Application for Subpoena Directing La Christman to Testify on 831208 in Philadelphia,Pa Re Arco Pipeline Design. Certificate of Svc Encl
ML20082A654
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 11/14/1983
From: Wetterhahn M
CONNER & WETTERHAHN, PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
Atomic Safety and Licensing Board Panel
References
NUDOCS 8311180210
Download: ML20082A654 (8)


Text

,

e DOCKETED USNRC 13 fl0V 17 P255 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION CFFICE OF SECRETtF onCKEilhG&SW C Before the Atomic Safety and Licensing BoazSiANCH In the Matter of

)

)

Philadelphia Electric Company

)

Docket Nos. 50-352

)

50-353 (Limerick Generating Station,

)

Units 1 and 2)

)

APPLICATION FOR SUBPOENA In preparing testimony to respond to contention V-3a, Applicant, Philadelphia Electric Company 'has requested representatives of ARCO Pipe Line Company

(" ARCO")

to prepare written responses to certain questions relating to the design, construction and operation of the ARCO pipe line which passes near the Limerick Generating Station.

While it was understood that the representative of ARCO would be subpoenaed to testify at the hearing, Applicant learned today that ARCO also required a subpoena for the release of any proposed written testimony.

In order to accommodate this request, Applicant applies to the Atomic Safety and Licensing Board for issuance of the attached subpoena.

Inasmuch as a

telephone call to the Board's secretary earlier today determined that the specific location of the evidentiary hearing has not yet been confirmed, the subpoena is general as to its place of return.

For the information of the Licensing

Board, the questions propounded to Mr.

LeRoy A.

Christman, Montello 8311180210 831114 PDR ADOCK 05000352

/0 3

-7

  • District Manager, ARCO Pipe Line Company, the answers to which would constitute the proposed testimony, are attached and become part of the subpoena. /

For the above stated reasons, the attached subpoena should be issued.

Respectfully submitted, CONNER & WETTERHAHN, P.C.

9 Mark J. Wetterhahn Counsel for the Applicant s

November 14, 1983

  • /

Inasmuch as Appl 3 cant cannot require the preparation of written testimony by an independent company, Applicant does not believe that such written prefiled testimony is required under the Commission's rules.

However, in order to assist the Licensing Board and parties, the Company is attempting to have ARCO Pipe Line Company voluntarily submit this proposed testimony in advance.

In any case, ARCO representatives will testify as to the factual circumstances regarding its ownership, design, construction and operation of this pipe line.

i

Enitch 9tates of America NUCLEAR REGULATORY COMMISSION v

In the matter of:

Philadelphia Electric Company (Limerick Generating Station,

>- DOCKET No. 50-352 Units 1 and 2) 50-353 TO LeRoy A. Christman ARCO Pipe Line Company P.O. Box 2086 Sinking Spring, PA 19608 s

YOU ARE HEREBY COMMANDED to a pear..in.. Philadelphia..,..... Pen.nsylvania at a place to be designate inthecityof....................................................................................................................

9:0 on the......... 8 th......... day of....... December......................... 19. 8 3...........a t.............

to testify on behalf o f.....P..h...i..l...a..d..e...l..E...i..a.....E...l..e..c...t..r...i..c.....C..o..m...P.a..n..Y...................

h in the above entitled action and bring with you the document (s) or object (s) described in the attached schedule.

BY ORDER OF THE ATOMIC SAFETY

.O 1.lCENSING BOARD BY ohi1a"M "h~4=

e l a c '*~*~ ~i c C o *

.... 19.....

