Forwards Issue 2 to Rev 6 to Beaver Valley Power Station Inservice Testing Program for Pumps & Valves. NRC Review of Encl Proposed Rev 1A to Second 10-year Inservice Testing Program Requested to Support 910412 Implementation
ML20058L309
Person / Time
Site: Beaver Valley
Issue date: 07/27/1990
From: Sieber J
DUQUESNE LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20058L311 List:
References
GL-89-04, GL-89-4, NUDOCS 9008070106
Download: ML20058L309 (3)


Text

- -. . . . . _ . . . - - - - - - - - - -

e ey Power Station

$Nppngport. PA 15077-0004 ce - Nales Group 6412) 393 E2%

July 27, 1990 U . S '. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555

Reference:

Beaver Valley Power Station, Unit ho. 1 I Docket No. 50-334, License No. DPR-66 a Updated Inservice Testing (IST) Program 1 Gentlemen:

The purpose of this submittal is to provide the NRC with an i informational copy of a revision to the Beaver Valley Unit No. 1 IST' Program and to request approval of certain proposed changes.

Included with this submittal is Enclosure.1 which contains the l

Unit No. 1 Program currently in use. Attachments 1 and 2 of  !

Enclosure 1 contain a summary of the program changes which have-  ;

been incorporated into -Revision 6. We have determined that these changes do not require prior NRC. approval since all changes were either. editorial- in nature or are in compliance with the-1983 edition through the summer 1983 addenda of ASME XI or the. positions delineated in Attachment 1 of Generic Letter 89-04. ,

Included as Enclosure 2 are proposed changes to the Unit No. 1  !

IST ' program which require prior NRC approval. These are submitted as marked up pages to. facilitate NRC review. This enclosure is labled Proposed Revision 1A. Attachment 1 of Enclosure 2 contains a summary of the specific changes in Proposed Revision 1A. It is requested that the NRC review these items on a schedule which would-support implementation before . the eighth refueling outage tentatively scheduled to begin April 12, 1991.

Future changes to the Unit No. 1 Program requiring prior NRC approval. will be labeled " Proposed Revision 1 , and lettered sequentially according to the last revision formally submitted to m the: 'NRC for review and approval. Upon NRC approval, these proposed changes will be- formally issued as an additional revision to the f Unit No. 1 IST Program.

9008070106 900727 gDR ADOCK 0500 4 qc

Beavor Valloy Power Station, Unit No. 1 Docket No. 50-334, License No. DPR-66 Page 2 If you have any questions regarding this submittal, please contact me or members of my staff.

Very truly yours, j

. D. Sieber ice President Nuclear Group cc: Mr. J. Beall, Sr. Resident Inspector Mr. T. T. Martin, NRC Region I Administrator Mr. A. W. DeAgazio, Prcject Manager Mr.-R. Saunders (VEPCO)

ENCLOSURE 1 REVISION 6 TO BEAVER VALLEY POWER STATION, UNIT NO. 1

-SECOND TEN YEAR IST PROGRAM (ISSUE 2)