MEMORANDUM FOR:
Thomas Novak, Assistant Director for Licensing Division of Licensing FROM:
William V. Johnston, Assistant Director Materials, Chemical & Environmental Technology Division of Engineering
SUBJECT:
FIRE PROTECTION REVISED SAFETY EVALUATION REPORT -
SHEARON HARRIS UNITS 1-4 Plant Name: Shearon' Harris Nuclear Power Plant Units 1-4 Docket Nos.:
50-400-403 Milestone No.:
N/A Licensing Branch:
LB #3 Project Manager:
B. Buckley CMEB Reviewer:
R. Eberly Requested Completioin Date:
October 27, 1983 Review Status:
21 open items In our Safety Evaluation Report, we identified 21 open fire protection items:
1.
Fire Protection Program BTP CMEB 9.5-1 Section C.1.a 2.
Fire Hazards Analysis BTP CMEB 9.5-1 Section C.1.b 3.
Administrativa Controls BTP CMEB 9.5-1 Section C.2 4.
Fire Briga8e Size BTP CMEB 9.5-1 Section C.3 5.
Penetration Seals BTP CMEB 9.5-1 Section C.S.a 6.
Fire Doors.
BTP CMEB 9.5-1 Section C.5.2 7.
Metal Roof Deck Constructior> BTP CMEB 9.5-1 Section C.5.2 8.
Stairwell Enclosures BTP CMEB 9.5-1 Section C.5.a 9.
Safe Shutdown BTP CMEB 9.5-1 Section C.S.b 2
10.
Alternate Shutdown BTP CMEB 9.5-1 Section C.5.c 11.
Cable Tray Protection BTP CMEB 9.5-1 Section C.S.e 12.
Power Supplies for BTP CMEB 9.5-1 Section C.S.f Ventilation 13.
Emergency Lighting BTP CMEB 9.5-1 Section C.S.g 14.
Fire Detection BTP CMEB 9.5-1 Section C.6.a 15.
Fire Pump Separation BTP CMEB 9.5-1 Section C.6.b 16.
Separation of Safety-related cBTP CMEB 9.5-1 Section C.7.a Components in Containment 1..
Control Room Complex BTP CMEB 9.5-1 Section C.7.b 18.
Suppression in Control Room BTP CMEB 9.5-1 Section C.7.b Ceiling
-19.
Detection in Control Room BTP CMEB 9.5-1 Section C.7.b Cabinets 20.
Cable Spreading Room BTP CMEB 9.5-1 Section C.7.c 21.
Remote' Safety Related BTP CMEB 9.5-1 Section C.7.f Panels XA C y
W Has Been Sent to pop e
~
Th 5.as t', oval l' W 3 er t
On October 21, 15:83, we received the applicant's infomation arressin7 the open itens, you requested that w provide a revised Str. tiy rttnNr 27, 1983.
He agreed with the Pil to complete our revice of this infomation by Hovenber 17, 1983.
It will rer;uire an expedited review to rect this date.
The open items concerning post-fire shutdown capability require coordination and input frc AS?.
They have inforned us that they t:fil not be completed by October 17, 1983, therefore our revised SER will contain open itens.
/
pohnston, Assistant Dir
!!illiam V.
fiaterials, Chemical & Environnental Technology Division of Engineering
Contact:
R. Eberly x24302 cc:
R. Vollner D. Eisenhut i
W. Johnston R. Ferguson 1
- 0. Parr N. Wagner B. Buckley I
J. Taylor S. Pawlicki,
- e T. Sullivan i
t R. Eberly S. Ebneter, Re'gfon I T. Conlon, Redfon II I
C. ?!orelius, Region III i
G. Madsen, Region IV P. Sternberg, Region Y i
DISTRIBUTION Central Files CMEB Reading CHEB P1 ant I
d DE:CMEB DE EB l
@.MCET cea>....t.y...................DE:CMEB
- > reb [m,,iy, j p,, R[e,rg,, gn,,, y B en a,rM,,,,p..
, pygp6pstpp,.
........ /..p. 8 3 '.....7..."....'.........................,.,.,.,,
11/1/83
Lup...................[.......11/.}./.83-11/ /83 ll L
.