ML20081A148
| ML20081A148 | |
| Person / Time | |
|---|---|
| Site: | Harris |
| Issue date: | 02/07/1984 |
| From: | Felton J NRC OFFICE OF ADMINISTRATION (ADM) |
| To: | Eddleman W EDDLEMAN, W. |
| Shared Package | |
| ML20079F427 | List:
|
| References | |
| FOIA-84-35 NUDOCS 8403050064 | |
| Download: ML20081A148 (4) | |
Text
DDL-oto se nsou V
'o,,
UNir
- TES
{
g NUCLEAR REG'
COMMISSION g
wash sss a
@h Docket No. 50-400/401 F.
hs.
Mr. Wells Eddleman Staff Scientist Box 2901 IN RESPONSE REFER Durham, NC 27705 TO F01A-84-35
Dear Mr. Eddleman:
This is in partial response to your letter dated January 12, 1984, in which you requested, pursuant to the Freedom of Information Act, all extant drafts of sections or portions of the Safety Evaluation Report (SER) for the Shearon Harris Nuclear Power Plant, along with documents showing dissenting opinions of the staff reviewers.
Appendix A is list of documents responsive to your rev 1.
These documents are being placed in the NRC Local Public Document Roon. (LPDR) located at the Wake County Public Library,104 Fayetteville Street, Raleigh, North Carolina, 27601. In order to obtain access to these documents, please contact Mr. Roy Dicks at the LPDR on (919) 755-6092.
Our search for additional documents relevant to your request is continuing.
You will be notified later of our determination.
Si nc,erely,,
g' 'f J. ft. Felton, Director Division of Rules and Records s
Office of Administration
Enclosure:
Appendix A 8403050044 840207' PDR FOIA EDDLEMANB4-35 PDR l
_ - _ - - - - - - - - - - - - - - - - - - - - - - - - - - - - - ^ - - - -
..I R1:
F01A<4-35 c~,
s APPENDIX A 1.
Memo 4-27-82, from Benaroya to Miraglie, " Request for Additional Information on Shearon Harris Nuclear Power-Plant, Unit Nos.1 and 2."
.(4 pages)
- 2. _ Memo 5-17-82, from Benaroya to Miraglia, " Fire Protection Request for Information for'Shearon Harris Units 1-4." (7 pages) 3.
Memo 10-29-82, from Knight to Novak, "Leaft Safety Evaluation Report -
Geology and Seismology - Shearon Harris, Units 1 and 2." (22 pages) 4.
Memo 10-21-02, from Ruben,tein to Novak, "Shearon Harris Draft Safety Evaluation Report." (70 rages) 5.
Memo 10-28-8E, from Ben:1roya to Knighton, "Shearon Harris Draft Safety Evaluation." (1 page) 6.
Memo 11-4-82, from Rubenstein to Novak, " Draft Safety Evaluation Report for Shearon Harris Nuclear Power Plant." (171 pages) 7.
Memo 11-9-82, from Lear to Kerrigan thru Knight, 0 raft Safety Evaluation Input and Requests for Additional Information - Geotechnical Engineering."
(40-pages) 8.
Memo 11-17-82, from Johnston to Novak, " Draft Safety Evaluation for Shearon Harris Nuclear Power Plant,-Units 1 and 2 (0L), Carolina Power & Light Company, Docket Nos. 50-400/401." (21 pages) 9.
Memo 12-3-82, from Lear to Knighton thru Knight, " Hydrologic Engineering Input to the Shearon Harris Draft SER."
(25 pages)
~
- 10. Memo 12-6-82, from Knight to Novak, " Draft Safety Evaluation Report."
(16 pages)
- 11. Memo 12-21-82, from Knight to Lainas, " Revision i to Draft Safety Evaluation Report - Geology and Seismology - Shearon Harris, Units 1 and 2."
(24 pages)
- 12. Memo 12-22-82, from Muller to Novak, "Shearon Harris Draft SER Input."
(9pages) 13.'
Memo 1-10-83, from Johnston to Novak, " Supplemental Safety Evaluation Report Input for Environmental Qualification of Mechanical and Electrical
. Equipment for Shearon Harris." -(3 pages)
- 14. Memo 8-26-83, from Knight to Novak, " Safety Evaluation Report for Ervironmental Qualification of Equipment Important to Safety for Shearon Harris Units 1 and 2."
