Discusses NRR Actions Taken Under Task Interface Agreement 82-20 for Steam Generator Auxiliary Feedwater Header Damage.Licensee Authorized to Resume Power Operation at Oconee 3
ML20027C424
Person / Time
Site: Davis Besse, Oconee, Rancho Seco, 05000000
Issue date: 10/06/1982
From: Eisenhut D
Office of Nuclear Reactor Regulation
To: Olshinski J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20027C425 List:
References
TAC-48349, NUDOCS 8210150519
Download: ML20027C424 (1)


Text

DCD-O/b DIST31B 10ft:

l

<GocTet I

ORB #4 Rd9 BCT 0 61982 Memo File DEisenhut Dockets fios. 50- 346, 312 & 287 11E!10RNIDU!! FOR: John Olshinski, Director, Division of Engineering and Technical Prograns, Region II FR0ll:

Darrell G. Eisenhut, Director, Division of Licensing, Office of Nuclear Reactor Regulation SUPJECT:

TIA 82-20, DAVIS-DESSE 1 RN1010 SECO & OC0!!EE 3 STEAM GEllERATOR AUXILIARY FEEDLIATER llEADER (ARill) DNtAGE References :

(1) lieno-J. Crews,(Reg. V) to D. Eisenhut, "flRC Lead Responsibility for AFWil Infomation; Rancho Seco".

April 20,1982 (2) Memo-R. Spessard (Reg. III) to D. Eisenhut, " Transfer of Responsibility Davis-Besse Steam Generator ARlit Damage", April 21,19M s

(3) Mem-J. Olshinski (Reg. II) to D. Eisenhut,

" Transfer of Responsibility of AFWil Danage at Oconee 3", dated itqy 14,1982.

References (1), (2) and (3) requested that flRR take the lead esponsibility for assessing the technical, safety, and generic aspects of toe damaged steam generators and subsequent repair program. The NRR Action Plan is identified in Task Interface Agreenent 82-20.

The Safety Evaluation Reports for the Davis-Besse and Rancho Seco plants were transnitted to Regions III and V by meno dated Septerter 2,1982.

We have determined that power operation at Oconee 3 can be resumed; however, reexamination of certain critical welds in the retired header systen at the next two refueling outages and the 10-year ISI is being requi red. This inspection requimment is now part of the licensee's ISI pmgram. Our letter to Duke Power Company dated Septenber 29, 1982 authorized the licensee to resume power operation of Oconee 3 based on the staff's safety evaluation of the steam generator repair. A copy of our Safety Evaluation Report for Oconee 3, dated Septenter 29,1982, is enclosed. This completes our planned activities on TIA 82-20.

s 4.j L

m Damil G. Eisenhut, Director 8210150519 821006 PDR ADOCK OS000287 Division of Licensing, ONRR P

PDR

Enclosure:

SER Dg)

(

DE' ut I

cc w/ enclosure:

lG/( /82 l

tiessaan, ADe Agazio, JStolz, _\\

..O_R.B.#.4 : D4LM.O. R.B...#.4 X..!.,}L.)

Ag.:.D..L..... j suRumc)

..N.ag,ne,rl. h...MR.hg q C-0RB#4 :DL TA:

3 Puagner, Glainas o,em,

AX.to... JS RWe saan..

. GLdtnas.......

.2/$/.02....... 942d82.......

.9/

/B2..

9/N.82..

../32....

onc>

NRC FORM 318 G10-00D NRCM 0240 OFFIClAL RECORD COPY ush e-mm