Letter Sequence Other |
---|
|
|
MONTHYEARML20066B6631982-11-0505 November 1982 Proposed Tech Specs Re Schedule for Placing Unit in Hot Standby After Plant Goes Outside Bounds of Action Statement Project stage: Other ML20066B6541982-11-0505 November 1982 Application to Amend License NPF-3,changing Time within Which Unit Must Be Placed in Hot Standby After Plant Goes Outside Bounds of Action Statement Project stage: Request ML20066B6441982-11-0505 November 1982 Forwards Application to Amend License NPF-3,changing Time within Which Unit Must Be Placed in Hot Standby After Plant Goes Outside Bounds of Action Statement Project stage: Request ML20074A4231983-05-0909 May 1983 Responds to Re Proposed Changes to Tech Specs 3.0.3 & 4.0.3.Check in Payment of Fee Transmitted Project stage: Request 1982-11-05
[Table View] |
Proposed Tech Specs Re Schedule for Placing Unit in Hot Standby After Plant Goes Outside Bounds of Action StatementML20066B663 |
Person / Time |
---|
Site: |
Davis Besse |
---|
Issue date: |
11/05/1982 |
---|
From: |
TOLEDO EDISON CO. |
---|
To: |
|
---|
Shared Package |
---|
ML20066B646 |
List: |
---|
References |
---|
TAC-43038, NUDOCS 8211090125 |
Download: ML20066B663 (6) |
|
|
---|
Category:TECHNICAL SPECIFICATIONS
MONTHYEARML20216E6111999-09-0707 September 1999 Proposed Tech Specs 3/4.3.2.1 Re Safety Features Actuation Sys Instrumentation & Associated Bases ML20210H0731999-07-28028 July 1999 Proposed Tech Specs 3/4.7.5.1, Ultimate Heat Sink, Allowing Plant Operation in Modes 1-4 with Water Temp Less than or Equal to 90 F ML20210G4311999-07-27027 July 1999 Proposed Tech Specs,Changing TSs 6.4, Training, 6.5.2.8, Audits, 6.10, Record Retention, 6.14, Process Control Program & 6.15, Odcm ML20210G4801999-07-26026 July 1999 Proposed Tech Specs 3/4.3.2.1 Re Safety Features Actuation Sys Instrumentation & Associated Bases ML20210G9161999-07-26026 July 1999 Proposed Tech Specs 3/4.3.3.1, Radiation Monitoring Instrumentation, 3/4.3.3.2, Instrumentation - Incore Detectors & 3/4.3.3.9, Instrumentation - Waste Gas Sys Oxygen Monitor ML20210G5391999-07-26026 July 1999 Proposed Tech Specs Re Implementation of 10CFR50,App J, Option B for Type B & C Containment Leakage Rate Testing ML20195F9351999-06-10010 June 1999 Proposed Tech Specs,Revising TS 3/4.6.4.4, Hydrogen Purge Sys, TS 3/4.6.5.1, Shield Bldg Emergency Ventilation Sys & TS 3/4.6.5.1, Crevs ML20207E7941999-05-21021 May 1999 Proposed Tech Specs Allowing Use of Expanded Spent Fuel Storage Capability ML20205E5031999-03-19019 March 1999 Proposed Tech Specs Withdrawing Proposed New Action B, Previously Submitted in 981027 Application ML20204F1821999-03-0909 March 1999 Proposed Tech Specs,Adopting Changes in Frequency & Scope of Volumetric & Surface Exams Justified by W TR WCAP-14535A ML20155E3231998-10-28028 October 1998 Proposed Tech Specs Revising Various Sections of 6.0, Administrative Controls, Including Relocation of 6.11 Contents to Plant Ufsar,Per NUREG-1430,Rev 1 ML20155E4971998-10-28028 October 1998 Proposed Tech Specs 4.0.2 Re Applicability of 25% Surveillance Interval Extension Allowance ML20155D7791998-10-27027 October 1998 Proposed Tech Specs Relocating TS SR 4.6.5.1.d.4 Re Evs Negative Pressure Testing to TS 3/4.6.5.2,deleting TS Definition 1.24 & Making Related Changes Associated with Deletion of Subject Definition ML20155E0721998-10-27027 October 1998 Proposed Tech Specs Revising 3/4.3.1.1 Re RPS Instrumentation & 3/4.3.2.3 Re ARTS Instrumentation,To Provide Potential