Category:LICENSEE EVENT REPORT (SEE ALSO AO RO)
MONTHYEAR05000219/LER-1990-0081990-07-23023 July 1990 LER 90-008-00:on 900625,reactor Scram Occurred on Low Condenser Vacuum.Caused by Failure of Backwash Outlet Valve to Open,Causing Loss of Circulating Water to Condenser A. Plant Stabilized & Taken to Cold shutdown.W/900723 Ltr 05000219/LER-1984-020, Errata to LER 84-020-01,consisting of Page 4 Re Corrective Actions.Preventive Maint Request Initiated to Store Overload Devices in Vertical Position1985-09-23023 September 1985 Errata to LER 84-020-01,consisting of Page 4 Re Corrective Actions.Preventive Maint Request Initiated to Store Overload Devices in Vertical Position 05000219/LER-1982-0261982-06-0707 June 1982 LER 82-026/03L-0:on 820507,thermocouple for Safety Valve NR28J Found Open During Surveillance Testing.Caused by Broken Lead Wire at Thermocouple.One of Adjacent Valve Acoustic Monitor Setpoints Reduced.Thermocouple Replaced 05000219/LER-1981-061, Updated LER 81-061/03X-1:on 811223,of 11 Deficient Hydraulic Snubbers,Nine Found to Be Inoperable During Functional Testing.Caused by Seal Degradation &/Or Worn Poppet Valves. Snubbers Replaced W/Operable Spares1982-05-25025 May 1982 Updated LER 81-061/03X-1:on 811223,of 11 Deficient Hydraulic Snubbers,Nine Found to Be Inoperable During Functional Testing.Caused by Seal Degradation &/Or Worn Poppet Valves. Snubbers Replaced W/Operable Spares ML20064J2011978-12-22022 December 1978 /03L-0 on 781126:during Testing Containment Spray Pumps 51C & 51A Failed to Start on Signal Due to Excess Friction in Circuit Breaker Trip Bar Bearings.Bearings Were Cleaned & Lubricated ML20147H5331978-12-21021 December 1978 /03L-0 on 781125:switch RE03C Was Found to Trip at Pressure Less conservative(1075 Psig)Than Specified in Tech Specs 2.3.3.Cause of Pressure Switch Tripping Is Attributed to Sensor Repeatability ML20064H3441978-12-14014 December 1978 /01T-0 on 781129:during Test,Noted That Containment Leakage Rate Greater than Allowable.Discovered That Vent Valves Were Leaking.Caused by Leakage Past the Seating Surfaces ML20064H1871978-12-13013 December 1978 /01T-0 on 781129:during Test,Main Steam Line Drain Valve V-1-106 Did Not Close 2 Incore Probes,Did Not Fully W/Draw & Reactor Coolant Valve Did Not Indicate Closed.Due to Jammed Armature,Faulty Fuse Holder & Incorrect Settings ML20064F0691978-11-16016 November 1978 /03L-0 on 781018:isolation Valve V-7-31 Had Damaged Rubber Seat & Drain Valve V-7-29 Obstructed by Piece of Cork & Filter F-1-58 Medium Disintegrated.Cause of V-7-31 & F-7-58 Degradations Due to Detonations in Sys ML20064E7071978-11-15015 November 1978 /03L-0 on 781019:IRM 12 Became Inoperative While Cable to IRM 14 Was Disconnected.Irm 12 Failure Attributed to Maint Activities Under Vessel.Subesquent Inspec Showed IRM 12 Cable Damaged ML20064E5561978-11-15015 November 1978 /03L-0 on 781017:during Routine Surveillance Test of Standby Gas Treatment Sys,The Sys II Discharge Valve Failed to Open,Due to Stuck Solenoid in Control Air Supply to Operator for V-28-30 ML20064C2501978-10-12012 October 1978 /03L-0:on 780914,circuit Breaker for motor- Operated Valve Tripped When Valve Closed by Isolation Signal.Caused by Component Failure Allowing Switch Setting to Shift.Setting Corrected & Set Screw Tightened ML20064B7391978-09-29029 September 1978 /01T-0 on 780916:3 MSIVs(NS03A,NS04A,NS04B) Had Leakage Rates in Excess of Maximum Allowable Due to Stem Packing,Cracked Stellite Weld & Failure of Main Poppet to Seat Properly.Msiv Failures Being Investigated 1990-07-23
