Text
-
~
e,.
CP&L.C0<
PLANT PERFORMANCE DATA SYSTEM
'PAGE i
RUN DATE 09/04/91 OPERATING DATA REPORT RPD36-000
-RUN TIME' i3:17:56 BRUNSWICK UNIT i-DOCKET NO. 050-0325 COMPLETED BY RONALD RUMPLE OPERATING STATUS TELEPHONE (919)457-2752 i '. UNIT NAME: BRUNSWICK UNIT-i i NOTES - There are 560 fuel bundled 2..~ REPORTING PER 7.0D : JANUARY 91 l in the Reactor Core. There are 1
- 3. LICENSED THERMAL POWER (MWT)' 2436 1 1090 awn and 160 PWR spent fuel l
4.
NAMEPLATE RATING (GROSS MWE)- 067.0 l bundles in the Fuel Pool. There I
-5.
DESIGN ELECTRICAL RATING (NET _MWE)- 821.0 l are no fuel bundles in the new I
?6. MAX DEPENDABLE CAPACITY (GROSS MWE) 791.0 I ruci Storage vault.
I f7. MAX DEPENDABLE CAPACITY'(NET MWE) 767.0 8.
IF-CHANGES OCCUR IN-CAPACITY-
. lG S (ITEMS 3 THRU 7) SINCE LAST REPORT, GIVE REASONS:
Items 6 and 7 reflect new MDC values
. roved by CP&L management as of August 15, 1991.
9.
POWER-LEVEL TO WHICH_ RESTRICTED IF ANY (NET MWE)
- 10. REASONS FOR RESTRICTION IF ANY:
THIS-YR TO CUMUL MONTH DATE ATIVE iii.-; HOURS IN REPORTING PERIOD 744.00 744.00 121632.00 12._ NUMBER'0F HOURS REACTOR CRITICAL
.00
.00 79302.16
- 13.: REACTOR RESERVE SHUTDOWN HRS
.00
.00 1647.10 1l4. HOURS GENERATOR-ON LINE
.00
.00 75063.24
- 13. UNIT. RESERVE. SHUTDOWN. HOURS
.00
.00
.00 Li6. GROSS THERMAL' ENERGY-GEN. -(MWH)
.00
.00 163197643.18
- 17. GROSS ELEC. _ ENERGY:- GEN. :( MWH)
.00
.00 53533475.00
- 18. NET ELEC ENERGY GENERATED (MWH)_
--2413.00
-2413-.00 51499981.00 19 1tlN1T SERVICE FACTOR
.00
.00 62.37 20.JUNIT AVAILABILITY FACTOR.-
.00
.00 62.37 21.' UNIT CAP.' FACTOR (USING MDC NET)
.42
.42 53.61 22.' UNIT CAP.-FACTOR-(USING DER NET)
.40
.40 51.57 l 23. UNIT FORCED OUTAGETRATE-
.00
.' 0 0 15.04 24.. SHUTDOWNS SCHED. OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH) 25.-IF SHUTDOWN AT END OF. REPORT PERIOD, ESTIMATED DATE OF START UP
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OFERATION)
FORECAST ACHIEVED.
INITIAL CR'ITICHLITY INITIAL ELECTRICITY B
COMMERCIAL OPERATION Revision 1, September 1991 9109100213 910912
--PDR-ADJCK 05000324 i.i6 - 9 R
.. ~
- ~ __.
'dPEL CO PLANT PERFORMANCE DATA SYSTEM PAGE 2
-RUN'DATE 09/04/91 OPERATING-DATA REPORT RPD36-000 RUN TIME -13:17:56 BRUNSWICK UNIT 2 DOCKET NO. 050-0324 COMPLETED BY RONALD RUMPLE
.0PERATING STATUS TELEPHONE (919)457-2752
- i. UNIT NAME BRUNSWICK UNIT 2 i NOTES - There are 560 fuel l
2.-REPORTING PERIOD: JANUARY 91 l bundles in the Reactor Core. Therel
NAMEPLATE RATING (GROSS MWE) 067.O I bundles in the Puel Pool.
There 1
5.
DESIGN ELECTRICAL RATING (NET MWE) 821.0 l are no fuel bundles in the new I
-6.= MAX DEPENDABLE CAPACITY-(GROSS MWE) 782.0 I ruel storage yh. alt.
I 7.
MAX DEPENDABLE CAPACITY (NET MWE). 754.0 8.
IF CHANGES OCCUR IL CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT, GIVE REASONS:
Items 6 and 7 reflect new MDC values approved by CP&L management as of August 15, 1991.
- 9. POWER LEVEL TO WHICH RESTRICTED IF ANY (NET *MWE)
- 10. REASONS FOR RESTRICTION IF ANY THIS YR TO COMUL MONTH DATE ATIVE 11.-HOURS IN REPORTING PERIOD 744.00 744.00 133656.00 i2. NUMBER OF HOURS REACTOR CRITICAL 608.70 608.70 85085.51
- 13. REACTOR RESERVE SHUTDOWN HRS
.00
.00
.00-11 4. HOURS GENERATOR ON LINE 590.58 590.58 80582.84 "15.~ UNIT RESERVE SHUTDOWN HOURS
.00
.00
.00 16.. GROSS THERMAL ENERGY GEN. (MWH) i382159.i2.
1382159.12 169504909.08
- 17. GROSS ELEC. ENERGY GEN. (MWH) 450445.00 450445.00 54837584.00
- 18. NET ELEC. ENERGY GENERATED (MWH) 435194.00 435194.00 52584500.00
- 19. UNIT SERVICE FACTOR 79.38 79.38 60.29 20-.. UNIT AVAILABILITY FACTOR 79.38 79.38 60.29
-22.; UNIT CAP. FACTOR (USING DER NET) 71.25 71.25 47.92 231-UNIT FORCED OUTAGE RATE 20.62 20.62 13.09
- 24. SHUTDOWNS SCHED. OVER NEXT 6 MONTHS (TYPE,'DATE. AND DURATION OF EACH).
- 25. IF SHUTDOWN AT END_OF REPORT PERIOD, ESTIMATED DATE OF START UP
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION)
FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION Revision 1, September 1991 1.16 - 9