Reduction in Spurious Trip Rate for Potential Cost Savings in Excess of $50,000 ML20155D8521998-10-27027 October 1998 Proposed Tech Specs Revising SRs 4.8.2.3.2.d,4.8.2.3.2.e, 4.8.2.3.2.f & Table 4.8-1 Re Testing of 125 Volt DC Station Batteries & Applicable TS Bases ML20151W2991998-09-0808 September 1998 Proposed Tech Specs Revising Section 3/4.7.6, Plant Systems - CREVS & Associated Bases ML20151W3071998-09-0808 September 1998 Proposed Tech Specs Permitting Use of Framatome Cogema Fuels M5 Advanced Alloy for Fuel Rod Cladding & Fuel Assembly Spacer Grids ML20217P8351998-04-24024 April 1998 Proposed Tech Specs Clarifying Discussion of Margin Between RPS High Pressure Trip Setpoint & Lift Setting for Pressurizer Code Safety Valves ML20217P8811998-04-24024 April 1998 Proposed Tech Specs 3/4.3.1.1,3/4.3.2.1,3/4.3.2.2 & Associated Bases Relocating Tables of Response Time Limits to Plant USAR Technical Requirements Manual ML20217C4881998-03-20020 March 1998 Proposed Tech Specs SR 4.4.5.3.c.1,providing Greater Specificity as to Location of Addl Insps in Unaffected SG ML20217N4471998-02-27027 February 1998 Proposed Tech Specs Pages Provided to Modify Proposed New Action 3.7.6.1.b to Make More Consistent w/NUREG-1431 ML20203L1111998-02-26026 February 1998 Proposed Tech Specs Pages Re Amend to License NPF-3 Involving Incorporation of New Repair Roll Process for SG Tubes W/Defects in Upper Tube Sheet ML20197J2621997-12-23023 December 1997 Proposed Tech Specs Pages Re Changes to TS Definition 1.2, TS 3/4/9.5 & New TS 3.0.6 & Associated Bases.Ts Index Rev to Reflect Change to TS 3/4.9.5,included ML20197J5971997-12-23023 December 1997 Proposed Tech Specs Pages,Revising TS Surveillance Requirements for ISI Requirements of Internal Auxiliary Feedwater Header,Header to Shroud Attachment Welds & External Header Thermal Sleeves ML20217R2821997-08-26026 August 1997 Proposed Tech Specs,Clarifying LCO 3.6.1.3.a & Revising Surveillance Requirement 4.6.1.3.c ML20217R2871997-08-26026 August 1997 Proposed Tech Specs,Modifying TS 3.2.5 Action Statement to Require Power Reduction to Less than 5% of Rated Thermal Power within Four Hrs If RCS Flow Rate Is Less than Specified Limit for Greater than Two Hrs ML20217G5981997-07-29029 July 1997 Proposed Tech Specs 3/4.4.3 Re Safety Valves & Pilot Operated Relief valve-operating ML20141F1101997-06-24024 June 1997 Proposed Tech Specs,Deleting Requirements for Safety Features Actuation Sys Containment High Radiation Monitors ML20138C3261997-04-18018 April 1997 Proposed Tech Specs 3/4.7.6 Revising Limiting Condition for Operation to Include New Required Actions in Event That One or Both Channels of Radiation Monitoring Instrumentation Becomes Inoperable ML20138A6891997-04-18018 April 1997 Proposed Tech Specs 3/4.5.3.2.1 & 3/4.5.2 Modifying Presently Specified 18-month Surveillance Frequencies to New Specified Frequencies of Once Each 24-months ML20138M1281997-02-14014 February 1997 Proposed Tech Specs 3.5.2 Re Emergency Core Cooling Systems & 4.5.2.f Re Surveillance Requirements ML20134L0561997-02-13013 February 1997 Proposed Tech Specs Re Changes Made Concerning Decay Heat Removal Sys Valve ML20134D7621997-01-30030 January 1997 Proposed Tech Specs Revising SR Intervals from 18 to 24 Months Based on Results of DBNPS Instrument Drift Study & TS 2.2, Limiting Safety Sys Settings, Based on Results of Revised Framatome RPS Instrument String Error ML20134F1811997-01-30030 January 1997 Proposed Tech Specs Re Possession & Use