r New Ham hire
.Y,hhk(ps Ted C. Feigenbovm h
Preudent ond Chief E mutive Of fger NYN-90212 December 14, 1990 United States Nuclear Regulatory Commission Washington, DC 20555 Attention:
Document Control Desk
References:
facility Operating License NPF-86, Docktt No. 50-443
Subject:
Monthly Operating Report Gentlemen:
Enclosed please find Monthly Operating Report 90-11.
This report addresses the operating and shutdown experience relating to Seabrook Station Unit I for the month of November, 1990 and is submitted in accordance with the requirements of Seabrook Station Technical Specification 6.8.1.5.
Very truly yours, QQbl.2ebe Ted C. Feigertbaum Enclosure cc: Mr. Thomas T. Martin Regional Administrator United States Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406 Mr. Noel Dudley NRC Senior Resident inspector P.O. Box 1149 Seabrook, NH 03874 l
l 9012190059 901130 1
PIiR ADOCK 05000443 R
PDR New Hampshire Yankee Division of Public Service Company of New Hampshire P O. Box 300
- Seabrook, NH 03874 + Telephone (603) 474 9521
,)o f' >, :
,,/ V'u Vi
OPERATING DATA REPORT DOCKET NO.
50-443 UNIT Seabrook 1 DATE 12/14/90 COMPLETED BY P. Nardone TELEPHONE (603) 474-9521 i
(Ext. 4074)
OPERATING STATUS 1.
Unit Name:
Seabrook Station Unit 1 2.
Reporting Period NOVEMBER 1990 3.
LicensedThermalPower(MWt):
3411 4.
Nameplate Rating (Gross MWe):
1197 5.
Design Electrical Rating (Net MWe):
1148 6.
MaximumDependableCapacity(GrossMWe):
1200 MaximumDependableCapacity(NetMWe)(: ItemsNumber3Through7) 7.
1150 8.
If Changes Occur in Capacity Ratings Since Last Report, Give Reasons:
Not Applicable 9.
Power Level To Which Restricted, if Any:
None
- 10. Reasons for Restrictions, If Any:
Not Applicable This Month Yr.-to-Date Cumulative
- 11. Hours In Reporting Period 720.0 8016.0 36145.0
- 12. Number Of Hours Reactor Was Critical 406.4 4780.9 4975.3
- 13. Reactor Reserve Shutdown Hours 0.0 953.3 953.3
- 14. Hours Generator On-Line 362.2 3383.4 3383.4
- 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0 16.GrossThermalEnergyGenerated(MWH) 1150226 10064596 10065686
- 17. Gross Elec. Energy Generated (MWH) 396964 3382589 3382589 18.NetElectricalEnergyGenerated(MWH)-
381132 3238333 3238333
- 19. Unit Service Factor 50.3 81.2 81.2
- 20. Unit Availability Factor 50.3 81.2 81.2
- 21.UnitCapacityFactor(UsingMDCNet) 46.0 77.2 77.2
- 22. Unit Capacity factor (Using DER Net) 46.1 77.3 77.3
- 23. Unit Forced Outage Rate 49.7 18.8 18.8
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
None Scheduled
- 25. If Shut Down At End Of Report Period, Estimated Date Of Startup:
Not Applicable
- NOTE:
Values based on accumulated hours starting 08/19/90, date Regular Full Power Operation began.
1 of 6
AVERAGE DAILY UNIT POWER LEVEL DOCKET N0.
50-443 UNIT Seabrook 1 DATE 12/11/90 COMPLETED BY P. Hardone TELEPHONE (603) 474-9521 (Ext. 4074)
MONTil NOVEMBER, 1990 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1 0
16 0
2 310 17 0
3 1069 18 0
4 1152 19 0
5 1152 20 0
6 1152 21 0
7 1152 22 0
8 1152 23 194 9
697 24 935 10 0
25 1151 11 0
26 1152 12 0
27 1153 13 0
28 1155 14 0
29 1153 15 0
30 1152 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.
Compute to the nearest whole megawatt.
2 of 6 l-
IEIT SHUIDOHtG AND PCEHI few.: nag D ut.T 10.
50-443' INIT Seabrook 1 DATE 12/14/90 i<t.iucr M2fIH NO'MER, 1990 COTLETED BY P. Nardcne ~
TEMPIDiE f6031 474-9521 (Ext. 4074) l No.
Date Type Duration Reason 2 Method of Licasee Cause & Corrective (Hours)
Shutting Event Action to Down Reactor 3 Report #
Prevent Recurren Page 1 of 2 90-28 11/01/90 F
29.5 A
4 N/A Ground detected cn exciter field.
Generator breaker opened while reactor power maintained at 10% RTP.
