ML20062D617
From kanterella
Jump to navigation
Jump to search
Letter Sequence Other | |
---|---|
TAC:48384, (Open) | |
Initiation
Questions
| |
MONTHYEARML20054G9991982-05-20020 May 1982
[Table View]Submits Details Re Mod of once-through Steam Generator Auxiliary Feedwater Header,Per NRC Request at 820518 Meeting.Sketches Encl Project stage: Meeting ML20054G5841982-05-20020 May 1982 Submits Addl Info Re Auxiliary Feedwater Header Mod,Per NRC Request.Existing Headers Have Become Distorted Since Original Fabrication.Headers Will Be Replaced & Stabilized to Prevent Further Unacceptable Damage to Steam Generators Project stage: Other ML20054J0091982-06-0909 June 1982 Responds to 820608 Telecopy Re Preliminary Description of Stabilization of Steam Generator Internal Auxiliary Feedwater Headers.Util Can Proceed W/Internal Header Stabilization as Described Based on Review & 820609 Telcons Project stage: Other ML20054J4821982-06-23023 June 1982 Requests Addl Info Re Auxiliary Feedwater Header Repair, Reported in LER 82-10.Response Should Be Provided 10 Days Prior to Scheduled Restart Project stage: Other ML20062D6171982-07-0101 July 1982 Evaluation,Repair & Replacement of Damaged Internal Auxiliary Feedwater Header at Davis Besse 1,Oconee 3 & Rancho Seco Project stage: Other ML20062D5971982-08-0303 August 1982 Forwards BAW-1732, Evaluation,Repair & Replacement of Damaged Internal Auxiliary Feedwater Header at Davis Besse 1,Oconee 3 & Rancho Seco, Per 820624 Meeting W/Nrc in Bethesda,Md & NRC 820623 Request.Response Summary Submitted Project stage: Meeting 1982-06-09 |
ML20062D617 | |
Person / Time | |
---|---|
Site: | Davis Besse, Oconee, Rancho Seco, 05000000 |
Issue date: | 07/01/1982 |
From: | BABCOCK & WILCOX CO. |
To: | |
Shared Package | |
ML20062D598 | List: |
References | |
BAW-1732, TAC-48384, NUDOCS 8208060168 | |
Download: ML20062D617 (32) | |
Category:REPORTS-TOPICAL (BY MANUFACTURERS-VENDORS ETC)
MONTHYEARML20248F7441998-05-31031 May 1998
[Table view]Reactor Vessel Working Group,Response to RAI Regarding Reactor Pressure Vessel Integrity ML17353A4341995-10-31031 October 1995 Rev 1 to BAW-2245, Initial Rt of Linde 80 Welds Based on Fracture Toughness in Transition Range. ML20107M8931995-10-31031 October 1995 Nonproprietary DPC Fuel Reconstitution Analysis Methodology ML17264A1181995-07-31031 July 1995 Response to Part (1) of GL 92-01,Rev 1,Suppl 1. ML20149H1451994-10-31031 October 1994 Cycle 10 - Reload Rept ML20064L2001994-01-31031 January 1994 Final Rept EPRI TR-103591, Burnup Verification Measurements on Spent-Fuel Assemblies at Oconee Nuclear Station ML20065D0651993-12-31031 December 1993 Plant-Specific Analysis in Response to NRC Bulletin 88-011, 'Pressurizer Surge Line Thermal Stratification' Davis-Besse Nuclear Power Station Unit 1 ML20097G0421992-05-31031 May 1992 Analysis of Capsule OCIII-D Duke Power Company Oconee Nuclear Station Unit-3 ML20085D1471991-09-30030 September 1991 Plant-Specific Analysis in Response to NRC Bulletin 88-011, 'Pressurizer Surge Line Thermal Stratification,' Davis-Besse Nuclear Power Station,Unit 1 ML20072U4211990-12-31031 December 1990 Analysis of Capsule TE1-D,Toledo Edison Co,Davis Besse Nuclear Power Station Unit 1 Reactor Vessel Matl Surveillance Program ML20067A5241990-12-31031 December 1990 Final Submittal in Response to NRC Bulletin 88-011, 'Pressurizer Surge Line Thermal Stratification.' ML20006A8231990-01-10010 January 1990 Errata to Rev 3 to BAW-1543, Master Integrated Reactor Vessel Surveillance Program Consisting of Revised Tables 3-20 & E-1 ML19332D5391989-10-31031 October 1989 Core Thermal-Hydraulic Methodology Using