Letter Sequence Other |
|---|
|
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance...
Results
Other: B12630, Proposed Tech Specs,Adding New Surveillance Requirement Re Control Room Habitability, ML19241B419, ML19241B427, ML19254D272, ML19263C802, ML19310A426, ML19321A695, ML19330B754, ML19339A509, ML19339A598, ML19343A382, ML19345E132, ML19347C739, ML20049H553, ML20050C507, ML20052A948, ML20053D721, ML20066D300, ML20071G129
|
MONTHYEARML19256A1121978-10-27027 October 1978 Application for Amend to License DPR-35,changing Tech Specs to Accomodate New Steamline Break Protection Sys Scheduled for Installation in Spring of 1979.Fee Paid Project stage: Request ML20071G1291978-12-14014 December 1978 Forwards Addl Info Re Lic Amend Appl Covering Eval of Low Feedwater Flow Reactor Trip Setpoint Change Project stage: Other ML19263C8021979-02-0505 February 1979 Lists Individual Fee Classes for 781027 Application for Tech Spec Changes.Requests Submittal of Addl $13,500 Fee. Any Overcharges Will Be Refunded Project stage: Other ML19276E2751979-03-0707 March 1979 Forwards Addl Info Requested at 790223 Meeting Re Proposed Steam Break Protection Sys Project stage: Meeting ML19270F9971979-03-12012 March 1979 Summary of 790223 Meeting W/Westinghouse & Duquesne Light Re Steamline Break Protection Sys.W/Supporting Documentation Project stage: Meeting ML19241B4191979-07-13013 July 1979 Forwards Tech Spec Change Requests 42 & 47 Re Amend to App a of DPR-72.Change Is Required Prior to Startup After Completion of Planned ECCS Mod,Which Could Be Accomplished as Early as 790722 Project stage: Other ML19241B4271979-07-13013 July 1979 Tech Spec Change Requests 42 & 47 Re Mod to ECCS Project stage: Other ML19274G1021979-07-31031 July 1979 Forwards Request for Addl Info to Util Proposed Steam Break Protection Sys & N-1 Loop Operation Project stage: RAI ML19208B5691979-08-21021 August 1979 Forwards Safety Evaluation Re Electrical,Instrumentation & Control Aspects of Deletion of Reactor Trip on Turbine Trip Below 50% Power Project stage: Approval ML19254D2721979-10-18018 October 1979 Forwards Addl Info Re Proposed Steam Break Protection Sys Per Tech Spec Change Request 35.Proposed Tech Spec Re Maint of Required Shutdown Margin & Revised Reactivity Control Sys Tech Specs Encl Project stage: Other ML19259D6001979-10-18018 October 1979 Summary of 791009 Meeting W/Util Re Proposed Steamline Break Protection Project stage: Meeting IR 05000245/19790211979-10-30030 October 1979 IE Insp Repts 50-245/79-21 & 50-336/79-22 on 790804-0901.No Noncompliance Noted.Major Areas Inspected:Plant Tours, Physical Security,Exam of Feedwater Piping Per IE Bulletin 79-13,fire Protection & Surveillance Testing Project stage: Request ML19296B0471980-02-0808 February 1980 RCS Asymmetric Loads Evaluation Program;Interim Rept Project stage: Request ML19296B2941980-02-0808 February 1980 Submits Response to NRC 800201 Request for Addl Info Re Proposed long-term Emergency Operations Ctr,Required by NUREG-0578.Ctr Would Be Located 1.5 Miles from Plant. Preliminary Maps & Drawings Encl Project stage: Request ML19309A8581980-03-28028 March 1980 Forwards Documents Re Investigation Into Extended Outages at Facility.Documents Include Trial Staff Statement Before PA Public Util Commission,Consumer Advocate Statement & CN Dunn Testimony Project stage: Request ML19309B8431980-03-28028 March 1980 Submits Info Re Direct Indication of PORV & Safety Valve Positions.Recent Discussions W/Vendor Revealed Difficulty w/800401 Completion Date.Revised Date of Completion Is 810401 Project stage: Request ML19309H2151980-04-15015 April 1980 Notification of 800422 Meeting W/Util in Bethesda,Md to Discuss & Review Decay Heat Exchanger Sys Integrity & Operation Project stage: