Monthly Operating Repts for Aug 1991 for Brunswick Units 1 & 2
ML20082T324
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 08/31/1991
From: Rumple R
CAROLINA POWER & LIGHT CO.
To:
Shared Package
ML20082T291 List:
References
NUDOCS 9109180207
Download: ML20082T324 (6)


Text

- _ - _ - _ - _ _ _

t

  • A .
  • PLANT PERFORMANCE DATA SYSTEM PAGE i CD6L CC' RUN DATE 09/04/91 APPENDIX It - AVERAGE DAILY POWER LEVEL RPD39-000 HUN TIME 13:19:29 BRUNSWICK UNIT i
  • DOCKEf NO. 050--0325 COMPLETED BY RONALD RUMF LE TELEPHONE (919)4T7-2752 AUGUST 1991 DAY AVG. DAILY POWER LEVEL DAY AVG. DAILY POWER LEVEL (MWE-NET) (MWE-NET) i 774 17 770 2 775 18 712 3 772 19 770 4 771 20 771 S 772 21 769 6 772 22 767 7 772 23 769 8 770 24 770 9 770 25 769 10 771 26 770 11 771 27 770 12 774 28 769 13 774 29 767 14 772 30 767 15 773 31 768 16 772 1.16 - 8 o109100207 910912 4 f DR ADOCK 0500

s CP&L CO PLANT PERFORMANCE DATA SYSTEM PAGE i HUN DATE 09/04/91 OPERATING DATA REPORT RPD36-000 RUN TIME 13:19:30 DRUNSW1CK UNIT i DOCKET NO. 050-0325

COMPLETED BY RONALD RUMPLE OPERATING STATUS TELEPHONE ('?i9)457-2752
i. UNIT I4AME BRUNSWICK UNIT 1 i NOTES - There are 560 f uel i
2. REPORTING PERIOD: AUGUST 91 lbundles in the Peactor Core, 1090 1
3. LICENSED THERMAL POWER (MWT) 2436 IDWR and 160 PWR spent fuel bundles l
4. NAMEPLATE RATING (GROSS MWE) 867.0 lin the fuel pool, and no ruel I
5. DESIGN ELECTRICAL RATING (NET MWE) 821.0 lbundles in the new fuel storage  !
6. MAX DEPENDABLE CAPACITY (GROSS MWE) 791.0 Ivault. I
7. MAX DEPENDABLE CAPACITY (NET MWE) 767.0 ti . IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT, GIVE REASONS:

Items 6 & 7 reflect now MDC values approved for use by CP&L management as of August 15, 1991.

9. POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE)
10. REASONS FOR RESTRICTION IF ANY:

TH1S YR TO CUMUL MONTH DATE ATIVE

11. HOURS IN REPORTING PERIOD 744.00 5831.00 126719.00
42. NUHbER OF HOURS REACTOR CRITICAL 744.00 3419.02 82721.98
13. REACTOR RESERVE SHUTDOWN HRS .00 .00 1647.10
14. HOURS GENERATOR ON LINE 744.00 3250.83 79122.07
15. UNIT RESERVE SHUTDOWN HOURS .00 .00 .00 16.' GROSS THERMAL ENERGY GEN. (MWH) 1806227.74 7694300.00 170891944.06
17. GROSS ELEC. ENERGY GEN. (MWH) 590330.00 2501370.00 56034845.00
18. NET ELEC. ENERGY GENERATED (t1WH) 571924.00 2407806.00 53910200.00
19. UNIT SERVICE FACTOR 100.00 55.09 62.44
20. UNIT AVAILABILITY FACTOR 100.00 55.09 62.44
21. UNIT CAP. FACTOR (USING MDC NET) 100.22 53.04 53.92
22. UNIT CAP. FACTOR (USING DER NET) 93.63 50.30 51.8?
23. UNIT FORCED OUTAGE RATE .00 26.99 15.61
24. SHUTDOWNS SCHED. OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH)
25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION). FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY - - - - - ------

COMMERCIAL OPERAliON - - - - - - -

i.16 - 9

i e:e - .a

'C'P&L dd PLANT-PERFORMANCELDATA SYSTEM PAGE 2 RUN DATE- 09/04/91 -APPENDIX-B - AVERAGE DAILY POWER LEVEL RPD39-000 RUN)TIAE 13:19:29 -BRUNSWICK UNIT 2 DOCKET NO. 050-0324 COMPLETED BY RONALD RUMPLE TELEPHONE (919)457-2752 i i

. AUGUST- 1991 DAY . AVG. DAILY POWER LEVEL-- DAY AVG. DAILY POWER LEVEL (MWE-NET) (MWE-NET) .

