- A CD6L CC' PLANT PERFORMANCE DATA SYSTEM PAGE i
RUN DATE 09/04/91 APPENDIX It - AVERAGE DAILY POWER LEVEL RPD39-000 HUN TIME 13:19:29 BRUNSWICK UNIT i DOCKEf NO. 050--0325 COMPLETED BY RONALD RUMF LE TELEPHONE (919)4T7-2752 AUGUST 1991 DAY AVG. DAILY POWER LEVEL DAY AVG. DAILY POWER LEVEL (MWE-NET)
(MWE-NET) i 774 17 770 2
775 18 712 3
772 19 770 4
771 20 771 S
772 21 769 6
772 22 767 7
772 23 769 8
770 24 770 9
770 25 769 10 771 26 770 11 771 27 770 12 774 28 769 13 774 29 767 14 772 30 767 15 773 31 768 16 772 1.16 - 8 o109100207 910912 f DR ADOCK 0500 4
s CP&L CO PLANT PERFORMANCE DATA SYSTEM PAGE i
HUN DATE 09/04/91 OPERATING DATA REPORT RPD36-000 RUN TIME 13:19:30 DRUNSW1CK UNIT i DOCKET NO. 050-0325 COMPLETED BY RONALD RUMPLE OPERATING STATUS TELEPHONE
('?i9)457-2752
- i. UNIT I4AME BRUNSWICK UNIT 1 i NOTES - There are 560 f uel i
2.
REPORTING PERIOD: AUGUST 91 lbundles in the Peactor Core, 1090 1
3.
LICENSED THERMAL POWER (MWT) 2436 IDWR and 160 PWR spent fuel bundles l 4.
NAMEPLATE RATING (GROSS MWE) 867.0 lin the fuel pool, and no ruel I
5.
DESIGN ELECTRICAL RATING (NET MWE) 821.0 lbundles in the new fuel storage 6.
MAX DEPENDABLE CAPACITY (GROSS MWE) 791.0 Ivault.
I 7.
MAX DEPENDABLE CAPACITY (NET MWE) 767.0 ti. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT, GIVE REASONS:
Items 6 & 7 reflect now MDC values approved for use by CP&L management as of August 15, 1991.
9.
POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE)
- 10. REASONS FOR RESTRICTION IF ANY:
TH1S YR TO CUMUL MONTH DATE ATIVE
- 11. HOURS IN REPORTING PERIOD 744.00 5831.00 126719.00 42.
NUHbER OF HOURS REACTOR CRITICAL 744.00 3419.02 82721.98
- 13. REACTOR RESERVE SHUTDOWN HRS
.00
.00 1647.10
- 14. HOURS GENERATOR ON LINE 744.00 3250.83 79122.07
- 15. UNIT RESERVE SHUTDOWN HOURS
.00
.00
.00 16.' GROSS THERMAL ENERGY GEN. (MWH) 1806227.74 7694300.00 170891944.06
- 17. GROSS ELEC. ENERGY GEN. (MWH) 590330.00 2501370.00 56034845.00
- 18. NET ELEC. ENERGY GENERATED (t1WH) 571924.00 2407806.00 53910200.00
- 19. UNIT SERVICE FACTOR 100.00 55.09 62.44
- 20. UNIT AVAILABILITY FACTOR 100.00 55.09 62.44
- 22. UNIT CAP. FACTOR (USING DER NET) 93.63 50.30 51.8?
- 23. UNIT FORCED OUTAGE RATE
.00 26.99 15.61
- 24. SHUTDOWNS SCHED. OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH)
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION). FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERAliON i.16 - 9
i e:e -
.a
'C'P&L dd PLANT-PERFORMANCELDATA SYSTEM PAGE 2
RUN DATE- 09/04/91
-APPENDIX-B - AVERAGE DAILY POWER LEVEL RPD39-000 RUN)TIAE 13:19:29
-BRUNSWICK UNIT 2 DOCKET NO. 050-0324 COMPLETED BY RONALD RUMPLE TELEPHONE (919)457-2752 i
i
. AUGUST-1991 DAY
. AVG. DAILY POWER LEVEL--
DAY AVG. DAILY POWER LEVEL (MWE-NET)
(MWE-NET) 1-743 ~
17 734-i l
2 742 18 653
-3 708 19 747 4
661 20 749 5-740 21 749
' 41 22 745 7
.6 z7 740' -
23 373
'8 740 24 747 9
739 25
.752 1.03 631 26 752 ti-742 27-748 12 745 28 740
-11 3 -
746-29 739
-14.