Request ML19323B1601980-04-16016 April 1980 Forwards NRC Position Re Emergency Response Facilities. Primary Technical Support Ctr That Does Not Meet Habitability Requirements Acceptable,Provided That Secondary Ctr,Meeting Requirements,Available Project stage: Meeting IR 05000302/19800181980-05-0707 May 1980 IE Insp Rept 50-302/80-18 on 800331-0411.No Noncompliance Noted.Major Areas Inspected:Previous Insp Findings,Fuel Receipt,Refueling Activities,Maint Activities & IE Bulletin 79-01B Project stage: Request IR 05000334/19800081980-05-0707 May 1980 IE Insp Rept 50-334/80-08 on 800324-28.No Noncompliance Noted.Major Areas Inspected:Qa Program Review,Qa/Qc Administrative Design Change & Mod Control,Measurement & Test & Previous Insp Items Project stage: Request ML19310A4261980-06-0909 June 1980 Responds to & Schedule for Implementation of TMI-2-related Requirements.Discusses Shift Manning,Scope & Criteria for Licensing Exam,Procedures for Feedback of Operating Experience & Control Room Habitability Project stage: Other A01024, Forwards Info Re Five Addl TMI-2 Related Requirements Applying to Operating Reactors Per 800507 Request.Integrated Assessment of Collective Impact of All Requirements Should Be Conducted1980-06-10010 June 1980 Forwards Info Re Five Addl TMI-2 Related Requirements Applying to Operating Reactors Per 800507 Request.Integrated Assessment of Collective Impact of All Requirements Should Be Conducted Project stage: Other IR 05000412/19800061980-07-0303 July 1980 IE Insp Rept 50-412/80-06 on 800602-06.Noncompliance Noted: Failure to Return Used or Damaged Welding Electrodes to Issue Station & Failure to Provide Adequate Protection for Equipment in Temporary Storage Project stage: Request ML19321A6951980-07-21021 July 1980 Forwards Schedule for Commitments to TMI-2 Related Requirements,Per NRC 800507 Request.Affidavit Encl Project stage: Other ML20041B0661980-07-22022 July 1980 Instructor Requalification Project stage: Other ML20041B0601980-07-23023 July 1980 To Licensed Reactor Operator Replacement Training Project stage: Other ML20041B0641980-07-23023 July 1980 To CT Yankee Reactor Operator Requalification Project stage: Other ML20041B0621980-07-23023 July 1980 To Licensed Senior Reactor Operator Replacement Training Project stage: Other ML19344E0751980-07-31031 July 1980 Operator Requalification Program Project stage: Other ML19330B7541980-07-31031 July 1980 Informs of Intentions to Withdraw Commitment to Adopt Guidance of IE Circular 80-02,due to Wording of IE Circular 80-02 & Application of Circular Re Work Situations Project stage: Other A00938, Forwards Haddam Neck Plant Reactor Operator Qualification & Requalification Programs & Millstone,Units 1 & 2,reactor Operator Qualification Program1980-08-15015 August 1980 Forwards Haddam Neck Plant Reactor Operator Qualification & Requalification Programs & Millstone,Units 1 & 2,reactor Operator Qualification Program Project stage: Other ML19344E0831980-08-31031 August 1980 Qualification of Reactor Operators Project stage: Other ML19344E0731980-08-31031 August 1980 Qualification of Reactor Operators Project stage: Other ML20041B0691980-08-31031 August 1980 Operator License Program Project stage: Other ML20041B0701980-08-31031 August 1980 Requalification Program for Licensed Operators Project stage: Other ML19343A3821980-09-15015 September 1980 Tech Specs 3/4 3-38,requesting Changes Re Model License Conditions,Emergency Feedwater Initiation & Flow Monitoring, Diverse Containment Isolation & Emergency Power Supply to Pressurizer Heaters Project stage: Other ML19343A3791980-09-15015 September 1980 Application to Amend App a to Ol,Changing Aspects of NUREG-0578 Including Model License Conditions & Emergency Feedwater Initiation & Flow Monitoring.Affidavit & Certificate of Svc Encl Project stage: Request ML19339A5091980-10-24024 October 1980 Withdraws Tech Specs Change Request 47,implementing Items Contained in NRC 790516 Confirmatory Order.Util Considers Specs Requested in Eisenhut & Provided in Change Request 64,Revision 1,as Representing Latest Position Project stage: Other ML19339A5981980-10-29029 October 1980 Advises of Status Re Shift Staffing,In Response to Interim Criteria in NRC Project stage: Other ML19339B2141980-10-31031 October 1980 Advises That Util Has Not Made Plans to Conduct Any Qualification Tests During Next 2 Yrs.Nrc Will Be Notified in Event of Decision to Conduct Tests Project stage: Request ML19345E1251980-12-15015 December 1980 Forwards Response to NUREG-0737 Re Implementation Status of TMI-related Requirements Project stage: Other ML19345E1321980-12-17017 December 1980 Responds to Re Confirmation of Commitment to Meet Implementation Dates Contained in NUREG-0737.Requests Extension for Proposed Mods Re Auto Trip of Reactor Coolant Pumps Project stage: Other ML19340E9211980-12-31031 December 1980 Forwards Rept on post-TMI Requirements in Response to NUREG-0737 & NRC Project stage: Other ML19347C7391980-12-31031 December 1980 Forwards Nonproprietary & Proprietary Versions of Response to NUREG-0737. Proprietary Version Available in Central Files Only Project stage: Other B10200, Comments on Draft NUREG-0659 Re Human Engineering Guide to Control Room Evaluation.Consideration Should Be Given to Lengthening 1-yr Review Process Due to Increased Workload on Operators Requirements Such as TMI Action Plan Items1981-04-16016 April 1981 Comments on Draft NUREG-0659 Re Human Engineering Guide to Control Room Evaluation.Consideration Should Be Given to Lengthening 1-yr Review Process Due to Increased Workload on Operators Requirements Such as TMI Action Plan Items Project stage: Draft Other ML20004D4141981-05-22022 May 1981 Forwards Response to IE Bulletin 81-03, Flow Blockage of Cooling Water to Safety Sys Components by Corbicula Sp (Asiatic Clam) & Mytilus Sp (Mussel). Mytilus Sp Is Salt Water Organism & Cannot Inhabit Freshwater Mo River Project stage: Other A01551, Provides Info & Appropriate Refs in Response to Generic Ltr 81-10 Re Emergency Response Facilities1981-06-0303 June 1981 Provides Info & Appropriate Refs in Response to Generic Ltr 81-10 Re Emergency Response Facilities Project stage: Other ML20010A6921981-08-0606 August 1981 Advises of Intended Licensing Exam Requests for Facilities for 1982.Advance Notice for NRC Support Considered Necessary Due to Limited Simulator Availability to Meet New Regulations Project stage: Other A01845, Forwards Info Re NRC Orders Confirming Licensee Commitments on post-TMI Related Issues.Issues Have Been Addressed.If NRC Does Not Allow Util to Reserve Request for Hearing,Ltr Should Be Treated as Hearing Request1981-08-10010 August 1981 Forwards Info Re NRC Orders Confirming Licensee Commitments on post-TMI Related Issues.Issues Have Been Addressed.If NRC Does Not Allow Util to Reserve Request for Hearing,Ltr Should Be Treated as Hearing Request Project stage: Request ML20031F8941981-10-14014 October 1981 Responds to NUREG-0737 Item II.K.3.5,automatic Reactor Coolant Pump Trip.Requirement for Installation of Automatic Trip Sys Is Neither Warranted Nor Desirable Project stage: Other 1980-04-15
[Table View] |
Text
,
l MAR 2 41992 DD h~k DISTRI UIT0N
. oc et FilD Local PDR ORB Rdg D.Eisenhut JHeltemes Docket Nos. 50-266 fK utzer-8 and 50-301 OELD NSIC f^'N ACRS.(10)[ [ - m. N I&E (1)
/,
Mr. C. W. Fay x
Assistant Vice President TColburn
/
Wisconsin Electric Power Company Gray Fil J 231 West Michigan Street Milwaukee, W1sconsin 53201 b
' l ISS2N I q.xngqm)
Dear Mr. Fay:
h..
' k.
/C-
~"
v;.
