ML20054C757

From kanterella
Jump to navigation Jump to search
Responds to NRC 771019 Ltr Re Violations Noted in IE Insp Rept 50-047/77-01.Corrective Actions:Heating & Ventilation Sys Will Be Inspected Monthly & Radiation Warning Signs Posted
ML20054C757
Person / Time
Site: 05000047
Issue date: 11/09/1977
From: Wright E
ARMY, DEPT. OF
To: Brunner E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML17298A033 List:
References
FOIA-81-311, FOIA-Z81-311 NUDOCS 8204210606
Download: ML20054C757 (2)


Text

m

' ', h *; , ,

m "'.

  1. e DEPARTMENT OF THE ARMY

/q]/% ARMY M ATERI ALS AND MECH ANIC$ RESEARCH CENTER WATERTOWN. M ASS ACHusETTS o2172 DR.UR-X 9 November ^1977 U. S. Nuclear Regulatory Co::nission ~

Reactor Operations & Nuclear Support 3 ranch -

ATTN: Mr. Eldon J. 3 runner Region I 631 Park Avenue King of Prussia, Pennsylvania 19406

Dear M . Brunner:

In response to your letter of 19 October 1977 (Docket No. 50-47), the following information is provided regarding the activities cited as not being conducted in full compliance with NRC requirements-Item A - Monthly Checks of the Heating & Ventilation Systems (1) Corrective Stecs Which Have 3een Taken and Results Achieved:

1 A suspense date of 20th of each =enth has been established I for the Facilities Engineering 3 ranch.

(2) Corrective Steps Which Will 3e Taken to Avoid Further Items of Non-Ccepliance: With the suspense file under the con-trol of the Facilities Engineering 3 ranch, there will be no further items of non-co=pliance.

l 1 (3) Date When Full Compliance Will 3e Acnieved: 7 November 1977.

Item 3 - Posting of High Radiation Area (1) Corrective Steps Which Have 3een Taken and Results Achieved:

A "High Radiation Area" sign was posted on the access path to the core plate area of the reactor vessel.

(2) Corrective Steps Which Will Be Taken To Avoid Further Items of Non-Compliance: Health physics personnel will be re- .

quired as a part of the quarterly facility radiation sur-vey, to insure that all radiation warning signs are posted and noted with the current radiation levels where applicable.

3 CWTlo9 J $

= ,

t m.s /

,we b

1-311

~

, R rT DRXMR-X 9 November 1977 U. S. Nuclear Regulatory Comission (3) Date When Full Compliance Will Be Achieved: 10 October 1977.

i This Center will be pleased to provide any additional information.

Copy furnished: Sincerely, ,

Commander / Deputy Director

  • Reactor Facility Supervisor g t Chief, Radiation & Occupational 3 ,

Safety 3 ranch Chief, Facilities Engineering E. S. WRIGHT l

3 ranch Director Chair:an, Reactor Safeguards Comittee 1

i t

e

- - - - -m -

v -c---. -