ML20066D065

From kanterella
Jump to navigation Jump to search
Proposed Tech Specs Re Surveillance Requirements for Recording Conductivity of RCS
ML20066D065
Person / Time
Site: River Bend Entergy icon.png
Issue date: 01/07/1991
From:
GULF STATES UTILITIES CO.
To:
Shared Package
ML20066D060 List:
References
NUDOCS 9101140097
Download: ML20066D065 (1)


Text

.

ENCLOSURE

.,.~:

l

. REACTOR COOLANT SYSTEM'

(; -SURVEILLANCE REQUIREMENTS-(Continued)

c. Continuously recording the conductivity of the reactor coolant or # i wher,-the continuous recording cent:t!"ityW--is inoper:ble fen ep_te31-daysfobtaininganin-lineconductivitymeasurementat-least I once per:
1. 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> in OPERATIONAL CONDITIONS 1, 2 and 3, and -
2. 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> at all other times,
d. Performance of a CHANNEL CHECK of the continuous conductivity monitor with an in-line flow cell at least once per:
1. 7 days, and
2. 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> whenever conductivity is greater than the limit in Table 3.4.4-1.

A i

, i _

-l RIVER BEND - UNIT 1 3/4 4-16 9101140097 910107 PDR ADOCK 03000459 P PDR