VIPRE-01. ML19351A4191989-09-30030 September 1989 Mark-BW Reload LOCA Analysis for Catawba & McGuire Units. ML20042F2321989-08-31031 August 1989 Nonproprietary DCHF-1 Correlation for Predicting Critical Heat Flux in Mixing Vane Grid Fuel Assemblies. ML20235M9111989-02-20020 February 1989 Nonproprietary Catawba Unit 1 Evaluation for Tube Vibration Induced Fatigue ML20207L7781988-10-0606 October 1988 Nonproprietary WCAP 11936, McGuire Unit 2 Evaluation for Tube Vibration Induced Fatigue ML20207L9261988-09-30030 September 1988 Nonproprietary Addendum 2 to COBRA-NC,Analysis for Main Steamline Break in Catawba Unit 1 Ice Condenser Containment (Response to NRC Questions) ML20154M2421988-09-30030 September 1988 Simulate-3 Validation & Verification ML20154J9831988-04-30030 April 1988 RCS Flow Anomaly Investigation Rept ML20239A6991987-11-30030 November 1987 Addendum 1 to Rev 2 to Integrated Reactor Vessel Matl Surveillance Program (Addendum) ML20237C4091987-11-30030 November 1987 Nonproprietary Rev 2 to Byron/Braidwood T-Hot Reduction Final Licensing Rept ML20209G1831986-12-31031 December 1986 Rev 1 to Availability Evaluation for SPDS at Rancho Seco Plant ML18149A5121986-11-30030 November 1986 Qualification of WRB-1 CHF Correlation in VEPCO Cobra Code. ML20207H9761986-11-30030 November 1986 Nonproprietary Resistance Temp Detector Bypass Elimination Licensing Rept for Byron 1 & 2 & Braidwood 1 & 2 ML20213D9651986-10-31031 October 1986 Small Break LOCA Analysis for B&W 177FA Raised Loop Plant in Response to NUREG-0737,Item II.K.3.31 ML20215H8801986-09-30030 September 1986 Small Break LOCA Analysis for B&W 177FA Lowered Loop Plants in Response to NUREG-0737,Item II.K.3.31 ML20210A6051986-09-0505 September 1986 Addendum a to Vol II of Nusco 140-2, Nusco Thermal Hydraulic Model Qualification ML20155J4911986-05-31031 May 1986 Rev 0 to Core Protection Calculator/Control Element Assembly Calculator Software Mods for CPC Improvement Program Reload Data Block ML20155J5051986-05-31031 May 1986 Rev 1 to Functional Design Requirements for Control Element Assembly Calculator ML20155J5231986-05-31031 May 1986 Rev 1 to Functional Design Requirement for Core Protection Calculator ML20203G5481986-03-31031 March 1986 Relaxed Power Distribution Control Methodology & Associated Fq Surveillance Tech Specs ML20151Z0521986-01-31031 January 1986 Rev 3 to CEN-39(A)-NP, CPC Protection Algorithm Software Change Procedure ML20151Z0641986-01-31031 January 1986 Rev 0 to CEN-323-NP Reload Data Block Constant Installation Guidelines ML20137L6721986-01-20020 January 1986 Errata to Pressurized Thermal Shock Evaluations in Accordance W/10CFR50.61 for B&W Owners Group Reactor Pressure Vessels ML20140A6821985-12-31031 December 1985 Reactor Vessel Fluence & Ref Temp for Pressurized Thermal Shock Evaluations ML20214W6551985-11-30030 November 1985 Rev 1 to BAW-1823, Once-Through Steam Generator Mechanical Sleeve Qualification ML20138M4211985-09-30030 September 1985 Justification for Raising Setpoint for Reactor Trip on High Pressure, Transient Assessment Program ML20135A5571985-08-31031 August 1985 B&W Owners Group Cavity Dosimetry Program ML20205F2711985-08-31031 August 1985 Errata & Addenda Sheet 14,replacing Pages v/vi,3-2,4-3,4-10, 4-15 & 4-16 to, LOCA Analysis Rept for Dresden Units 2,3 & Quad Cities 1,2 Nuclear Power Stations ML20135H9491985-08-31031 August 1985 Rev 1 to Reload Nuclear Design Methodology ML20134N2941985-07-31031 July 1985 Rev 00 to Functional Design Requirement for Control Element Assembly Calculator ML17346B1711985-07-31031 July 1985 Retran Code Transient Analysis Model Qualification. ML20134N3021985-07-31031 July 1985 Rev 00 to