(5pages) l J
R:
FOIA-84-35 APPENDIX A
- 15. Memo 8-31-83, from Rubenstein to Novak, " Safety Evaluation Report -
Shearon Harris Units 1 and 2."
(78 pages) 16 Memo 9-1-83, from Rubenstein to Novak, "Shearon Harris Safety Evaluation Report." (69pages) 17, Memo 9-2-83, from Lear to Knighton thru Knight, " Final Safety Evaluation Report - Geotechnical Engineering."
(27pages) 18, Memo 9-8-85, from Knight to Novak, " Safety Evaluation Report - Geology and Seismology - Shearon Harris, Units 1 and 2."
(45pages)
. M. Report, 8-22-83, Shearon Harris SER (M), " Auxiliary Systems."
(50 pages).
- 20. Memo 9-14-83, from Rubenstein to Novak, " Safety Evaluation Report for Shearon' Harris Nuclear Power Plant, Units 1 and 2, Auxiliary Systems Brar.ch." (243 pages)
- 21. Memo 9-14-83, from Johnston to Novak, " Hydrologic Engineering Input to the Shearon Harris SER."
(24 pages)
- 22. Memo 9-15-83, from Knight to Novak, " Safety Evaluation Report (Structural Engineering)."
(16 pages)
- 23. Memo 9-21-83, frorn Russell to. Novak, "SER for Shearon Harris Nuclear Power Plant - Plant Personnel Training,"
(21 pages)
- 24. Memo 10-4-83, from Kniel to Knighton, "SER Input - Shearon Harris Nuclear Station, Units.1 and 2."
(26 pages)
- 25. Memo 10-6-83, from Knight to Novak, "Shearon Harris Nuclear Power Plant Unit #1."
(4 pages)
- 26. Memo 10-6-83, from Johnston to Novak, " Safety Evaluation for Shearon Harris Nuclear Power Plant, Units 1 & 2 (OL), Carolina Power & Light Company, Docket Nos. 50-400/401."
(3 pages)
- 27. Memo 10-7-83, from Houston to Novak, "Shearon Harris 1 & 2 - Safety Evaluation Report (SER)."
(49pages)
- 28. Memo 10-11-83, from Johnston to Novak, "Shearon Harris SER Input."
(6pages)
- 29. Memo 10-28-83, from Rubenstein to Novak (Enclosure 3), "Shearon Harris SER Update - Docket Nos. 50-400/401."
(50 pages)
[
Ra:
F01A-84-35 APPENDIX A 30, Memo 10-28-83, from Lear to Knighton, "Shearon Harris SER Input (Revision) - Structural Engineering."
(4 pages)
- 31. Memo 11-9-83, from Partlow to Youngblood, " Harris Draft SER Section 17."
.(3 pages)
- 32. Memo 11-3-83, from Johnston to Novak, " Fire Protection Revisod Safety Evaluation Report - Shearon Harris Units 1-4."
(2 pages) 33, Memo 11-10-83, from Johnston to Novak, " Revised Hydrologic Engineering
-Input to the Shearon Harris SEP."
(15 pages)
- 34. Memo 11-14-83, from Lear to Knighton, "Shearon Harris SER Input (Revision) - Structural Engineering."
(3 pages) 35, Memo 11-17-83, from Rubenstein to Novak (Enclosure 4), "Shearon Harris ~SER Update (Docket Nos. 50-400/401),"
(89pages)
.36.
Memo 11-18-83, from Muller to Novak, "METB Input for Safety Evaluation-Report for Shearon Harris, Unit Nos 1 and 2."
(275 pages) f 37, Memo 11-18-83, from Lear to Knighton thru Knight, " Update to Final
(
Safety Evaluation Report - Geotechnical Engineering "
(6pages) 38,- Memo 11-18-83, from Johnston to Novak, "Shearon Harris SER Input-Supplement."
(2pages)
- 39. Memo 11-23-83,- from Srinivasan to Sheron, "PSB Review of Draft Safety Evaluation Report Response to Open Item 47 on Reactor Coolant System Vents for Sheat on Harris Units 1 and 2 - Docket Nos. 50-400 and 50-401."
-(2 pages)
- 40. Memo (undated) from Matthews to Knighton, " Emergency Preparedness Input. for Shearon Harris SER."
(36 pages)
- 41. Memo 12-14-83, from Johnston to Novak, " Fire Protection Supplemental Safety Evaluation Report.".(12 pages)
_ _ _ _ _ _ _