Letter Sequence Other |
|---|
|
Results
Other: 05000346/LER-1982-019-01, /01X-1:on 820419,during Steam Generator Eddy Current Insp,Some Generator Tubes Adjacent to Auxiliary Feedwater Header Showed Potential Interaction W/Header Support Sys.Caused by Collapse of Steam Bubble in Header, ML16299A368, ML20027B506, ML20027C424, ML20052A442, ML20053D846, ML20053E437, ML20053E475, ML20054G584, ML20054H506, ML20054J484, ML20058J620, ML20062C407, ML20062N798, ML20065C137, ML20079R108, ML20261N102
|
MONTHYEARML20261N1021981-06-0505 June 1981 Piping Isometric:Main Steam System Ctmt Bldg Steam Gen 1-2 Project stage: Other ML20052A4421982-04-20020 April 1982 RO 82-10:on 820419,insp of B once-through Steam Generator Revealed Deformations Similar to Deformations at Davis Besse.Generator a Will Be Inspected 820420.Analysis Details to Be Forwarded When Completed Project stage: Other ML20052H4161982-05-10010 May 1982 Summary of 820423 Meeting W/Utils in Bethesda,Md Re Auxiliary Feedwater Header Damage in Certain B&W Plants. Agenda Encl Project stage: Meeting ML20053A4681982-05-20020 May 1982 Forwards 820429 & 0505 Ltrs Re RO 82-09 on Repairs to HPI Nozzles, & RO 82-10 Re Deformations in Auxiliary Feedwater Header Ring & Proposed TMI Requirements.Encl Consists of Info Sent to NRC After Util 820421 Rept to Aslab.W/O Ltrs Project stage: Other ML20054G9991982-05-20020 May 1982 Submits Details Re Mod of once-through Steam Generator Auxiliary Feedwater Header,Per NRC Request at 820518 Meeting.Sketches Encl Project stage: Meeting ML20054G5841982-05-20020 May 1982 Submits Addl Info Re Auxiliary Feedwater Header Mod,Per NRC Request.Existing Headers Have Become Distorted Since Original Fabrication.Headers Will Be Replaced & Stabilized to Prevent Further Unacceptable Damage to Steam Generators Project stage: Other ML20053E4371982-05-21021 May 1982 Submits Agreements Reached During 820518 Discussions Re Anticipated Mods to Steam Generator Auxiliary Feedwater Distribution Headers.Written Work Scope for Attaching Nozzle Flange Prior to Work on Steam Generator Expected Project stage: Other ML20053E4751982-05-21021 May 1982 Requests Addl Info in Response to Listed Questions Re Util Responses to Aslab 820415 Memorandum & Order Concerning Repair & Future Operation of HPI Nozzles.Response Requested within 20 Days of Receipt of Ltr Project stage: Other 05000346/LER-1982-019-01, /01X-1:on 820419,during Steam Generator Eddy Current Insp,Some Generator Tubes Adjacent to Auxiliary Feedwater Header Showed Potential Interaction W/Header Support Sys.Caused by Collapse of Steam Bubble in Header1982-05-24024 May 1982 /01X-1:on 820419,during Steam Generator Eddy Current Insp,Some Generator Tubes Adjacent to Auxiliary Feedwater Header Showed Potential Interaction W/Header Support Sys.Caused by Collapse of Steam Bubble in Header Project stage: Other ML20053D8461982-05-26026 May 1982 Interim Deficiency Rept Re Design of Internal Auxiliary Feedwater Header in B&W Steam Generator.Probable Cause of Deformation Is Header Inability to Withstand Temp & Pressure.External Ring to Be Added.Next Rept Due 820730 Project stage: Other ML20054J0091982-06-0909 June 1982 Responds to 820608 Telecopy Re Preliminary Description of Stabilization of Steam Generator Internal Auxiliary Feedwater Headers.Util Can Proceed W/Internal Header Stabilization as Described Based on Review & 820609 Telcons Project stage: Other ML16299A3811982-06-15015 June 1982 Notification of 820624 Meeting W/Util & B&W Owners Task Task Group in Bethesda,Md to Discuss Generic Repairs & Design Mods Re Damaged Auxiliary Feedwater Header Inside Steam Generators Project stage: Meeting ML20054H5061982-06-21021 June 1982 Requests List of Specific New B&W Steam Generator Auxiliary Feedwater Header Design Details Required for NRC Design Review of New Scheme to Supply Auxiliary Feedwater to Steam Generators Project stage: Other ML20054J4841982-06-23023 June 1982 Requests Addl Info Re Auxiliary Feedwater Header Repair, Reported in LER 82-019,Revision 1.Info Needed 10 Days Prior to Scheduled Restart Project stage: Other ML20054J4821982-06-23023 June 1982 Requests Addl Info Re Auxiliary Feedwater Header Repair, Reported in LER 82-10.Response Should Be Provided 10 Days Prior to Scheduled Restart Project stage: Other ML20062D6171982-07-0101 July 1982 Evaluation,Repair & Replacement of Damaged Internal Auxiliary Feedwater Header at Davis Besse 1,Oconee 