741 30 727 15-741 31 737-(16 739:
1.16 - 8
dP&L: 6-PLANT PERFORMANCE DATA SYSTEM PAGE 2
FRUN;DATE- 09/04/91 OPERATING DATA REPORT RPD36-000 RUN-TIMEi 13:19:30' BRUNSWICK UNIT 2 DOCKET NO. 050-0324 1
COMPLETED BY RONALD RUMPLE OPERATING STATUS TELEPHONE (9i9)457-2752 i
- 1.
UNIT NAME: BRUNSWICK-UNIT 2 i NOTES - There are 560 fuel bundled
-2.
REPORTING PERIOD: AUGUST 91 lin the Reactor Core, 965 BWR and l
3._ LICENSED-THERMAL POWER (MWT): 2436 1144 PWR spent fuel bundles in the 1
4.
NAMEPLATE RATING (GROSS MWE): 867.0 lfuel pool, and 148 fuel bundles in I
- 5. DESIGN ELECTRICAL RATING (NET MWE) 821.0 Ithe fuel storage vault.
l 6.iMAX DEPENDABLE CAPACITY (GROSS MWE). 782.0 1 I
7.
MAX DEPENDABLE CAPACITY (NET MWE)
'754.0 8.
IF CHANGES OCCUR IN CAPACITY RATINGS'(ITEMS 3 THRU 7) SINCE.LAST REPORT, GIVE REASONS:
-Items 6-& 7 reflect new MDC values approved for use by CP&L management as of 1.ugust 15,~1991.
- 9. POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE)
- 10. REASONS FOR RESTRICTION IF ANY:
THIS YR TO CUMUL MONTH DATE-ATIVE ii. HOURS IN REPORTING PEPIOD 744.00 5831.00 138743.00
- 12. NUMBER-0F HOURS REACTUR CRITICAL 744.00 4773.94 89250.75
- 13. REACTOR RESERVE SHUTDOWN HRS
.00
.00
.00
- 14. HOURS GENERATOR ON LINE
-744.00 4697.03 84690.09
- 15. UNIT RESERVE-SHUTDOWN HOURS
.00
.00
. 0 0.
- 14. GROSS THERMAL. ENERGY GEN.-(MWH) 1758328.19 11185963.89 179308713.85
- 17. GROSS ELEC.- ENERGY-GEN. (MWH) 554970.00 3599345.00 57986484.00 18.-NET ELEC., ENERGY GENERATED (MWH) 535845.00 3471125.00 55620431.00
- 19. UNIT SERVICE FACTOR-i00.00 00.57 61.04
-20. UNIT AVAILABILITY FACTOR 100.00 80.57
.61. 04 =
21.. UNIT CAP.-FACTOR-(USING MDC NET) 95.52 78.95 50.04-
-22.EUNIT CAP. FACTOR (USING DER NET) 87.72 72.51 48.83
- 23. UNIT FORCED OUTAGE RATE
.00 19.43-13.41
- 24. SHUTDOWNS SCHED. OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
Refueling shutdown scheduled from 9/12/91 to 12/11/91.
-25.
IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTEUP:
26.-UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION)
FORECAST ACHIEVED INITIAL CRITICALITY
. INITIAL ELECTRICITi COMMERCIAL OPERATION i.16 - 9
DOCKET NO.
050-032a
'urti NAME Bninswick 2 DATE Scotember 1991 COMPLETED BY Ronald Rumele TELEPHONE 919-457-2752 UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH Aaoust 1991 METHOD OF LICENSEE SYSTEM COMPONEr:T CAUSE & CORRECTIVE ACTION TO DURATION SHUTTING DOWN EVENT CODE (4)
CODE (5)
PREVENT RECURRENCE NO.
MTE TYPE (1)
(%URS)
REASON (2)
REACTOR (3)
REPORT NO.91-008 910823 0
B 5
N/A AD P
Reduced power to add oil to 2B Reactor Recirc. Pump. Also performed testing on main generator voltage reggiator, back. washed A-N waterbox and'cor. ducted routine valve testing.
1:
Tvoe 2:
Reason 3:
Nthod 4:
System Code:
5:
Comronent Code F - Forced A-Equipment failure 1-Manual Instructions for Instructions for 5 - 5 heduled (explain) 2-Manual Scram preparation of data entry preparation of data B-Maintenance or test 3-Automatic scram sheats for Licensee Event entry sheets for LER C-Refueling 4-Continuations Report (LER) file from flie from IEEE Standard D-Regulatory 5-Load reductions IEEE Standard 805-1983, 803A-1983, per restriction 6-Other per NUREG-1022, NUREG-1022,Section VI.
E-Operator Training &
Section VI. Item 13.b Item 13.c
(
License Examination F-Adninistrative G-Operational error (explain)
H-Other (emplain) l I
i 90-0041.MSC l
The following are the revised pages of the Monthly Operating Data Reports from January 1991 through July 1991.