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217K4451999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Oyster Creek Nuclear Generating Station.With ML20211P6731999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Oyster Creek Nuclear Generating Station.With ML20211A7051999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Oyster Creek Nuclear Station.With ML20209G0631999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Oyster Creek Nuclear Generating Station.With ML20212H5491999-06-18018 June 1999 Non-proprietary Rev 4 to HI-981983, Licensing Rept for Storage Capacity Expansion of Oyster Creek Spent Fuel Pool ML20195E7961999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Oyster Creek Nuclear Generating Station.With ML20206N7431999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Oyster Creek Nuclear Generating Station.With ML20205P5401999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Oyster Creek Nuclear Generating Station.With ML20204C8201999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Oyster Creek Nuclear Generating Station.With ML20199E4671998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Oyster Creek Nuclear Generating Station.With ML20195E8321998-12-31031 December 1998 10CFR50.59(b) Rept of Changes to Oyster Creek Sys & Procedures, for Period of June 1997 to Dec 1998.With ML20198D2091998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Oyster Creek Nuclear Generating Station.With ML20195J8591998-11-12012 November 1998 Rev 11 to 1000-PLN-7200.01, Gpu Nuclear Operational QA Plan ML20195C4271998-11-0606 November 1998 Safety Evaluation Supporting Proposed Ocnpp Mod to Install Core Support Plate Wedges to Structurally Replace Lateral Resistance Provided by Rim Hold Down Bolts for One Operating Cycle ML20155J3021998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Oyster Creek Nuclear Generating Station.With ML20154R4981998-10-20020 October 1998 Core Spray Sys Insp Program - 17R ML20154L3051998-10-14014 October 1998 Safety Evaluation Accepting Licensee Request to Defer Insp of 79 Welds from One Fuel Cycle at 17R Outage ML20154Q3371998-09-30030 September 1998 Rev 8 to Oyster Creek Cycle 17,COLR ML20154L5571998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Oyster Creek Nuclear Generating Station.With ML20151V6311998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Oyster Creek Nuclear Generating Station.With ML20237D5691998-08-31031 August 1998 Rev 0 to MPR-1957, Design Submittal for Oyster Creek Core Plate Wedge Modification ML20237D5711998-08-18018 August 1998 Rev 0 to SE-000222-002, Core Plate Wedge Installation ML20237B0131998-07-31031 July 1998 Monthly Operating Rept for July 1998 for Oyster Creek Nuclear Generating Station ML20236R0511998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Oyster Creek Nuclear Generating Station ML20249B2981998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Oyster Creek Nuclear Station ML20248F3531998-05-21021 May 1998 Part 21 Rept Re Electronic Equipment Repaired or Reworked by Integrated Resources,Inc from Approx 930101-980501.Caused by 1 Capacitor in Each Unit Being Installed W/Reverse Polarity. Policy of Second Checking All Capacitors Is Being Adopted ML20247F1891998-05-0505 May 1998 Risk Evaluation of Post-LOCA Containment Overpressure Request ML20247G0581998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for Oyster Creek Nuclear Generating Station ML20216K0341998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Oyster Creek Nuclear Generating Station ML20151Y4651998-03-31031 March 1998 Non-proprietary Version of Rev 1 to GENE-E21-00143, ECCS Suction Strainer Hydraulic Sizing Rept ML20217A4631998-03-23023 March 1998 Safety Evaluation Accepting Use of Three Heats/Lots of Hot Rolled XM-19 Matl in Core Shroud Repair Assemblies Re Licenses DPR-16 & DPR-59,respectively ML20212E2291998-03-0404 March 1998 Rev 11 to 1000-PLN-7200,01, Gpu Nuclear Operational QAP, Consisting of Revised Pages & Pages for Which Pagination Affected ML20216J0841998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for Oyster Creek Nuclear Generating Station ML20203B2781998-02-16016 February 1998 10CFR50.59(b) Rept of Changes to Oyster Creek Systems & Procedures ML20203A3801998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for Oyster Creek Nuclear Generation Station ML20198P1791997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for Oyster Creek Nuclear Station ML20217C7591997-12-31031 December 1997 1997 Annual