3 & Rancho Seco Project stage: Other ML20062C3941982-07-30030 July 1982 Application for Amend to License NPF-3,revising Tech Spec Table 3.7-3 to Reflect Steam Generator Auxiliary Feedwater Header Mod.Identification of Snubbers Removed & Relocated During Mod to Header Encl Project stage: Request ML20058H4621982-07-30030 July 1982 Forwards Addl Info in Response to NUREG-0737,Item II.K.3.17 Re Description of ECCS & Emergency Diesel Generator Outage Time Due to Surveillance Testing or Preventive Maint,Per 820701 Request Project stage: Request ML20062C4071982-07-30030 July 1982 Tech Spec Table 3.7-3 Re safety-related Hydraulic Snubbers. Safety Evaluation for Auxiliary Feedwater Header Replacement Encl Project stage: Other ML20062C3791982-07-30030 July 1982 Forwards Application for Amend to License NPF-3,revising Tech Spec Table 3.7-3 to Reflect Steam Generator Auxiliary Feedwater Header Mod.Class III Fee Encl Project stage: Request ML20062D5971982-08-0303 August 1982 Forwards BAW-1732, Evaluation,Repair & Replacement of Damaged Internal Auxiliary Feedwater Header at Davis Besse 1,Oconee 3 & Rancho Seco, Per 820624 Meeting W/Nrc in Bethesda,Md & NRC 820623 Request.Response Summary Submitted Project stage: Meeting ML20058J6201982-08-0606 August 1982 Forwards Addl Info Re Auxiliary Feedwater Header Repair,In Response to NRC 820623 Request.One Oversize Drawing Encl. Aperture Card Is Available in PDR Project stage: Other ML20062N7981982-08-16016 August 1982 Forwards Info Re Auxiliary Feedwater Header/Steam Generator Mod,In Response to NRC Questions in .Also Discusses Potential for Crack Propagation in Retired Header. Util Will Propose Changes to Tech Specs within 30 Days Project stage: Other ML16299A3681982-08-24024 August 1982 Trip Rept of 820820 Site Visit Re Mods to Emergency Feedwater Headers in Steam Generators & Recent Extraction Steam Line Break Project stage: Other ML16138A5291982-08-31031 August 1982 Summary of 820624 Meeting W/Toledo Edison Co,Duke Power Co, Cpc,Smud,B&W & Anl in Bethesda,Md to Discuss Licensees Repair Program for Damaged Internal Auxiliary Feedwater Headers.List of Attendees & Matls Presented Encl Project stage: Meeting ML20027B5391982-09-13013 September 1982 Forwards Requested Info Re Auxiliary Feedwater Stabilized Internal Header.Includes B&W Info Re Commitment to Prepare Design Rept for Modified Steam Generator & Auxiliary Feedwater Piping Sys Project stage: Other ML20027B5061982-09-14014 September 1982 Documents Review of Results of Auxiliary Feedwater Flow Verification & Water Hammer Tests.Calculation Sheet from 820825 Auxiliary Feedwater Test Run Encl Project stage: Other ML20065C1371982-09-16016 September 1982 Advises of Delay in Submittal of Proposed Tech Specs Re Auxiliary Feedwater Header Insps Due to Intensive Resource Requirements to Start Up from Refueling Outage.Submittal Expected by 821029 Project stage: Other ML20027C4321982-09-29029 September 1982 Forwards Safety Evaluation Re once-through Steam Generator Repair & Emergency Feedwater Sys Mod.Licensee Authorized to Resume Power Operation Project stage: Approval ML20027C4381982-09-29029 September 1982 Safety Evaluation Supporting Resumption of Power Operations Following once-through Steam Generator Repair & Emergency Feedwater Sys Mods Project stage: Approval ML20027C4241982-10-0606 October 1982 Discusses NRR Actions Taken Under Task Interface Agreement 82-20 for Steam Generator Auxiliary Feedwater Header Damage.Licensee Authorized to Resume Power Operation at Oconee 3 Project stage: Other ML20079R1081983-06-17017 June 1983 Part 21 Rept Re Adequacy of Fittings Supplied by Tube-Line Corp Through Capitol Pipe & Steel Products Co for Use on New Auxiliary Feedwater Headers of Steam Generators.Flanges Not heat-treated as Required by Matl Specs Project stage: Other 1982-06-09
[Table View] |
Text
_
/
n y
y a
b 6 J(X)
,DI STRIBUTION_
,1g g(
Docket y Kl, PUR LPDR ORB #4 Rdg DEisenhut Docket No. 50-312 OELD AE0D IE ACRS-10
!!r. J. J. !!attimoe RIngram Assistant General !!anager and MPadovan Chief Engineer Gray File Sacramento 11unicipal Utility EBlackwood District H0rnstein G201 S Street SMiner P. O. Box 15830 TIppolito Sacramento, California 95813
Dear !!r. Mattimoe:
SUBJECT:
STENT GENERATOR INTERNAL FEEDWATER HEADER REPLACEMEllT On May 18,1982 discussions were held between J. !!attimoe, two Bfdl representatives and members of the NRC staff on the above subject.