A

~~~

ATTOttNEJ.FOIC

~ ~

"I:.s q.

Marx hetternann, Conner & n'etternann, F.C.

1747 Pennsv1vania Ave.,N.W. Wash.,D.C. 20006 TELEPHONE 10 C.F.K. 2.120 (t) presseine offscer or, if he is unvaitabie, t*,e On motion rnede promptly, and in any event Commisaan may (1) que or modify the sub-at or before the time specified in the subpoene poens if it is unressonable or requires evidence far compnance by the person to mhom the sub-not relevent to any matter in issue. or (2) con-pcene is dkreted, and on notice to the party at dation denial of the motion on just and reasonable whost basesace s'w subpoene wer Lasued. the terms.

QUESTIONS TO BE ADDRESSED TO LeROY A. CHRISTMAN Q1.

State your name, title, employer and business.

Q2.

Describe your responsibilities in this position.

Q3.

Please describe previous work experience and responsibilities related to your present position.

Q4.

Are you familiar with an ARCO pipe line that traverses Chester and Montgomery Counties, Pennsylvania?

05.

Are you aware of its physical relationship to the

. N Limerick Generating Station and, if so, on what basis?

Q6.

How is the pipe line right-of-way at road cross-i ings identified?

07.

Describe the design and configuration of this pipe line.

08.

Describe the protection of this pipe line against Corrosion.

09.

Identify the products carried by the pipe line.

Q10.

Describe the nearest pumping station above and l

below the point at which the pipe line passes closest to Limerick.

l Qll.

Is the Boot Pumping Station manned or remotely controlled?

Q12.

Describe periodic inspection and maintenance of the pipe line that passes near the Limerick Generating Station which would provide additional information regarding leaks.

o -

Q13.

Describe the devices and procedures utilized for detecting leaks in the pipe line.

Q14.

..Upon detection of a leak by remote monitoring, what systems and procedures are available to stop pumpages?

Q15.

What prc:aure, if any, is maintained in the pipe line when it is not in operation?

Q16.

Describe the operating experience with this pipe line.

l u

\\

s

'r- - - - - - --

--,r.-

v UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION In the Matter of

)

)

Philadelphia Electric Company

)

Docket Nos. 50-352

)

50-353 (Limerick Generating Station,

)

Units 1 and 2)

)

CERTIFICATE OF SERVICE I

hereby certify that copies of

" Application for Subpoena," dated November 14, 1983, in the captioned matter

.have been served upon the following by deposit in the United, m

' -States mail this 14th day of November, 1983:

Christine N. Kohl, Chairman

  • Judge Richard F. Cole Atomic Safety and Licensing Atomic Safety and Licensing Appeal Board Board U.S. Nuclear Regulatory U.S. Nuclear Regulatory Commission Commission Washington, D.C.

20555 Washington, D.C.

20555 Gary J. Edles

  • Judge Peter A. Morris Atomic Safety and Licensing Atomic Safety and Licensing Appeal Board Board U.S. Nuclear Regulatory U.S. Nuclear Regulatory I

Commission Commission

(

Washington, D.C.

20555 Washington, D.C.

20555 Dr. Reginald L. Gotchy Atomic Safety and Licensing Atomic Safety and Licensing Appeal Panel l

l Appeal Board U.S. Nuclear Regulatory U.S. Nuclear Regulatory Commission Commission Washington, D.C.

20555 Washington, D.C.

20555 Docketing and Service Section

  • Judge Lawrence Brenner (2)

Office of the Secretary Atomic Safety and Licensing U.S. Nuclear Regulatory Board Commission U.S. Nuclear Regulatory Washington, D.C.

20555 Commission Washington, D.C.

20555 Hand Delivery l

l

Ann P. Hodgdon, Esq.

David Wersan, Esq. Consumer Counsel for NRC Staff Office Assistant Advocate of the Executive Office of Consumer Advocate Legal Director 1425 Strawberry Square U.S. Nuclear Regulatory Harrisburg, PA 17120 Commission Washington, D.C.

20555 Steven P. Hershey, Esq.

Community Legal Atomic Safety and Licensing Services, Inc.

Board Panel Law Center West North U.S. Nuclear Regulatory 5119 Chestnut Street Commission Philadelphia, PA 19139 Washington, D.C.

20555 Angus Love, Esq. 101 East Philadelphia Electric Company Main Street Norristown, PA ATTN:

Edward G. Bauer, Jr.

19401 Vice President &

l General Counsel Mr. Joseph H. White, III 1

2301 Market Street 15 Ardmore Avenue

..s Philadelphia, PA 19101 Ardmore, PA 19003 Mr. Frank R. Romano Robert J. Sugarman, Esq.

61 Forest Avenue Sugarman & Denworth Suite Ambler, Pennsylvania 19002 510 North American Building 121 South Broad Street Mr. Robert L. Anthony Philadelphia, PA 19107 Friends of the Earth of the Delaware Valley Director, Pennsylvania j

106 Vernon Lane, Box 186 Emergency Management Agency i-Moylan, Pennsylvania 19065 Basement, Transportation and Safety Building Mr. Marvin I. Lewis Harrisburg, PA 17120 6504 Bradford Terrace Philadelphia, PA 19149 Martha W. Bush, Esq.

Kathryn S. Lewis, Esq.

Judith A. Dorsey, Esq.

City of Philadelphia 1315 Walnut Street Municipal Services Bldg.

Suite 1632 15th and JFK Blvd.

L Philadelphia, PA 19107 Philadelphia, PA 19107 i

Charles W. Elliott, Esq.

Spence W. Perry, Esq.

L Brose and Postwistilo Associate General Counsel l

1101 Building Federal Emergency

)

lith & Northampton Streets Management Agency Easton, PA 18042 500 C Street, S.W., Rm. 840 Washington, DC 20472 Ruttenberg Jacqueline I.

Keysteon Alliance 3700 Chestnut Street Philadelphia, PA 19104 4

e

o Thomas Y. Au, Esq.

Assistant Counsel Commonwealth of Pennsylvania DER 505 Executive House P.O. Box 2357 Harrisburg, PA 17120 Thomas Gerusky, Director Bureau of Radiation Protection Department of Environmental Resources 5th Floor, Fulton Bank 31dg.

Third and Locust Streets Harrisburg, PA 17120 Jay M. Gutierrez, Esq.

U.S. Nuclear Regulatory Commission Region I 631 Park Avenue King of Prussia, PA 19406 Zori G. Ferkin Commonwealth of Pennsylvania Governor's Energy Council P.O. Box 8010 1625 N. Front Street Harrisburg, PA 17105 MarkuJ. Wetterhahn

- - > ~ - -, - - -, ~


n.

____,.