Other: A01024, Forwards Info Re Five Addl TMI-2 Related Requirements Applying to Operating Reactors Per 800507 Request.Integrated Assessment of Collective Impact of All Requirements Should Be Conducted, A02589, Forwards Addl Info Re safety-related ECCS Tank Outages, Provided Verbally on 821220 in Response to NUREG-0737, Item II.K.3.17, A03501, Requests Addl Time to Provide Info Re 6-inch Containment Purge & Vent Valve Operability.Info Will Be Provided by 831026, ML19340E921, ML20004B640, ML20008E564, ML20008F134, ML20054E184, ML20076A987, ML20078N847 | |
MONTHYEARML20076A9871979-04-27027 April 1979
[Table View]Forwards Proposed Revision to Tech Specs to Allow Unlimited Containment Purges.Revisions Deal W/Containment Isolation Valves Project stage: Other IR 05000245/19790211979-10-30030 October 1979 IE Insp Repts 50-245/79-21 & 50-336/79-22 on 790804-0901.No Noncompliance Noted.Major Areas Inspected:Plant Tours, Physical Security,Exam of Feedwater Piping Per IE Bulletin 79-13,fire Protection & Surveillance Testing Project stage: Request ML19296B0471980-02-0808 February 1980 RCS Asymmetric Loads Evaluation Program;Interim Rept Project stage: Request ML19296B2941980-02-0808 February 1980 Submits Response to NRC 800201 Request for Addl Info Re Proposed long-term Emergency Operations Ctr,Required by NUREG-0578.Ctr Would Be Located 1.5 Miles from Plant. Preliminary Maps & Drawings Encl Project stage: Request ML19309B8431980-03-28028 March 1980 Submits Info Re Direct Indication of PORV & Safety Valve Positions.Recent Discussions W/Vendor Revealed Difficulty w/800401 Completion Date.Revised Date of Completion Is 810401 Project stage: Request ML19323B1601980-04-16016 April 1980 Forwards NRC Position Re Emergency Response Facilities. Primary Technical Support Ctr That Does Not Meet Habitability Requirements Acceptable,Provided That Secondary Ctr,Meeting Requirements,Available Project stage: Meeting A01024, Forwards Info Re Five Addl TMI-2 Related Requirements Applying to Operating Reactors Per 800507 Request.Integrated Assessment of Collective Impact of All Requirements Should Be Conducted1980-06-10010 June 1980 Forwards Info Re Five Addl TMI-2 Related Requirements Applying to Operating Reactors Per 800507 Request.Integrated Assessment of Collective Impact of All Requirements Should Be Conducted Project stage: Other ML20041B0661980-07-22022 July 1980 Instructor Requalification Project stage: Other ML20041B0601980-07-23023 July 1980 To Licensed Reactor Operator Replacement Training Project stage: Other ML20041B0641980-07-23023 July 1980 To CT Yankee Reactor Operator Requalification Project stage: Other ML20041B0621980-07-23023 July 1980 To Licensed Senior Reactor Operator Replacement Training Project stage: Other ML19344E0751980-07-31031 July 1980 Operator Requalification Program Project stage: Other A00938, Forwards Haddam Neck Plant Reactor Operator Qualification & Requalification Programs & Millstone,Units 1 & 2,reactor Operator Qualification Program1980-08-15015 August 1980 Forwards Haddam Neck Plant Reactor Operator Qualification & Requalification Programs & Millstone,Units 1 & 2,reactor Operator Qualification Program Project stage: Other ML19344E0731980-08-31031 August 1980 Qualification of Reactor Operators Project stage: Other ML20041B0691980-08-31031 August 1980 Operator License Program Project stage: Other ML20041B0701980-08-31031 August 1980 Requalification Program for Licensed Operators Project stage: Other ML19344E0831980-08-31031 August 1980 Qualification of Reactor Operators Project stage: Other B10098, Provides Responses to Addl NRC Questions Re Design & Installation of RCS Vent Sys.Includes Description of Const, Location,Size & Power Supply for Vents.Solenoid Valves & Piping Sys Are Capable of Operating W/Water or Mixed Gases1980-10-0303 October 1980 Provides Responses to Addl NRC Questions