Functional Design Requirement for Core Protection Calculator ML20133H3591985-07-31031 July 1985 Statistical DNBR Evaluation Methodology ML20138P1541985-07-0202 July 1985 Rev 1 to TMI-1 Nuclear Generating Station Natural Circulation Cooldown Analysis W/O Reactor Vessel Upper Head Void Formation, Topical Rept ML20127K1381985-06-30030 June 1985 Nuclear Physics Methodology for Reload Design ML20128Q2751985-05-31031 May 1985 Revised Nomad Code & Model ML20129E9881985-05-30030 May 1985 VEPCO Reactor Sys Transient Analysis Using Retran Computer Code ML20111C1171985-01-31031 January 1985 Rev 1 to Comprehensive Vibration Assessment Program for Palo Verde Nuclear Generating Station Unit 1 (Sys 80 Prototype),Evaluation of Predictions & Pre-Core Hot Functional Measurement & Insp Programs 1998-05-31 Category:TEXT-SAFETY REPORT MONTHYEARML20217K1231999-10-14014 October 1999
[Table view]Revised Positions for DBNPS & Pnpp QA Program ML20217D5441999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Davis-Besse Nuclear Power Station.With ML20211R0811999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Davis-Besse Nuclear Power Station,Unit 1.With ML20211H7921999-08-13013 August 1999 Safety Evaluation Supporting Amend 126 to License DPR-54 ML20211B0271999-08-13013 August 1999 SER Accepting Second 10-year Interval Inservice Insp Requests for Relief RR-A16,RR-A17 & RR-B9 for Plant, Unit 1 ML20210Q8541999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Davis-Besse Nuclear Power Station,Unit 1.With ML20209E6231999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Davis-Besse Nuclear Power Station,Unit 1.With ML20195K2871999-06-16016 June 1999 Safety Evaluation Accepting Licensee Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves ML20195F4871999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Davis-Besse Nuclear Power Station,Unit 1.With ML20207E8011999-05-19019 May 1999 Non-proprietary Rev 2 to HI-981933, Design & Licensing Rept DBNPS Unit 1 Cask Pit Rack Installation Project ML20195D1901999-05-0606 May 1999 Annual Rept ML20207F4351999-05-0404 May 1999 Rev 1 to DBNPS Emergency Preparedness Evaluated Exercise Manual 990504 ML20206M6341999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Davis-Besse Nuclear Station,Unit 1.With ML20205M2931999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Davis-Besse Nuclear Power Station.With ML20207J1461999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Davis-Besse Nuclear Power Station,Unit 1.With ML20199H5931999-01-20020 January 1999 Safety Evaluation Accepting Thermo-Lag Re Ampacity Derating Issues for Plant ML20206P1501999-01-0505 January 1999 LER 98-S03-00:on 981207,security Officer Discovered Uncontrolled Safeguards Info Drawing.Caused by Failure to Follow Established Procedures & Policies.Drawing Was Controlled by Site Security.With ML20199E2501998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Davis-Besse Nuclear Power Station,Unit 1.With ML20204J6751998-12-31031 December 1998 1998 Annual Rept for Dbnps,Unit 1,PNPP,Unit 1 & BVPS Units 1 & 2 ML20205K5781998-12-31031 December 1998 Waterhammer Phenomena in Containment Air Cooler Swss ML20216F9931998-12-31031 December 1998 Piedmont Municipal Power Agency 1998 Annual Rept ML20206B0101998-12-31031 December 1998 1998 Annual Rept for Firstenergy Corp, for Perry Nuclear Power Plant & Davis-Besse Nuclear Power Station.Form 10-K Annual Rept to Us Securities & Exchange Commission for Fiscal Yr Ending 981231,encl ML20195H8571998-12-31031 December 1998 1998 Annual Rept for Smud. with ML20198E6381998-12-17017 December 1998 LER 98-S02-00:on 981130,security Access Was Revoked Due to Falsification