of SNM as Reactor Fuel ML20134B0591997-01-20020 January 1997 Proposed Tech Specs 3/4.5.3 Re ECCS Subsystems ML20132B7031996-12-11011 December 1996 Proposed Tech Specs Revising TS Definitions,Instrumentation TS & ECCS TS for Conversion to 24 Month Fuel Cycle for License NPF-3 ML20134F1891996-10-28028 October 1996 Proposed Tech Specs 3/4.8 Re Electrical Power Systems ML20117P5311996-09-17017 September 1996 Proposed Tech Specs,Supporting Conversion of DBNPS from 18 Month to 24 Month Fuel Cycle ML20117N8531996-09-12012 September 1996 Proposed Tech Specs Re Reactivity Control Systems & Emergency Core Cooling Systems ML20117M2201996-09-0404 September 1996 Proposed Tech Specs 6.2.3,removing Specific Overtime Limits & Working Hours ML20116K2631996-08-0707 August 1996 Proposed Tech Specs Re Definitions,Applicability Bases, Containment Spray Sys & Containment Isolation Valve for Conversion to 24 Month Fuel Cycle ML20117K1911996-05-28028 May 1996 Proposed Tech Specs 3/4.3.1.1 - RPS Instrumentation & TS 3/4.3.2.3 - Anticipatory RTS Instrumentation Increasing Trip Device Test Interval ML20101M1921996-03-29029 March 1996 Proposed Tech Specs 3/4.6.4.4 - HPS,3/4.6.5.1 - Shield Building Evs & 3.4.7.6.1 - CREVS Re Changing Surveillance Requirements for Charcoal Filter Lab Testing to Revise Methodology Used to Determine Operability in ESF AHUs ML20101C6961996-03-0606 March 1996 Proposed Tech Specs,Allowing Deferment of SR 4.5.2.b for ECCS Flowpath Containing HPI Pump 1-2 Until 10th Refueling Outage,Scheduled to Begin 960408 ML20100E0101996-02-0505 February 1996 Proposed TS 3/4.3.2.1,Table 3.3-3,safety Features Actuation Sys Instrumentation,Reflecting Design & Actuation Logic of Plant Sequencers & Essential Bus Undervoltage Relays ML20095F5891995-12-12012 December 1995 Proposed Tech Specs Re Containment Sys ML20094D0611995-10-31031 October 1995 Proposed TS Page 6-18,deleting TS 6.9.2.d, Seismic Event Analysis ML20098C5181995-10-0202 October 1995 Proposed Tech Specs,Revising TS Section 5.0,design Features & Adopting Improved STS for B&W Plants Format & Content ML20098C4111995-09-29029 September 1995 Proposed TS 3/4.1.2.8 Re Reactivity Control Sys - Borated Water Sources - Shutdown TS 3/4.1.2.8 Re Reactivity Control Sys - Operating & TS 3/4.5.1 Re ECCS - Core Flooding Tanks ML20098C1121995-09-29029 September 1995 Proposed TS 3.4.3 & Associated Bases,Modifying Lift Setting of Pressurizer Code Safety Valves to Greater than or Equal to 2,575 Psig,Corresponding to Lift Setting Tolerance of +3% of Nominal Lift Pressure 1999-09-07
[Table view] Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML20216E6111999-09-0707 September 1999 Proposed Tech Specs 3/4.3.2.1 Re Safety Features Actuation Sys Instrumentation & Associated Bases ML20210H0731999-07-28028 July 1999 Proposed Tech Specs 3/4.7.5.1, Ultimate Heat Sink, Allowing Plant Operation in Modes 1-4 with Water Temp Less than or Equal to 90 F ML20210G4311999-07-27027 July 1999 Proposed Tech Specs,Changing TSs 6.4, Training, 6.5.2.8, Audits, 6.10, Record Retention, 6.14, Process Control Program & 6.15, Odcm ML20210G4801999-07-26026 July 1999 Proposed Tech Specs 3/4.3.2.1 Re Safety Features Actuation Sys Instrumentation & Associated Bases ML20210G9161999-07-26026 July 1999 Proposed Tech Specs 3/4.3.3.1, Radiation Monitoring Instrumentation, 3/4.3.3.2, Instrumentation - Incore Detectors & 3/4.3.3.9, Instrumentation - Waste Gas Sys Oxygen Monitor ML20210G5391999-07-26026 July 1999 Proposed Tech Specs Re Implementation