Advises That,Due to Need to Coordinate Effort W/Auxiliary Sys Branch,Revised SER to Be Submitted on 831127 Will Still Contain Listed Fire Protection Open Items
ML20081K874
Person / Time
Site: Harris  Duke Energy icon.png
Issue date: 11/03/1983
From: Johnston W
Office of Nuclear Reactor Regulation
To: Novak T
Office of Nuclear Reactor Regulation
Shared Package
ML20079F427 List:
References
FOIA-84-35 NUDOCS 8311140004
Download: ML20081K874 (2)


Text

_

+

"a.

t'W 3 19C,'

MEMORANDUM FOR:

Thomas Novak, Assistant Director for Licensing Division of Licensing FROM:

William V. Johnston, Assistant Director Materials, Chemical & Environmental Technology Division of Engineering

SUBJECT:

FIRE PROTECTION REVISED SAFETY EVALUATION REPORT -

SHEARON HARRIS UNITS 1-4 Plant Name: Shearon' Harris Nuclear Power Plant Units 1-4 Docket Nos.:

50-400-403 Milestone No.:

N/A Licensing Branch:

LB #3 Project Manager:

B. Buckley CMEB Reviewer:

R. Eberly Requested Completioin Date:

October 27, 1983 Review Status:

21 open items In our Safety Evaluation Report, we identified 21 open fire protection items:

1.

Fire Protection Program BTP CMEB 9.5-1 Section C.1.a 2.

Fire Hazards Analysis BTP CMEB 9.5-1 Section C.1.b 3.

Administrativa Controls BTP CMEB 9.5-1 Section C.2 4.

Fire Briga8e Size BTP CMEB 9.5-1 Section C.3 5.

Penetration Seals BTP CMEB 9.5-1 Section C.S.a 6.

Fire Doors.

BTP CMEB 9.5-1 Section C.5.2 7.

Metal Roof Deck Constructior> BTP CMEB 9.5-1 Section C.5.2 8.

Stairwell Enclosures BTP CMEB 9.5-1 Section C.5.a 9.

Safe Shutdown BTP CMEB 9.5-1 Section C.S.b 2

10.

Alternate Shutdown BTP CMEB 9.5-1 Section C.5.c 11.

Cable Tray Protection BTP CMEB 9.5-1 Section C.S.e 12.

Power Supplies for BTP CMEB 9.5-1 Section C.S.f Ventilation 13.

Emergency Lighting BTP CMEB 9.5-1 Section C.S.g 14.

Fire Detection BTP CMEB 9.5-1 Section C.6.a 15.

Fire Pump Separation BTP CMEB 9.5-1 Section C.6.b 16.

Separation of Safety-related cBTP CMEB 9.5-1 Section C.7.a Components in Containment 1..

Control Room Complex BTP CMEB 9.5-1 Section C.7.b 18.

Suppression in Control Room BTP CMEB 9.5-1 Section C.7.b Ceiling

-19.

Detection in Control Room BTP CMEB 9.5-1 Section C.7.b Cabinets 20.

Cable Spreading Room BTP CMEB 9.5-1 Section C.7.c 21.

Remote' Safety Related BTP CMEB 9.5-1 Section C.7.f Panels XA C y

W Has Been Sent to pop e

~

Th 5.as t', oval l' W 3 er t

On October 21, 15:83, we received the applicant's infomation arressin7 the open itens, you requested that w provide a revised Str. tiy rttnNr 27, 1983.

He agreed with the Pil to complete our revice of this infomation by Hovenber 17, 1983.

It will rer;uire an expedited review to rect this date.

The open items concerning post-fire shutdown capability require coordination and input frc AS?.

They have inforned us that they t:fil not be completed by October 17, 1983, therefore our revised SER will contain open itens.

/

pohnston, Assistant Dir

!!illiam V.

fiaterials, Chemical & Environnental Technology Division of Engineering

Contact:

R. Eberly x24302 cc:

R. Vollner D. Eisenhut i

W. Johnston R. Ferguson 1

0. Parr N. Wagner B. Buckley I

J. Taylor S. Pawlicki,

  • e T. Sullivan i

t R. Eberly S. Ebneter, Re'gfon I T. Conlon, Redfon II I

C. ?!orelius, Region III i

G. Madsen, Region IV P. Sternberg, Region Y i

DISTRIBUTION Central Files CMEB Reading CHEB P1 ant I

d DE:CMEB DE EB l

@.MCET cea>....t.y...................DE:CMEB

    • > reb [m,,iy, j p,, R[e,rg,, gn,,, y B en a,rM,,,,p..

, pygp6pstpp,.

........ /..p. 8 3 '.....7..."....'.........................,.,.,.,,

11/1/83

Lup...................[.......11/.}./.83-11/ /83 ll L

.