ML20066B644

From kanterella
Jump to navigation Jump to search

Forwards Application to Amend License NPF-3,changing Time within Which Unit Must Be Placed in Hot Standby After Plant Goes Outside Bounds of Action Statement
ML20066B644
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 11/05/1982
From: Crouse R
TOLEDO EDISON CO.
To: Stolz J
Office of Nuclear Reactor Regulation
Shared Package
ML20066B646 List:
References
872, TAC-43038, NUDOCS 8211090113
Download: ML20066B644 (1)


Text

f l

TOLEDO Docket No. 50-346 License No. NPF-3

  • * "S" Serial No. 872 November 5, 1982 Director of Nuclear Reactor Regulation Attention:

Mr. John F. Stolz Operating Reactor Branch No. 4 Division of Operating Reactors United States Nuclear Regulatory Commission Washington, DC 20555

Dear Mr. Stolz:

Under separate cover, we are transmitting three (3) original and forty (40) conformed copies of an application for Amendment to Facility Operating License No. NPF-3 for the Davis-Besse Nuclear Power Station Unit No. 1.

This application requests that the Davis-Besse Nuclear Power Station Unit 1 Technical Specifications, Appendix A, be revised to reflect the changes attached. The proposed changes involve Section 3.0.3, 4.0.4 and Bases.

The attached identify the proposed change ar.d its safety evaluation concerning safety systems operability.

This amendment request involves a change of Class II type. Enclosed is a check for $1,200 as requested by 10CFR170.22.

Very truly yours, RPC: CAB:lah Attachment 1/6a g,,

cc.

..., _.. 1d_ z n sp._

THE TOLEDO EDISON COMPANY EDISON PLAZA 300 MADISCN AVENUE TOLEDO OHIO 43652 C8211090U13 821105 l PDR ADOCK 05000346 P

PDR

-.. -.