I 1- 743 ~ 17 734- i l

2 742 18 653 l

-3 708 19 747 4 661 20 749 5- 740 21 749

.6 ' 41 7 22 745 z7 740' - 23 373

'8 740 24 747 9 739 25 .752 1.03 631 26 752 ti- 742 27- 748 12 745 28 740

-11 3 - 746- 29 739

-14. 741 30 727 15- 741 31 737-(16 739:

1.16 - 8

dP&L: 6- PLANT PERFORMANCE DATA SYSTEM PAGE 2 FRUN;DATE- 09/04/91 OPERATING DATA REPORT RPD36-000 RUN-TIMEi 13:19:30' BRUNSWICK UNIT 2 DOCKET NO. 050-0324 1 COMPLETED BY RONALD RUMPLE l OPERATING STATUS TELEPHONE (9i9)457-2752 i

- 1. UNIT NAME: BRUNSWICK-UNIT 2 i NOTES - There are 560 fuel bundled

-2. REPORTING PERIOD: AUGUST 91 lin the Reactor Core, 965 BWR and l 3._ LICENSED-THERMAL POWER (MWT): 2436 1144 PWR spent fuel bundles in the 1

4. NAMEPLATE RATING (GROSS MWE): 867.0 lfuel pool, and 148 fuel bundles in I
5. DESIGN ELECTRICAL RATING (NET MWE) 821.0 Ithe fuel storage vault. l 6.iMAX DEPENDABLE CAPACITY (GROSS MWE). 782.0 1 I
7. MAX DEPENDABLE CAPACITY (NET MWE) '754.0 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
8. IF CHANGES OCCUR IN CAPACITY RATINGS'(ITEMS 3 THRU 7) SINCE.LAST REPORT, GIVE REASONS:

-Items 6-& 7 reflect new MDC values approved for use by CP&L management as of 1.ugust 15,~1991.

9. POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE)
10. REASONS FOR RESTRICTION IF ANY:

THIS YR TO CUMUL MONTH DATE- ATIVE ii. HOURS IN REPORTING PEPIOD 744.00 5831.00 138743.00

12. NUMBER-0F HOURS REACTUR CRITICAL 744.00 4773.94 89250.75
13. REACTOR RESERVE SHUTDOWN HRS .00 .00 .00
14. HOURS GENERATOR ON LINE -744.00 4697.03 84690.09
15. UNIT RESERVE-SHUTDOWN HOURS .00 .00 . 0 0.
14. GROSS THERMAL. ENERGY GEN.-(MWH) 1758328.19 11185963.89 179308713.85
17. GROSS ELEC.- ENERGY-GEN. (MWH) 554970.00 3599345.00 57986484.00 18.-NET ELEC., ENERGY GENERATED (MWH) 535845.00 3471125.00 55620431.00
19. UNIT SERVICE FACTOR- .

i00.00 00.57 61.04

-20. UNIT AVAILABILITY FACTOR 100.00 80.57 .61. 04 =

21.. UNIT CAP.-FACTOR-(USING MDC NET) 95.52 78.95 50.04-

-22.EUNIT CAP. FACTOR (USING DER NET) 87.72 72.51 48.83

23. UNIT FORCED OUTAGE RATE .00 19.43- 13.41
24. SHUTDOWNS SCHED. OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):

Refueling shutdown scheduled from 9/12/91 to 12/11/91.

-25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTEUP:

26.-UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION) FORECAST ACHIEVED INITIAL CRITICALITY --------

. INITIAL ELECTRICITi -------- --------

COMMERCIAL OPERATION -------- --------

i.16 - 9

DOCKET NO. 050-032a

'urti NAME Bninswick 2 DATE Scotember 1991 COMPLETED BY Ronald Rumele TELEPHONE 919-457-2752 UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH Aaoust 1991 METHOD OF LICENSEE SYSTEM COMPONEr:T CAUSE & CORRECTIVE ACTION TO DURATION SHUTTING DOWN EVENT CODE (4) CODE (5) PREVENT RECURRENCE NO. MTE TYPE (1) (%URS) REASON (2) REACTOR (3) REPORT NO.91-008 910823 $ 0 B 5 N/A AD P Reduced power to add oil to 2B ,.

Reactor Recirc. Pump. Also performed testing on main generator voltage reggiator, back. washed A-N waterbox and'cor. ducted routine valve testing.

1: Tvoe 2: Reason 3: Nthod 4: System Code: 5: Comronent Code F - Forced A- Equipment failure 1- Manual Instructions for Instructions for 5 - 5 heduled (explain) 2- Manual Scram preparation of data entry preparation of data B- Maintenance or test 3- Automatic scram sheats for Licensee Event entry sheets for LER C- Refueling 4- Continuations Report (LER) file from flie from IEEE Standard D- Regulatory 5- Load reductions IEEE Standard 805-1983, 803A-1983, per restriction 6- Other per NUREG-1022, NUREG-1022,Section VI.

E- Operator Training & Section VI. Item 13.b Item 13.c

(

License Examination F- Adninistrative G- Operational error (explain)

H- Other (emplain) l I

i 90-0041.MSC l

The following are the revised pages of the Monthly Operating Data Reports from January 1991 through July 1991.

September 1991