of 10CFR50,App J, Option B for Type B & C Containment Leakage Rate Testing ML20195F9351999-06-10010 June 1999 Proposed Tech Specs,Revising TS 3/4.6.4.4, Hydrogen Purge Sys, TS 3/4.6.5.1, Shield Bldg Emergency Ventilation Sys & TS 3/4.6.5.1, Crevs ML20207E7941999-05-21021 May 1999 Proposed Tech Specs Allowing Use of Expanded Spent Fuel Storage Capability ML20205E5031999-03-19019 March 1999 Proposed Tech Specs Withdrawing Proposed New Action B, Previously Submitted in 981027 Application ML20204F1821999-03-0909 March 1999 Proposed Tech Specs,Adopting Changes in Frequency & Scope of Volumetric & Surface Exams Justified by W TR WCAP-14535A ML20155E4971998-10-28028 October 1998 Proposed Tech Specs 4.0.2 Re Applicability of 25% Surveillance Interval Extension Allowance ML20197G5521998-10-28028 October 1998 Rev 8 to Dbnps,Unit 1 Technical Requirements Manual ML20155E3231998-10-28028 October 1998 Proposed Tech Specs Revising Various Sections of 6.0, Administrative Controls, Including Relocation of 6.11 Contents to Plant Ufsar,Per NUREG-1430,Rev 1 ML20155D7791998-10-27027 October 1998 Proposed Tech Specs Relocating TS SR 4.6.5.1.d.4 Re Evs Negative Pressure Testing to TS 3/4.6.5.2,deleting TS Definition 1.24 & Making Related Changes Associated with Deletion of Subject Definition ML20155D8521998-10-27027 October 1998 Proposed Tech Specs Revising SRs 4.8.2.3.2.d,4.8.2.3.2.e, 4.8.2.3.2.f & Table 4.8-1 Re Testing of 125 Volt DC Station Batteries & Applicable TS Bases ML20155E0721998-10-27027 October 1998 Proposed Tech Specs Revising 3/4.3.1.1 Re RPS Instrumentation & 3/4.3.2.3 Re ARTS Instrumentation,To Provide Potential Reduction in Spurious Trip Rate for Potential Cost Savings in Excess of $50,000 ML20151W3071998-09-0808 September 1998 Proposed Tech Specs Permitting Use of Framatome Cogema Fuels M5 Advanced Alloy for Fuel Rod Cladding & Fuel Assembly Spacer Grids ML20151W2991998-09-0808 September 1998 Proposed Tech Specs Revising Section 3/4.7.6, Plant Systems - CREVS & Associated Bases ML20206D2721998-08-28028 August 1998 Rev 11,change 1 to Odcm ML20217P8351998-04-24024 April 1998 Proposed Tech Specs Clarifying Discussion of Margin Between RPS High Pressure Trip Setpoint & Lift Setting for Pressurizer Code Safety Valves ML20217P8811998-04-24024 April 1998 Proposed Tech Specs 3/4.3.1.1,3/4.3.2.1,3/4.3.2.2 & Associated Bases Relocating Tables of Response Time Limits to Plant USAR Technical Requirements Manual ML20217C4881998-03-20020 March 1998 Proposed Tech Specs SR 4.4.5.3.c.1,providing Greater Specificity as to Location of Addl Insps in Unaffected SG ML20217N4471998-02-27027 February 1998 Proposed Tech Specs Pages Provided to Modify Proposed New Action 3.7.6.1.b to Make More Consistent w/NUREG-1431 ML20203L1111998-02-26026 February 1998 Proposed Tech Specs Pages Re Amend to License NPF-3 Involving Incorporation of New Repair Roll Process for SG Tubes W/Defects in Upper Tube Sheet ML20197J2621997-12-23023 December 1997 Proposed Tech Specs Pages Re Changes to TS Definition 1.2, TS 3/4/9.5 & New TS 3.0.6 & Associated Bases.Ts Index Rev to Reflect Change to TS 3/4.9.5,included ML20197J5971997-12-23023 December 1997 Proposed Tech Specs Pages,Revising TS Surveillance Requirements for ISI Requirements of Internal Auxiliary Feedwater Header,Header to Shroud Attachment Welds & External Header Thermal Sleeves ML20217M5601997-09-0505 September 1997 Rev 11.0 to Davis-Besse Odcm ML20217R2821997-08-26026 August 1997 Proposed Tech Specs,Clarifying LCO 