ML20071Q199

From kanterella
Jump to navigation Jump to search

Application to Amend Licenses NPF-4 & NPF-7 Changing Radiological Effluent Tech Specs to Delete Radiological Sampling,Monitoring & Reporting Requirements in Accordance w/NUREG-0472,Revision 3
ML20071Q199
Person / Time
Site: North Anna  Dominion icon.png
Issue date: 12/17/1982
From: Stewart W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To: Clark R, Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML20023B337 List:
References
RTR-NUREG-0472, RTR-NUREG-472 679, NUDOCS 8212290248
Download: ML20071Q199 (3)


Text

'

y VIRGINIA ELucrnIc Axn Powen CowrAxy Ricnwoxn,V woixiA 20u61 W. L. STEWART wcE=" . o7.7.i.. December 17, 1982 Mr. Harold R. Denton, Director Serial No. 679 Office of Nuclear Reactor Regulation N0/JHL:acm Attn: Mr. Robert A. Clark, Chief Docket Nos. 50-338 i Operating Reactors Branch No. 3 50-339 Division of Licensing License Nos. NPF-4 U. S. Nuclear Regulatory Commission NPF-7 Washington, D. C. 20555 Gentlemen:

AMENEMENT TO OPERATING LICENSES NPF-4 AND NPF-7 NORTH ANNA POWER STATION UNIT NOS. 1 AND 2 PROPOSED TECHNICAL SPECIFICATION CHANGES Pursuant to 19 CFR 50.90, the Virginia Electric and Power Company requests an ,

amendment, in the form of changes to the Technical Specifications, to Operating Licenses NPF-4 and NPF-7 for North Anna Power Station, Unit Nos. I and 2. The proposed changes are enclosed.

The proposed changes are to include the Radiological Effluent Technical  :

Specifications into the North Anna Units 1 and 2 Appendix A Technical Specifications and delete all radiological sampling, monitoring and reporting requirements from the Appendix B Technical Specifications. These changes are requirements that are in accordance with NUREG-0472, Revision 3. The proposed changes to the Appendix A and B Technical Specifications are provided in Attachment 1. Justifications for deviating f rom NUREG-0472, Revision 3 are provided in Attachment 2. Attachment 3 provides the justification for changing the sampling frequency of the Waste Gas Decay Tank from at least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> to once per month when radioactive materials are being added to the tank.

/ l Enclosed as Attachments 4 and 5 are the North Anna Power Station Offsite Dose l' Calculation Manual and Process Control Program. The Offsite Dose Calculation Manual and Process Control Program are also requirements of NUREG-0472, j/g Revision 3 but are not to be included in the proposed changes to the Technical Specifications. These documents have been approved by the Station Nuclear l gge Safety and Operating Committee. '

,g Vepco requests that the Radiclogical Effluent Technical Specifications,

  1. Offsite Dose Calculation Manual and Process Control Program be fully implemented by January 1, 1984. This will enable enough time to develop procedures and fully train personnel.

This request has been reviewed and approved by the Station Nuclear Safety and  !

Operating Committee and the Safety Evaluation and Control staff. It has been i determined that this request does not involve an unreviewed safety question as  ;

defined in 10 CFR 50.59. .

8212290248 821217 PDR ADOCK 05000338 -

P PDR

, a Vinoixta ELECTRIC AND Powra COMPANY TO Harold R. Denton We have evaluated this request in accordance with the criteria in 10 CFR 170.22. Since this request involves a safety issue which the Staff should be able to determine does not pose a significant hazards consideration for Unit I and a duplicate safety issue for Unit 2, a Class III license amendment fee and a Class I license amendment fee are required for Unit I and Unit 2, respectively. A voucher check in the amount of $4,400 is enclosed in payment of the required fees.

Very truly yours.

~

. - ti.,

W. L. Stewart Attachments:

1. Proposed Technical Specification Changes - Units 1 and 2
2. Justifications for Deviating from NUREG-0472 Revisfor 3
3. Justification for Changing the Sampling Frequency of the Waste Gas Decay Tank
4. Offsite Dose Calculation Manual
5. Process Control Program
6. Voucher Check No. 84651 for $4,400 cc: Mr. James P. O'Reilly Regional Administrator Region II Mr. Andrew J. Cassell Franklin Research Center I

s e

r--

COMMONWEALTH OF VIRGINIA )

)

CITY OF RICHMOND )

The ' foregoing document was acknowledged before me, in and for the City and Commonwealth aforesaid, today by W. L. Stewart who is Vice President -

Nuclear Operations, of the Virginia Electric and Power Company. He is duly authorized to execute and file the foregoing document in behalf of that Company, and the statements in the document are true to the best of his knowledge and belief.

Acknowledged before me this /7 day of lot t , 19' 8 2- .

My Commission expires: [IdA

[3 , 19 80 .

oE lU*

Notary Pubjffe hw (SEAL)

.~

3 M7/020 ' v.j i

e 1

_ _ - . . _ . _ _ - . . - _ . , 4 , - .

_ . , , _ , - - - . . . . _ - - , _ _ . _ . , _ _ - - _ _ . . - _ _ , , _ . _ . , , , - . _ _ .__._.,_.--___-