Environmental Operating Rept for Oyster Creek Nuclear Generating Station ML20197E9131997-11-30030 November 1997 Monthly Operating Rept for Nov 1997 for Oyster Creek Nuclear Station ML20199E4561997-11-13013 November 1997 Safety Evaluation Accepting Ampacity Derating Analysis in Response to NRC RAI Re GL-92-08, Thermo-Lag 330-1 Fire Barriers, for Plant ML20199D4381997-10-31031 October 1997 Monthly Operating Rept for Oct 1997 for Oyster Creek Nuclear Station ML20202E8511997-10-21021 October 1997 Rev 0 to Scenario 47, Gpu Nuclear Oyster Creek Nuclear Generating Station Emergency Preparedness (Nrc/Fema Evaluated) 1997 Biennial Exercise. Pages 49 & 59 of Incoming Submittal Were Not Included ML20211M9481997-10-0303 October 1997 Supplemental Part 21 Rept Re Condition Effected Emergency Svc Water Pumps Supplied by Bw/Ip Intl Inc to Gpu Nuclear, Oyster Creek Nuclear Generation Station.No Other Nuclear Generating Stations Effected by Notification ML20198J7361997-09-30030 September 1997 Monthly Operating Rept for Sept 1997 for Oyster Creek Nuclear Generating Station ML20211B7461997-09-24024 September 1997 Part 21 Rept Re Failure of Emergency Service Water Pump Due to Threaded Flange Attaching Column to Top Series Case Failure.Caused by Dissimilar Metals.Pumps in High Ion Svc Will Be Upgraded to 316 Stainless Steel Matl ML20210V0181997-08-31031 August 1997 Monthly Operating Rept for Aug 1997 for Oyster Creek Nuclear Generating Station ML20210L2961997-07-31031 July 1997 Monthly Operating Rept for Jul 1997 for Oyster Creek Nuclear Station ML20149F9961997-07-18018 July 1997 Safety Evaluation Re Gpu Nuclear Operational Quality Assurance Plan,Rev 10 for Three Mile Island Nuclear Generating Station,Unit 1 & Oyster Creek Nuclear Generating Station ML20196H0111997-07-11011 July 1997 Special Rept 97-001:on 970620,removed High Range Radioactive Noble Gas Effluent Monitor (Stack Ragems) from Service to Allow Secondary Calibr IAW Master Surveillance Schedule. Completed Calibr on 970628 & Returned Stack Ragems to Svc ML20210L3081997-06-30030 June 1997 Corrected Page to MOR for June 1997 for Oyster Creek Nuclear Generating Station ML20141H2051997-06-30030 June 1997 Monthly Operating Rept for June 1997 for Oyster Creek Nuclear Station 1999-09-30
[Table view] |
Text
_.
LICENSEE EVENT REPORT T ACL BLOCO l l l l l l PLEASE PRINT oR VYPE ALL REQUIRED INFORMATION)
IOlillNIJl0I b l 1l@l0!0l-l0l0!0l0!Ol 7 8 9 uCENSA COoE i4 is ucENsE wesEa 1010l@lha a l1 uCENsE 11 11TvPE l120l@ls7 car l l sa @
CON'T IOI1I $,$$"C[ l L }@l 0 l 5 l 0 l 0 l 012 l 1 19 l@l 1 11 f2 16I7l8l@l1 74 75 l2l2l2l7l8l@
REPORT DATE 80 7 8 60 61 DOCK ET NUMB E R 68 69 EVENT CATE EVENT DESCRIPTION AND PROBABLE CONSEQUENCES h 1012Il On November 26, 1978, while performinO the Containment sorav svstem auto i lo lal [ actuation test, containment spray oump Sic failed to start on sianal . On I lo !al i subsequent attempts to start the system, SIC started each time. While l
[O !s j l performing the diesel generator auto actuation test on December 2, con- l l 0 is l l tainment spray pump 51A failed to start. In subsequent tests, there were l l 017 ! l pump motor power circuit breakers. l lOl8l l l 80 7 8 9 SYSTEM CAUSE CAUSE COYP. VALVE CODE COOE SUBCOOE COMPONENT CODE SUSCOCE SU8 CODE
[ 0_l a,l 7
I e l o l@ l E l@ l B lh l Cl K! Tl Bl Rl Klh [A_'@ l Z l @
9 10 11 12 13 18 19 20 S EQUENTI AL OCCURcENCE P2 PORT REVISION ggg EVENT YE AR R EPORT NO. CODE TYPE N O.
@ ,agg.go g 17 l8 I l-1 10 13 10 I 26 l-l 27 I 0l 3 l 28 29 lLl 30 l-l l0 l 32
._21 22 23 24 31 AKEN AC ON ON PL NT ME HOURS S8 i PO B. SUPPLIE MANUFAC RER
[3_j@lBl@ 34 lZl@ l36Z l@ l0 l0 l0 l0 l lYl@
41 l42Y l@ l43Nl@ l Gl 0l 8l 0l@
33 3b 3' 40 44 47 CAUSE DESCRIPTION AND CORRECTIVE ACTIONS 11 601 i The cause of the failure is attributed to excessive friction in the i li 111 l bearinos for the tric bar in the circuit breakers. The circuit breakers I l i l 21 l for the affected Dumos were disassembled and the trio bar bearinos were I l i 131 I cleaned and lubricated, !