3.6.1.3.a & Revising Surveillance Requirement 4.6.1.3.c ML20217R2871997-08-26026 August 1997 Proposed Tech Specs,Modifying TS 3.2.5 Action Statement to Require Power Reduction to Less than 5% of Rated Thermal Power within Four Hrs If RCS Flow Rate Is Less than Specified Limit for Greater than Two Hrs ML20217G5981997-07-29029 July 1997 Proposed Tech Specs 3/4.4.3 Re Safety Valves & Pilot Operated Relief valve-operating ML20141F1101997-06-24024 June 1997 Proposed Tech Specs,Deleting Requirements for Safety Features Actuation Sys Containment High Radiation Monitors ML20138C3261997-04-18018 April 1997 Proposed Tech Specs 3/4.7.6 Revising Limiting Condition for Operation to Include New Required Actions in Event That One or Both Channels of Radiation Monitoring Instrumentation Becomes Inoperable ML20138A6891997-04-18018 April 1997 Proposed Tech Specs 3/4.5.3.2.1 & 3/4.5.2 Modifying Presently Specified 18-month Surveillance Frequencies to New Specified Frequencies of Once Each 24-months ML20140D9481997-04-0909 April 1997 ODCM, Rev 10 ML20138M1281997-02-14014 February 1997 Proposed Tech Specs 3.5.2 Re Emergency Core Cooling Systems & 4.5.2.f Re Surveillance Requirements ML20134L0561997-02-13013 February 1997 Proposed Tech Specs Re Changes Made Concerning Decay Heat Removal Sys Valve ML20134F1811997-01-30030 January 1997 Proposed Tech Specs Re Possession & Use of SNM as Reactor Fuel ML20134D7621997-01-30030 January 1997 Proposed Tech Specs Revising SR Intervals from 18 to 24 Months Based on Results of DBNPS Instrument Drift Study & TS 2.2, Limiting Safety Sys Settings, Based on Results of Revised Framatome RPS Instrument String Error ML20134B0591997-01-20020 January 1997 Proposed Tech Specs 3/4.5.3 Re ECCS Subsystems ML20132B7031996-12-11011 December 1996 Proposed Tech Specs Revising TS Definitions,Instrumentation TS & ECCS TS for Conversion to 24 Month Fuel Cycle for License NPF-3 ML20134F1891996-10-28028 October 1996 Proposed Tech Specs 3/4.8 Re Electrical Power Systems ML20117P5311996-09-17017 September 1996 Proposed Tech Specs,Supporting Conversion of DBNPS from 18 Month to 24 Month Fuel Cycle ML20117N8531996-09-12012 September 1996 Proposed Tech Specs Re Reactivity Control Systems & Emergency Core Cooling Systems ML20117M2201996-09-0404 September 1996 Proposed Tech Specs 6.2.3,removing Specific Overtime Limits & Working Hours ML20116K2631996-08-0707 August 1996 Proposed Tech Specs Re Definitions,Applicability Bases, Containment Spray Sys & Containment Isolation Valve for Conversion to 24 Month Fuel Cycle ML20117K1911996-05-28028 May 1996 Proposed Tech Specs 3/4.3.1.1 - RPS Instrumentation & TS 3/4.3.2.3 - Anticipatory RTS Instrumentation Increasing Trip Device Test Interval ML20101M1921996-03-29029 March 1996 Proposed Tech Specs 3/4.6.4.4 - HPS,3/4.6.5.1 - Shield Building Evs & 3.4.7.6.1 - CREVS Re Changing Surveillance Requirements for Charcoal Filter Lab Testing to Revise Methodology Used to Determine Operability in ESF AHUs ML20101C6961996-03-0606 March 1996 Proposed Tech Specs,Allowing Deferment of SR 4.5.2.b for ECCS Flowpath Containing HPI Pump 1-2 Until 10th Refueling Outage,Scheduled to Begin 960408 ML20100E0101996-02-0505 February 1996 Proposed TS 3/4.3.2.1,Table 3.3-3,safety Features Actuation Sys Instrumentation,Reflecting Design & Actuation Logic of Plant Sequencers & Essential Bus Undervoltage Relays ML20107C3101995-12-21021 December 1995 Rev 9 to Odcm 1999-09-07
[Table view] |
Text
- .. -
-- - _ M L :- L _ _M;;. . py .M, ..