of Criminal Record.Individual Was Escorted from Protected Area & Unescorted Access Was Restricted. with ML20197J3441998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Davis-Besse Nuclear Power Station,Unit 1.With ML20195D0001998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Davis-Besse Nuclear Power Station,Unit 1.With ML20155B6781998-10-28028 October 1998 Safety Evaluation Accepting Proposed Reduction in Commitment Changes in QA Program Matl Receipt Insp Process ML20155D4801998-10-27027 October 1998 Amend 3 to Rancho Seco DSAR, Representing Updated Licensing Basis for Operation of Permanently Shutdown & Defueled Rancho Seco Nuclear Facility During Permanently Defueled Mode ML20154H5801998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Davis-Besse Nuclear Power Station,Unit 1.With ML20153G4601998-09-30030 September 1998 USI A-46 Seismic Evaluation Rept, Vols 1-2 ML17354B0971998-09-0909 September 1998 Part 21 Rept Re Possible Machining Defect in Certain One Inch Stainless Steel Swagelok Front Ferrules,Part Number SS-1613-1.Caused by Tubing Slipping Out of Fitting at Three Times Working Pressure of Tubing.Notified Affected Utils ML15261A4681998-09-0404 September 1998 Safety Evaluation Supporting Amends 232,232 & 231 to Licenses DPR-38,DPR-47 & DPR-55,respectively ML20151W1611998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Dbnps.With ML20237E3171998-08-21021 August 1998 ISI Summary Rept of Eleventh Refueling Outage Activities for Davis-Besse Nuclear Power Station ML20237B1681998-07-31031 July 1998 Monthly Operating Rept for July 1998 for Davis-Besse Nuclear Power Station,Unit 1 ML20236U5011998-07-23023 July 1998 Special Rept:On 980624,Unit 1 Site Damaged by Tornado & High Winds.Alert Declared by DBNPS Staff,Dbnps Emergency Response Facilities Activiated & Special Insp Team Deployed to Site by Nrc,As Result of Event ML20236R1441998-07-15015 July 1998 SER Related to Quality Assurance Program Description Changes for Davis-Besse Nuclear Power Station,Unit 1 ML20236K3981998-06-30030 June 1998 SER Accepting in Part & Denying in Part Relief Requests from Some of ASME Section XI Requirements as Endorsed by 10CFR50.55a for Containment Insp for Davis-Besse Nuclear Power Station,Unit 1 ML20236N7451998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Davis-Besse Nuclear Power Station,Unit 1 ML20236K5131998-06-29029 June 1998 Safety Evaluation Accepting Proposed Alternate Emergency Operations Facility Location for Davis-Besse Nuclear Power Station,Unit 1 ML20248F7441998-05-31031 May 1998 Reactor Vessel Working Group,Response to RAI Regarding Reactor Pressure Vessel Integrity ML20249A4121998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Davis-Besse Nuclear Power Station,Unit 1 ML20196B5221998-05-23023 May 1998 10CFR50.59 Summary Rept of Facility Changes,Tests & Experiments Dbnps,Unit 1 for 960602-980523 ML20236E7581998-05-19019 May 1998 Rev 0 to Davis-Besse Unit 1 Cycle 12 Colr ML20248C4301998-05-0606 May 1998 Annual Rept, Covering Period 970507-980506 ML20236N7501998-04-30030 April 1998 Rev 2 to Monthly Operating Rept for Apr 1998 for Davis-Besse Nuclear Power Station,Unit ML20247F6721998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for Davis-Bess Nuclear Power Station,Unit 1 ML20249A4141998-04-30030 April 1998 Revised Monthly Operating Rept for Apr 1998 for Davis-Besse Nuclear Power Station,Unit 1 ML20217P8041998-04-0707 April 1998 11RFO OTSG ECT Insp Scope ML20216B4041998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Davis-Besse Nuclear Power Station,Unit 1 1999-09-30 |
Text
Retrieved from "https://kanterella.com/w/index.php?title=ML20062D617&oldid=3555310"