From: Gorum A
ARMY, DEPT. OF
To: Brunner E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML17298A033 List:
References
FOIA-81-311, FOIA-Z81-311 NUDOCS 8204210638
Download: ML20054C780 (2)


Text

-

a ,,

f

. r- .-

A

- DEPARTMENT OF THE' ARMY

  1. q'1'M ARMY MATERIALS ANo MECHANICS RESEARCH CENTER

.g wATERTOWN M ASSACHUSETTS o2172 2 2 JAN 1976 A300!R-AR U. S. Nuclear Regulatory Commission Reactor Operations and Nuclear Support Branch AITN: >!r. Eldon J. Brunner Region I 631 Park Avenue King of Prussia, PA 19406

Dear Str. Brunner:

In response to your letter of 12 December 1975, the following information is provided regarding the activities cited as not being conducted in full co=pliance with NRC requirements:

a. Reactor Safeguards Committee Audits (1) Corrective Steps Taken and Results_: Reactor Safeguards Comnittee meetings will be held every six months to audit activities in the plant area. Copies of your letter of 12 December 1975 have been ,

distributed to RSC members for review.

(2) Corrective Stecs to Avoid Further Violations: RSC audits will be conducted in conjunction with the second and fourth quarterly radiation surveys.

(3) Full Comoliance Date: 15 April 1976

b. Weekly Visual Inscection of the Heating and Ventilation System l

1 (1) Corrective Steos Taken and Results: Visual inspections are l

l being done on a weekly basis.

I (2) Corrective Steps to Avoid Further Violations: An alternate

(

i emoloyee has been designated to insure tnat weekly visual inspections are performed.

i (3) Full Cocaliance Date: 29 December 1975 i

l l

t 8204210638 811005 -

PDR FOIA j KADAT-Z81-311 PDR l -... _ ...

f*

^

. ~ ,~ R -Q

.f"- .

2 2 Dr. G'E

  1. DOIR-AR Mr. Eldon J. Brunner
c. Posting Requirements of 10 CFR 19.11 (1) Corrective Steps Taken and Results: Current copies of License R-6S and amendments thereto have been posted at the main air lock door.

(2) Corrective Steos to Avoid Further Violations: The RSC as part of the semi-annual audit will review for compliance with posting requirements of 10 CFR 19.11.

(3) Full Cocoliance Date_: 2 December 197S This Center will be pleased to provide any additional information.

Sincerely, d.E w

. E. GORth!

Director CF:

Reactor Facility Supervisor Ch, Rad 6 Occ Safety Office Ch, Fac Eng Office Chairman, Reac Saf Corea General Counsel e