_ mm, 3/4 LIMITING CONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS 3/4.0 APPLICABILITY LIMITING CONDITION FOR OPERATION 3.0.1 Limiting Conditions for Operation and ACTION requirements shall be applicable during the OPERATIONAL MODES or other conditions specified for each specification.
3.0.2 Adherense to the requirements of the Limiting Condition for Opera-.
tion and/or associated ACTION within the specified time interval shall constitute compliance with the specification. In the event the Limiting Condition for Operation is restored prior to expiration of the specified tim.e interval, completion of the ACTION statement is not required.
,. 3.0.3 In the event a Limiting Condition for Operation and/or associated
( '
ACTION requirements cannot be satisfied because of circumstances in excess of those addressed in the specification, the facility shall be placed in at least HOT STANDBY within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br /> unless corrective measures are completed that permit operation under the permissible ACTION statements for the speci-4 fied time interval as measured from initial discovery. Exceptions to y these requirements shall be stated in the individual specifications.
L 3.0.4 REPLACE Entry into an OPERATIONAL MODE or other specified applicability U condition shall not be made unless the conditions of the Limiting Con ATT4cNED dition for Operation are met without reliance on provisions contained in3 o 3 '
the ACTION statements unless otherwise excepted. This provision shall not prevent passage through OPERATIONAL MODES as required to comply with ACTION statements.
SURVEILLANCE REQUIREMENTS 4.0.1 Surveillance Requirements shall be applicable during the OPERA-TIONAL MODES or other conditions specified for individual Limiting Conditions for Operation unless otherwise stated in an individual Sur-veillance Requirement.
4.0.2 Each Surveillance Requirement shall be performed within the specified time interval with:
a.
A maximum lance allowable interval, and extension not to exceed 25% of the survell-b.
A total maximum combined interval time for any 3 consecutive tests not to exceed 3.25 times the specified surveillance interval. '
DAVIS-GESSE, UNIT 1 3/4 0-1 i
~
f V211090125 821105 .
} PDR ADOCK 05000346 '
.P_ PDR
O 3.0.3 When a Limiting Condition for Operation is not met, except as provided in the associated ACTION requirements, within I hour action shall be initiated to placeit, placing theasunit in a H00Ein:in which the Specification does not' apply, applicable, i 1. At least HOT STAN08Y within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />,
' 2. At least HOT SHUTDOWN within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />, and
- 3. At least C0l0 SHUTDOWN within the subsequent 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
Where corrective measures are completed that permit operation under the ACTION l
requirements, t!e ACTION may be taken in accordance with the specified time limits as measu ed from the time of failure to meet the Limiting Condition for Operation. Exceptions to these requirements are stated in the individual
, Specifications.
G 7
l l
\
e l - .
_. - - - - . - , , - ~ - - - - -
i' ,_ _;,;._ a 1
- . - . 3 , M . - .*.: : L - . : ' M Q Q ~ ~
Y APPLICABILITY..
SURVEILLANCE REQUIREMENTS (Continued) ._
y > -> >
r
'4.0.3 Performance of a Surveillance Requirement within the specified time interval shall constitute compliance with OPERABILITY requirements ggq for a Limiting Condition for Operation and associated ACTION statements gy unless otherwise required by the specification. A UNO 4
i ONAL MODE or other specified applicability ' A M3 condition shall not be made unless the Surveillance Requirement (s) Q.o 3 /
associated with the Limiting Condition for Operation have becn performed within the stated surveillance interval or as otherwise specified.
4.0.5 Surveillance Requirements for inservice inspection and testing of ASME Code Class 1, 2 and 3 components shall be applicable as follows:
- a. During the time period:
- 1. From issuance of the Facility Operating License to the start of facility commercial operation, inservice testing ..
of ASME Code Class 1, 2 and 3 pumps and valves shall be PC performed in accordance with Section XI of the ASME Boiler and Pressure Vesel Code 1974 Edition, and Addenda through Summer 1975, except where specific written relief has been granted by the Commission.