Y 7 8 9
.I 80 I
ST S % POWE R OTHER STATUS ISCO RY DISCOVERY OESCRIPTION NA Containment Spray System Test l1 l 5 l l Hl@ l' 0 l 0 l 0l@l" "
l l'5B l@l l
8o "JTiv,Tv COETENT RELEASEO OP RELE ASE AMOUNT OF ACTIVITY LOCATION OF RELEASE NA NA fil'Il 8l 9Zl @ W @ l 7 to 11 44 l l 45 80 l
PERSONNEL EXPOSURES NUMBER TYPE DESCRIPTION l 117 l l Ol 0l Olh!' Zl@l NA l
,ERSO~NELi~;U4ES
S NuM8eR OESCRiPTiON@
li la 8l 9l 0l 0l0 l@l NA j 7 11 12 80 m*Eo' oko=P%'N S
'^c'""
NA 781229c p 1 l1 l 98 l9 l Zl@l10 80 l l I
7 ,
' " $ "L ISSUE
[ 2 l 01 l vf@l DESCRIPTION 7 8 9 10 Weekly news release - December @ 26, 1978 l f8 69 llllllllllll[f 80 3 Donald A. Ross 201-455-8784 o NAME OF PREPARER PHONE: $
. _ _ . ._ . .___ m . _ . . - - - _ _ _ _ _ _ -.
1 i d../-
& J: racy Centril Pcw;r & Light Camptny
- - . -.n7
' . 7 I
f'd *J* / Madison Avenue at Punch Bowl Road M d E 0--*h .di't[:4 Mornstown, New Jer ey 07960 (201)455-8200 OYSTER CREEK NUCLEAR GENERATING STATION Forked River, New Jersey 08731 Licensee Event Report '
Reportable Occurrence No. 50-219/78-30/3L-0 Report Date !
i December 22, 1978 !
Occurrence Date November 26, 1978 ,
Identification of Occurrence l
) ,
Failure of cantainment spray system ll pump 51C to start during a system I automatic actuation test. This event is considered to be a reportable i occurrence as defined in the Technical Specifications, paragraph 6.9.2.b.2.
~
Conditions Prior to Occurrence l The plant was in a refueling shutdown.
t i Reactor mode switch in shutdown.
Source range monitors - 30 cps.
All control rods at 00. !
Reactor water level - 165 inches. !
Reactor coolant temperature - 160*F.
Description of Occurrence [
c ;
\, On Sunday, November 26, 1978, containment spray system ll pump SIC failed to start when a simulated high drywell pressure was applied to'drywell pressure i sensors. The failure occurred during the performance of the containment !
l spray system automatic actuation test. On subsequent attempts to stsrt the j
( system, pump SIC started each time. The surveillance test was completed with i no additional discrepancy items. l t On Saturday, December 2, 1978, a similar failure occurred in containment !
j spray system I when containment spray pump 51 A failed to start during performance !
i of the diesel generator automatic actuation test. In subsequent tests, there !
were no further pump breaker failures. Investigation indicates a similar i problem with both pump motor power circuit breakers. !
~
1 L Jersey Central Power & Light Company is a Member of the Genera! Puolic Utilmes System !
6*'
.- l
~
Reportpble 0ccurrence No. 50-219/78-30/3L-0 Page 2 December 22, 1978 i
Apparent Cause of Occurrence The apparent cause of the failure is attributed to greater than normal f riction in the bearings fcr the trip bar in the circuit breaker for pump SlC.
Analysis of Occurrence The containment spray system is provided to remove heat energy from the containment in the event of a loss-of-coolant accident. The flow f rom one pump in either loop is more than ample to provide the required heat removal capability. The loss of the operation of one of the four containment spray pumps is considered to have minimal safety significance.
Corrective Action The circuit breakrs for the affected containment spray pumps were disassembled and the trip bar bearings were cleaned and lubricated. As part of the j critical corrective action, the outer two (2) trip bar bearings were disassembled /
i inspected and the bar rotated approximately 30' to check for greater than normal friction on the two (2) inner trip bar bearings. This trip bar rotation is limited to 30* by the latch mechanism.
j i
Based on the preventative maintenance performed on the containment spray breakers during the 1978 outage, we consider the breakers fully operable.
But to preclude the potential for a similar failure, all 460 V. containment spray pump breakers and core spray pump 460 V. breakers will be disassembled ;
with all four (4) trip bar bearings removed to further insure that no greater than normal friction exist in any trip bar bearings. This will be completed by February i, 1979 Additionally, the scope of the preventative maintenance 4
program concerning these breakers will be amplified to require complete disassembly / inspection of all breaker trip bar bearings.
Failure Data i General Electric '
Low voltage circuit breaker
- Type AK-2A-50 1 Frame size 1500 amps No. 20AA1392-214-CC
. L I
~
i a ;
l i
?
- a f