C w.sa ul turbine loading following repair of cable frun exciter collector ring to exciter field.
1 2
3 F: Forced Reason:
Method:
S: Scheduled A-Equipnent Failure (Explain) 1-Fanual B-Maintenan or Test 2-Fanual Scram C-Refueling 3-Automatic Scram IMlegulatory Restriction 4-Continued frun E-Operator Training & License Examinaticn previous nmth F-Administrative 5-Ibwer Reduction G-Operaticnal Error (Explain)
(Duration = 0)
H h (Explain) 9-Other (Explain) 3 of 6 d
k J
IMIT SUIDOWS NO POWER REDUCTIGIS DOOGT NO.
50-443_
i.
INIT Sentrocdc 1 DPEE 12/14/90 l
REPCRT MRIH NOVDEER, 1990 (IMPIRIED BY P. Nerdone '
TE2HDIE f 603) 474-9521
]
(Ext. 4074)
No.
Date Type Duraticn Reason 2 Method of
- Licensee Cause & Corrective l
Il (Hours)
Shutting Event Action to
}
Down Reactor 3 Report #
Prevent Recurrence i
Page 2 of 2 4
1 90-29 11/09/90 F
328.3 A
3 90-25 Autanatic reactor trip m 10-10 steenn Wohn.- level caused by an air stgply failure to feedeter regulating valve l
' VS20 (Si B). 'Ihe air booster relays
{
for all fcur feedwater regulating valves j
were relocated to an area with less j'
vibraticn.
2 i
'Ihe shutdown was prolonged by additional
?-
repairs required m both pressurizer 10RV's, reactor coolant pump C seal pedage and Train A steem supply valve to EEW ptmp ;, whine.
l t
4 l
i 4
4 of 6 j
1
)
i I
f c m.s.
e.-r.
m a c..
DOOTf 10.
50-443 INIT Seabrook'l-IRTE 12/14/90 uAt< Lnyt; MINIDWCB SEP998Y ITR SAFE 1T REIATED EQUI 1FDrr O NPLEIED BY P. Nardone
'RElun KNIH NOVDBER, ' 1990' TETEPfDE -(603) 474-9521 (Ext. 4074)
Page 1 of 1 IRTE SYSrfM ONPONENT MINTDEANCE ACEIGN 11/13/90-Excore 1-NI-NM-6690 Indimtion failed low during power coeration.
Nuclear Train A
'Repla 3 defective lEVDC power supply.
Instrumentation PAM Nuclear
~
Instrumentation i
Channel j
11/29/90 Rme+rr 1-RC-TP-421B Hi lead imhalmice on TE-421B caused signal l
4 Coolant Prote.-tion Set 2 to fluctuate. Renoved RID frte service and I
Narrow Range tapum ily placed spare RID TE-420B in Cold Leg RID service. Reworked splice at TE-421B and j
rei.uusi it to servi
+
1 r
l F
5 of 6 i
l
[
t F
{
i DOCKET NO.
50-443 UNIT Seabrook 1 IATE 12/14/90 CCMPIETED BY P. Nardone
,-0 TELEPHCNE I603) 474-9521 f,
'(Ext. 4074) i REFUELIlG INKEMATION REQUEST I
- 1. Ihne of facility: Seabrook Unit 1 l
- 2. Scheduled date for next refueling shutdown:
07/27/91
- 3. Scheduled date for restart following refueling: 10/02/91
- 4. Will refueling or resunption of operation thereafter ruguire a technical specification change or other license amendnent?
Unknown at this tine.
- 5. Scheduled date(s) for subnitting licensing action and supporting
-information:
Not Applicable
- 6. Inportant licensing considerations associated with refueling, e.g.,
new or different fuel design or supplier, unreviewed design or
.perfoamnce analysis nothods, significant changes in fuel design, new operating procedures:
None 4
- 7. The number of fuel assablies (a) in the core and (b) in the spent fuel storage pool:
.(a) In Core:
193 (b) 0
-9. The present licensed spent fuel pool storage capacity and the size of any increase in-licensect storage capecity that has been requested or is planned, in number of fuel ass a blies:
Present licensed capacity: 1236 No increase in storage capacity requested or planned.
- 9. The projected date of the last refueling that can be discharged to the spent fuel pool assunting the present licensed capacity:
i Licensed. capacity of 1236 fuel assm blies based on sixteen refuelings and full core offload capability.
The current licensed capacity is adequate until at least the year 2010.
6 of 6