ML20054C599
| ML20054C599 | |
| Person / Time | |
|---|---|
| Site: | 05000047 |
| Issue date: | 06/24/1965 |
| From: | Kornblith L US ATOMIC ENERGY COMMISSION (AEC) |
| To: | Price E US ATOMIC ENERGY COMMISSION (AEC) |
| Shared Package | |
| ML17298A033 | List:
|
| References | |
| FOIA-81-311, FOIA-Z81-311 NUDOCS 8204210376 | |
| Download: ML20054C599 (1) | |
Text
_. _ _
g /I b/ b, f
q
.m
=g M*{
eam een, ame, um, a UNITED STATES GOVERNMENT
'<4*
-Memorandum
&aw[
09 A -w To Eber R. Price, Director DATE: JUN 2 41965 i
Division of State and Licensee Relations 2 pew FROM
. j J., Kornblith, Jr., Assistant Director Mfor Reactors 7 Division of Ccmpliance SUBJEcr:
U. S. ARMY MATERIALS RESEARCH AGENCY DOCKET NO. 50-47 AITN:
R. G. Page The attached report by cur field inspector of a visit to the Watertown Arsenal Reactor on April 1,1965, is forwarded for information. No items of noncompliance or safety problems were noted during the visit.
The problem noted in our previous report regarding neutron multiplication during approach to critical has been resolved.
A change in the beryllium reflector geometry resulted in the improvement in the observed =ulieplication during a startup.
Attachment:
CO Rpt No. 47/65-1 by J. R. Sears dtd 6/18/65 Distribution:
J. P. O'Reilly, Region I (2)
M. L. Ernst, Region II H. D. Thornburg, Region III J. W. Flora, Region IV R. H. Engelken, 0.2gion V h Sears, Region I M. M. Mann, REG, w/o att.
C. A. Nelson, INS, w/o att.
R. L. Doan, DRL E. G. Case, DRL
["
R. S. Boyd, DRL (2)
D. J. Skovholt, DRL DRL Files 8204210376 811005 PDR FOIA y
KABAT-Z81-311 PDR 5y E
Buy U.S. Savings Bonds Regularly en the Payroll Satings Plan J