Monthly Operating Rept for Feb 1995 for Monticello Nuclear Generating Plant
ML20081D723
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 02/28/1995
From: Richard Anderson, Paustain H
NORTHERN STATES POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9503200376
Download: ML20081D723 (6)


Text

.

M1995060 Northem States Power Company -

Monticello Nuclear Generating Plant 2807 West Hwy 75 Monticello. Minnesota 55362-9637 i

I-s March 13,1995 Monticello Technical Specification 6.7.A.3 US Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 4

MONTICELLO NUCLEAR GENERATING PLANT Docket No. 50-263 License No. DPR-22 Submittal of Monticello Monthly Operatino Report for February.1995 In accordance with Monticello Technical Specification 6.7.A.3, the report of operating statistics for the Monticelto Nuclear Generating Plant for '.he Month of February is provided as Attachment A.

Please contact Mary Engen, Sr Licensing Engineer, at (612) 295-1291 if you require further information,

% KoA oger O Anderson Director Licensing and Management issues l

c:

Regional Administrator-Ill, NRC NRR Project Manager, NRC Sr Resident inspector, NRC State of Minnesota Attn: Kris Sanda l

J Silberg 9503200376 950228 016 PDR ADOCK 05000263

(

R PDR i

k

~..

I, l

-OPERATING DATA REPORT.

5 DOCKET NO.

50-263~

i

+

DATE' 3-1-95 i

_ COMPLETED BY-H. H.-Paustian.

1TELEPHONEL 612/295-5151 l'

OPERATING STATUS l

4

] Notes J

l'.:ll. Unit Name.

'Monticello

-]'-

li L:2.Reportingh'eriod:

February

)

-]-

L:3. Licensed Thermal Power-(MWt):

'1670-

]

]

!'~4.: Nameplate Rating.(Gross-MWe):

569';]

]

' -: 5. Design Electrical. Rating =(Net?MWe):

545.4

-]

]

6.. Maximum DependableLCapacity-(Gross-MWe)::

564;']

]

17. Maximum Dependable Capacity (NetiMWe):

__536fJ];

~]

y f<8. If Changes occur in Capacity Ratings. '(Items :Numberq3 Through 7). Since.-Last' j

Report, Give Reasons:

I i

!i ?9. L Power ' Levelt To Which~ Restricted,. If! Any' [(Net' MWe)':

N/A

10. ReasonssFor Restrictions lEIf'Any: __N/A.

E I

.THIS MONTH.

YR5-TO-DATET CUMULATIVE-I i:11. Hours In1 Reporting Period

'672

..-1416:

207457E F12.lNumber Of Hours Reactor-Was Crit'ical 672.0' c1416.0 1168415.9:

1

13.. Reactor Reserve Shutdown Hours 0.0

. -0; 0 :

940.7 F14. Hours Generator On-Line

-672.0' 1416'.'0 L 1165526".=9

.15. Unit Reserve Shutdown Hours 0.0 J0.01 x0.0-I l16. Gross Thermal Energy Generated (MWH)

-1121940 23599511 255846403 j.17.-Gross Electrical Energy Generated-(MWH) 383509 280775U 86491229

<18. Net Electrical Energy _. Generated (MWH)

.370082

779581H 82754691
19. Unit Service Factor 100.0%;

100.0%!

79.8%

F20. Unit-Availability Factor 100.0%

100'.~0%

'79.8%

! 21. Unit Capacity Factor-(Using MDC Net)-

102.7%

<102.7%.

.74.4%~

[22.l Unit Capacity Factor (Using DER Net).

101.0%:

100,9%

73.1%

23.: Unit Forced. Outage Rate

24. Fhutdowns Scheduled Over Next 12 Months. 0.0%

010%

3.6%

(Type, Date, and Duration'of Each)

_None L25. If Shut Down At End Of Report Period, Estimated Date Of Startup:N/A.

26. Units In Test Status (Prior to Commercial' Operation): N/A Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

,m-_

AVERAGE DAILY UNIT POWER LEVEL a

DOCKET NO.

50-263 i

J UNIT Monticello--

DATE 3-1-95 COMPLETED BY H. H.

Paustian j

TELEPHONE 612/295 5151 1

MONTH OF February DAY AVERAGE DAILY POWER LEVEL-DAY AVERAGE DAILY POWER LEVEL j

(MWe-Net)

(MWe-Net) 1 551.

17 550.

l

~

2 552.

18 552.

j 3

551.

19 551.

4 552.

20 551.

l' 5

52.

21 550.

6 548.

22 551.

7 553.

23 550.

8 549.

24 550.

9-554.

25 551.

10 551.

26 550.

11 551.

27 549.

4 12 549.

28 549.

13 551.

14 551.

4 15 551.

16 551.

INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.

Compute to the nearest whole megawatt.

i u--

v

l NARRATIVE

SUMMARY

OF OPERATING EXPERTENOB' DOCKET 110, 50-263 L

DATE 3-1-95 l

. COMPLETED BY H. H.

Paustian l-TELEPHONE 612/295-5151 l

MONTH FEB' 2-01-95

(

to Power operation.

L 2-28-95 i

l l

Note: Power operation defined as essentially 100% of rated power except for weekend load drops-for specified surveillance testing, f

INIT SHUIDOWNS AND POWER REDUCTIONS D00GT NO. 50-263 IMIT NAME Monticello DATE 13-01-95 COMPLETED BY 11. H. Paustian REPORT MONTH February _

TEJEPHONE 312/295-515k -

No.

Date.

Type Duration Reason Method IRt System Cause L Corrective

'(1)

(hours)

(2) of No.-

Code Action to Shutdown (4)

(5)

Prevent Recurrence (3)

N***

t 1

2 3 -

4 F: Forced-.

Reason:

Method: -

Draft IEEE St h S: Scheduled-A-Equipment Failure (Explain).

'1-Manual 805-1984(P805-DS)

B-Mainten&nce or Test-2-Manual Scram C-Refueling 3-Automatic Scram 5

tor Restriction 4-Other (Explain).

IEEE Standard 803A-1983 rator Training & License Examination F

nistrative G-Operational Error (Explain)

U-Other (Explain)

.-...a

= -

_. _ _ _. _. _ - - -.. - - - - - - _ _ - - _ - - - - _ - - - _ - - _, ~ - _

a

,.e

. l; l

TRANSMITTAL MANIFEST NORTHERN STATES POWER COMPANY.

NUCLEAR LICENSING DEPARTMENT?

MONTICELLO NUCLEAR GENERATING PLANT Monthly Operating Report.

February.1995 ~

~

Correspondence Date: March 13,-1995 Monticello Intemal Site Distribution -

g

' *Monti Document Control File -

C A Schibonski

.W J Hill-Monti Site Lic File

. Steve Ray, SR Res Insp, NRC NSP Intemal Distribution E L Watzt.

$n' M D Wadley we Extemal NSP Distribution g

g Kris Sanda, State of Minn Regional Admin-lll,NRC J E Silberg t

i Beth Wetzel, NRR-PM, NRC ANI Library.

l Dir, Off of Resource Mgmt INPO Record Center l

l

  • Advance Distribution made by Site Licensing Manifest Date: March 13,1995 l.