The purpose of the discussions was to inform the NRC staff abou t anticipated modifications to be made to the Rancho Seco steam generator arf distribution headers. The proposed modifications centered around 1) deactivation and stabilization of the existing internal arf headers and 2) installation of an internal ARI ring header.
Our understanding of the agreements reached during these discussions is as follows:
- 1) S!!UD may proceed with the drilling of the 5 inch holes in the steam generator shell, provided a 10 CFR 50.59 review has been completed and approved by the PRC and MSRC.
- 2) An analysis indicating that the ASitE B&PV Code requirements have been met shall be completed, and all procedures necessary for the modifications shall be written and receive PRC review.
- 3) The design of the ARI external header will be reviewed by the NRC prior to its installation.
- 4) The NRC will approve the method of internal header stabilization prior to the stabilization work being performed.
- 5) The plant will not be started up until written approval from the NRC is received.
Subsequently, during a April 20, 1982 telephor,e conversation, SMUD agreed to provide a written work scope for attaching the nozzle flange prior to initiating work on the steam generator.
I i
. l 8206080088 820521 OFFICE )
e m oOcx = 0*g;g
_o
{
P
- DAT, OFFICIAL RECORD COPY usam i,u-mse t4ac ronu ais tia-so3 Nacu c24a l
b$ -
'h Cs 4[f g
=
i Mr. J. J. Mattimoe ~
If your understanding of these commitments is different from the above, please contact your NRC Project Manager as soon as possible.
l Sincerf g, A C D BY'
$0:-mf,=cm..
John F. Stolz, Chief Operating Reactors Branch #4 Division of Licensing cc: See next page i
4...
=
s suIb$.[h
~
ko" 5k!
f a.o..
.....s/3.3/ s2..
s/2/182...
s/3.g/82 sze.ysa,,.
om>
NRC FORM 318 '(10-80) NRCM 0240 OFFICIAL RECORD COPY usa m ini_ m m
. - )
Sacr'ainento\\ unicipal Utility Rancho Seco, Docket No. 50-312 M
District ccw/ enclosure (s):
I
' David S. Kaplan, Secretary and Christopher Ellison, Esq.
General Counsel Dian Grueuich, Esq.
Sacramento Municipal Utility California Energy Comission District 1111 Howe Avenue 6201 S Street Sacramento, California 95825 P. O. Box 15830 Sacramento, California 95813 Ms. Eleanor Schwartz California State Office 600 Pennsylvania Avenue, S.E., Rm. 201 Sacramento County Board of Supervisors Washington, D. C.
20003 827 7th Street, Room 424 Sacramento, California 95814 Docketing and Service Section l
Office of the Secretary Business and Municipal Department U.S. Nuclear Regulatory Comission l
Sacramento City-County Library Washington, D. C.
20555 828 I Street Resident Inspcctor/ Rancho Seco Sacramento, California 95814 c/o U. S. N. R. C.
14410 Twin Cities Road Herald, CA 95638 Dr. Rir.hard F. Cole Atomic Safety & Licensing Board Panel U.S. Nuclear Regulatory Comission Washington, D. C.
20555
~
Regional Radiation f.epresentative EPA Reaion IX Mr. Frederick J. Shon 215 Fremont Street Atomic Safety and Licensing Board San Francisco, California 94111 Panel U.S. Nuclear Regulatory Comission Mr. Rcbert B. Borsum Washington, D. C.
20555 Babcock & Wilcox Nuclear Power Generation Division Elizabeth S. Bowers, Esq.
Suite 220, 7910 Woodnont Avenue Chainnan, Atomic Safety and Bethesda, Maryland 20814 Licensing Board Panel U.S. Nuclear Regulatory Comission Thomas Baxter, Esq.
Washington, D. C.
20555 Shaw, Pittman, Potts & Trowbridge 1800 M Street, N.W.
Washington, D. C.
20036 Herbert H. Brown, Esq.
Lawrence Coe Lanpher, Esq.
Hill, Christopher and Phillips, P.C.
1900 M Street, N.W.
Atomic Safety and Licensing Board Washington, D. C.
20036 Panel U.S. Nuclear Regulatory Commission Helen Hubbard Washington, D. C.
20555 P. O. Box 63 Sunol, California 94586
/
i.g
SacraEntohunicipal Utility District Atomic Safety and Licensing Appeal Mr. Robert H. Engelken, Regional Administrator U. S. Nuclear Regulatory Comission, Region V Board Panel U.S. Nuclear Regulatory Comission 1990 N. California Boulevard, Suite 202 Washington, D. C.
20555 Walnut Creek, California 94596 Alan S. Rosenthal, Chairman Atomic Safety and Licensing Appeal Board U. S. Nuclear Regulatory Comission Washington, D. C.
20555 Dr. John H. Buck l
Atomic Safety and Licensing Appeal Board U. S. Nuclear Regulatory Comission Washington, D. C.
20555 Christine H. Kohl Atomic Safety and Licensing Appeal Board U. S. Nuclear Regulatory Comission Washington, D. C.
20555 I
California Department of Health ATTN: Chief. Environmental Radiation Control Unit Radiological Health Section 714 P Street, Room 498 Sacramento, California 95814
__