TNI ACTION PLAN ITEM II.K.3.3, REPORTING RELIEF VALVE (RV) AND, SAFETY RE:
VALVE (SV) FAILURES AND CHALLENGES.
M 'I We have reviewed your response dated March 31, 1981 to the above TMI Action Plan item for Point Beach Nuclear Plant Units 1 and 2.
You have committed to me.ating the reporting requirement provided in our May 7,1980 guidance letter including a report on RV and SV failures and challenges for the period April 1,1980 through December 31, 1980 and future reporting of RV and SV failures and challenges. No further review of this item by NRR is planned.
Because you have committed to meeting the above reporting requirements, we consider this item resolved for your facilities.
However, though your March 31, 1981 letter addressed this reporting requirement for 1980, this information was missing from your 1981 Annual Report for Point Beach Units 1 and 2.
As discussed by thelephone conversation with members of your staff, we consider this an oversight on your part. We request that you update your 1981 Annual Report for Point Beach Units 1 and 2 with an errata sheet to correct this discrepancy.
We also wish to formalize these reporting requirements; therefore, we will contact you in the future requesting that you incorporate the reporting requirements in your Technical Specifications.
Sincerely, Robert A. Clark, Chief r
l Operating Reactors Branch #3 Division of Licensing cc: See next page i
8204080577 820324 I
)L.;ARBQ.$
P PDR
.m%
.f..w p m.m
..!.w.3.es.r.ut.y.y.M6i.d......L
.~~ ~.
~..
.~
~ ~.. ~
.. - ~ ~........ ~.
~..............
RsM.
MP.........nua2.....
m nac ronu ais oo an uncu om OFFICIAL RECORD COPY usam mi-mm
UfRTED STAMs, '
y, s
t y,,4Lj)f,,r.
3'E NUCLEAR REGULATORY COMMISSION I
wAssinaTow, o. c.zosss f
Nf*****/
-ETRaosure 1 DocketNo('s).
Utility Address Dear Mr.
RE: TMI Action Plan' Item II.K.3.3, Repo'rting Relief Valve and. Safety Valve Failures and Challenges We have reviewed your response (s) dated
.to the above TMI Action Plan item.. You have committed to meeting the reporting requirements provided in our previous guidance including a report on relief va.1ve.(RV) and safety valve (SV) fa.iluies and challenges for the period 4/1/80 through 12/31/80 and future reporting of RV and SV failures and challenges. No further reyiek'of this item by NRR is planned.
Because you have committed to meeting the above reporting. requirements, we consider this item resolved for your facilities.
~
However, we wish to emalize these reporting requirements; therefore, we will contact you in tt,.
future requesting.that you administrative 1y incor-porate the reporting requirements in your Technical Specifications.
Sincerely, Chief Operating Reactors Branch f Division of Licensing
~
cc: See next page O
g 9
9
. s., enh e
e e
s Wisconsin Electric Power Company cc:
Mr. Bruce Churchill, Esquire Mr. William Guldemond Shaw, Pittman, Potts and Trowbridge USNRC Resident Inspectors Office 1800 M Street, N. W.
6612 Nuclear Road Washington, D. C.
20036 Two Rivers, Wisconsin 54241 Joseph Mann Library 1516 Sixteenth Street Two Rivers, Wisconsin 54241 Mr. Glenn A. Reed, Manager Nuclear Operations Wisconsin Electric Power Company Point Beach Nuclear Plant 6610 Nuclear Road.
Two Rivers, Wisconsin 54241 Mr. Gordon Blaha Town Chairman Town of Two Creeks Route 3 Two Rivers, Wisconsin 54241 Ms. Kathleen M. Falk General Counsel-Wisconsin's Environmental Decade 114 N. Carroll Street Madison, Wisconsin 53703 U. S. Environmental Protection Agency Federal Activities Branch Region V Office ATTN: Regional Radiation Representative 230 S. Dearborn Street i
Chicago, Illinois 60604 l
\\
l I
Chairman Public Service Commission of Wisconsin Hills Farms State Office Building Madison, Wisconsin 53702 Regional Admtnistrator l
Nuclear Regulatory Commission, Region III I
Office of Executive Director for Operations 799 Roosevelt Road Glen Ellyn, Illinois 60137 l
.