABILITY FACTOR 100.00 44.96 62.14

21. UNIT CAP. FACTOR (USING MDC NET) 98.84 42.5? 53.54
22. Uti1T CAP. FACTOR (USING DER NET) 9?.34 39.73 51.47
23. UNIT FORCED OUTAGE RATE 00 34.39 15.66 24 SHUTDOWMS SCHED. OVER NEXT 6 tiONTHS (TYPE, DATE, AND DURATION OF EACH)-
25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP:
26. UNITS IN TEST STATUS (PRIOP. 30 COMMERCIAL OPEttATION) FORECAST ACHIEVED s INITIAL CRITICALITY -------- --------

li'1TI AL ELECTRICITY - - - - - - - - - - - - - - - - -

COMMERCIAL OPERATION - - - - - - --------

Resision 1, September 1991 1.16 - 9

o r CP&L CO PLANT TERFORNANCE DATA SYSTEM PAGE 2 s

'RUN_DA1E- 09/04/91 UPERATIN'. MT A REPOR1 FPD36-000  ;

-RUN TIME 13:19:21 PHilNSWit ' ' HIT '- '

l DOCKET NO. 050-0324 i COMPLE1ED liY RUNALD RUMPLE  !

OPERATING STATUS 1ELEPHONE (919)457-2752 1._ UNIT NAME. IiRUNSWICK UNIT 2 i NOTES - There are $60 fuel i

2. REPORTING PERIOD: JUNE 91 lbundles in the Reactor Core. There I (
3. LICENSED THERMAL POWER (MWT): 2436 lare 1036 DwR and 144 rwn spent fuell-
4. NAMEPLATE RATING (GRODS-MWE). 067.0 lbundles in the ruel Pool. There i 7
3. DCSIGN ELECTRICAL RATING (NE1 MWE)- 021.0 laro no fuel bun 61es la the now l l
4. MAX DEPENDAliLE CAPACIIY (GROSS MWE): 702.0 trual storage vault._ l  !
7. HAX DEPENDoliLE CAPACITY (NET MWE) 754.0 --~~---------------------~~----

l D. IF CHANGES OCCUR IN CAPACITY RATINGS (11 EMS 3 THRU 7) SINCE LAST REPORT.

GIVE REASONS: ,

Iterrs 6 and 7 reflect new MDc values approved by cP6L Management as of August 15, 1991.

9.-POWER LEVEL TO WHICH RESTRICTLD IF ANY (NE1 MWE).

10. REASONS FOR RESTRICTION IF ANY:  :

f THIS YR TO COMUL MONTH DATE ATIVE l

11. HOURS.IN REPORTIN(, PERIOD 720.00 4347.00 137255.00
12. NUNiiER OF HOURS REACTOR CRITICAL 720.00 3205.94 07762.75-i'3. REACTOP RESERVE SHUTDOWN HRS .00 .00 .00
14. HOURS GENERATOR ON LINE 713.50 3209.03 63200.09
15. UNIT RESERVE SHUTDOWN HOURS .00 .00 .00
16. GROSS THERMAL ENERGY GEN. (MWH) 1703179.09 7649450.99 175772209.95
17. GROSS ELEC. ENERGY GEN. (MWH) 545005.00 2404645.00 56071704.00
10. NET ELEC. ENERGY GENERATED (MWH) 527456.00 2395660.00 54544966.00 i '/ . UNIT SERVICE FACTOR 99.10 73.91 60.62 20, UNIT AVAILAllILITY FACTOR 99.10 73.91 60.62
21. UNIT-CAP. FACTOR (USING MDC NET) 97.16 73.16 50.38

'22. UNIT CAP. FACTOR (USING DER NET) 09.23 67.19 40.40 123. UNIf. FORCED OUTAGE RATE .90 26.09 13.62

.24.--SHUTDOWNS SCHED. OV R NEXT 4 MONTHS (TYPE, DATE, AND DURATION OF EACH)'

t

25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START-UP' ,

l 26. UNITS IN TEST STATU' (PRIOR T0-COMMERCIAL OPERATION)' FORECAST ACHIEVED  !

INITIAL' CRITICAL'TY -------- ----+---

INITIAL ELECTRICITY- - - - - - - - - --------

COMMERCIAL OPERATION- - - ~ ~ - - - --------

Revision 1, September 1991 i.16 - 9