- 2. Following start of facility commercial operation, inservice inspection of ASME Code Class 1, 2 and 3 components and
inservice testing of ASME Code Class 1, 2 and 3 pumps and valves shall be performed in accordance with Section XI of the ASME Boiler and Pressure Vessel Code and applicable Addenda as required by 10 CFR 50, Section 50.55a(g),
except where specific written relief has been granted by the Ccrmission pursuant to 10 CFR 50, Section 50.55a(g)(6)(i).
- b. Surveillance intervals specified in Section XI of the ASME Boiler and Pressure Vessel Code and applicable Addenda for the inservice inspection and testing activities required by the ASME Boiler and Pressure Vessel Code and applicable Addenda shall be applicable as follows in these Technical Specifications:
SY!S-9r w . "l[T 1 1/4 0-2
4.0.3 Failure to perform a Surveillance Requirement within the speci-fied time interval shall constitute a failure to meet the OPERABILITY requirements for a Limiting Condition for Operation.
Exceptions to these requirements are stated in the individual Specifications. Surveillance Requirements do not have to be performed on inoperable equipment.
4.0.3.1 If the failure to perform the Surveillance Requirement within the specified time limit is due to an administrative error, the applicable action shall be as follows:
With a piece of equipment'or a system inoperable due to a missed Surveillance Requirement, perform the re-quired surveillance within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> f rom the time of discovery, or no longer than the surveillance interval, whichever is less, or enter the applicable action state-ment for the piece of equipment or system which is inoperable.
. u --
.,. 7 1
! 3/4.0 APPLICABILITY BASES The specifications of this section provide the general requirements i applicable to each of the Limiting Conditions for Operation and Survell-i lance Requirements within Section 3/4.
1 3.0.1 This specification defines the applicability of each specifica- '
tion in terms of defined OPERATIONAL MODES or other specified conditions' and is provided to delineate specifically when each specification is applicable.
3.0.2 This specification defines those conditions n'ecessary to constitute compliance with the terms of an individual Limiting Condition
/aforc.Operation g a and associated cA ACTION) requirement.
J 0.3 (MSES y - ,
~
3.0.3 This specification delineates the ACTION to be taken for
,/
} circumstances not directly provided for in the ACTION statements and whose occurrence would violate the intent of the specification. For example, Specification 3.5.1 calls for each Reactor Coolant System core flooding tank to be OPERABLE and provides explicit ACTION require-ments when one tank is inoperable. Under the terms of Specification
(- 3.0.3, if more than one tank is inoperable, the facility is required to befollowing the in at least30 HOT STANDBY within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and in COLD SHUT 00WN within hours.
m
% 3.0.4 This specification provides that entry into an OPERATIONAL MODE or other specified applicability condition must be made with (a) the full complement of required systems, equipment or components OPERABLE and (b) all other parameters as specified in the Limiting Conditions for Operation being met without regard for allowable deviations and out of service provisions contained in the ACTION statements.
The intent of this provision is to insure that facility operation is not initiated with either required equipment or systems inoperable or other specified limits being exceeded.
Exceptions to this provision have been provided for a limited number of specifications when startup with inoperable equipment would not affect Plant safety. These exceptions are stated in the ACTION statements of the appropriate specifications.
/ .'
. ~.
DAVIS-8 ESSE. UNIT 1 83/40-1
BASES 3.0.3 This specification delineates the ACTION to be taken for cirne: stances not directly provided for in the ACTION statements and whose occurrence would violate the intent of the spectfication. . For example, Specification 3.5.1 requires each Recctor Coolant Systems.r.Mns kk'to be OPERABLE and provides explicit ACTION requirecents if one 4dnK is inoperable. Under the terms of Specification 3.0.3, if more than one brk is inoperable, the unit is required to be in at least HOT STANDBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in at least HOT SHUlDOWN within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />. As a further example, Specification 3.6.2.1 requires two contaircent Spray Systems to be OPERABLE and pmvides explicit ACTION requirements if one spray system is inoperable: Under the terms of Specif,ication 3.0.3, if both of the required Contaircent Spray Systems are inoperable,' the unit is required to be in at least HOT STANDBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />, in at least HOT SHUTDOWN within the -
following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in at least COLD SHUTDOWN in thef. ben 3 3fnours. It 1's '
assumed that the unit is brought to the required K)DE within the required times by promptly initiating and carrying out the appropriate ACTION statement, D
e e