Re Design & Installation of RCS Vent Sys.Includes Description of Const, Location,Size & Power Supply for Vents.Solenoid Valves & Piping Sys Are Capable of Operating W/Water or Mixed Gases Project stage: Other B10111, Forwards Implementation Status of TMI Action Plan.Items Which Cannot Be Implemented by 810101 Identified1980-10-31031 October 1980 Forwards Implementation Status of TMI Action Plan.Items Which Cannot Be Implemented by 810101 Identified Project stage: Other ML19345E1251980-12-15015 December 1980 Forwards Response to NUREG-0737 Re Implementation Status of TMI-related Requirements Project stage: Other ML19340E9211980-12-31031 December 1980 Forwards Rept on post-TMI Requirements in Response to NUREG-0737 & NRC Project stage: Other ML20008E5641981-02-27027 February 1981 Provides Justification for Min Containment Pressure Used to Initiate Containment Isolation for Facility,Per NRC 801231 Request Re NUREG-0737.Present Containment Isolation Setpoint Is Adequate & No Reduction in Setpoint Is Warranted Project stage: Other ML20008F1341981-03-0404 March 1981 Forwards ECCS Outage Rept for Facilities for 1980,in Response to NUREG-0737,Item II.K.3.17.No Sys or Tech Spec Mods Are Required Project stage: Other B10200, Comments on Draft NUREG-0659 Re Human Engineering Guide to Control Room Evaluation.Consideration Should Be Given to Lengthening 1-yr Review Process Due to Increased Workload on Operators Requirements Such as TMI Action Plan Items1981-04-16016 April 1981 Comments on Draft NUREG-0659 Re Human Engineering Guide to Control Room Evaluation.Consideration Should Be Given to Lengthening 1-yr Review Process Due to Increased Workload on Operators Requirements Such as TMI Action Plan Items Project stage: Draft Other ML20004B6401981-05-20020 May 1981 Advises That No Mods Will Be Made to TMI Action Plan Item II.E.4.2 Re Containment Isolation Dependability.Signals Used for Containment Isolation Are Redundant & Diverse & Adequate to Ensure Safe Operation Project stage: Other ML20004D4141981-05-22022 May 1981 Forwards Response to IE Bulletin 81-03, Flow Blockage of Cooling Water to Safety Sys Components by Corbicula Sp (Asiatic Clam) & Mytilus Sp (Mussel). Mytilus Sp Is Salt Water Organism & Cannot Inhabit Freshwater Mo River Project stage: Other A01551, Provides Info & Appropriate Refs in Response to Generic Ltr 81-10 Re Emergency Response Facilities1981-06-0303 June 1981 Provides Info & Appropriate Refs in Response to Generic Ltr 81-10 Re Emergency Response Facilities Project stage: Other ML20008G1281981-06-29029 June 1981 Provides Info Re RCS Vents Per NUREG-0737,Item II.B.1. Eighteen Aperture Cards Encl,One Illegible Drawing.Aperture Cards Are Available in PDR Project stage: Other ML20010A6921981-08-0606 August 1981 Advises of Intended Licensing Exam Requests for Facilities for 1982.Advance Notice for NRC Support Considered Necessary Due to Limited Simulator Availability to Meet New Regulations Project stage: Other A01845, Forwards Info Re NRC Orders Confirming Licensee Commitments on post-TMI Related Issues.Issues Have Been Addressed.If NRC Does Not Allow Util to Reserve Request for Hearing,Ltr Should Be Treated as Hearing Request1981-08-10010 August 1981 Forwards Info Re NRC Orders Confirming Licensee Commitments on post-TMI Related Issues.Issues Have Been Addressed.If NRC Does Not Allow Util to Reserve Request for Hearing,Ltr Should Be Treated as Hearing Request Project stage: Request ML20031F8941981-10-14014 October 1981 Responds to NUREG-0737 Item II.K.3.5,automatic Reactor Coolant Pump Trip.Requirement for Installation of Automatic Trip Sys Is Neither Warranted Nor Desirable Project stage: Other ML20031H1491981-10-20020 October 1981 Advises That Cable Supplied for Requirements of NUREG-0737 Item II.F.1.3, Containment High-Range Radiation Monitor, Is Not Fully Environmentally Qualified.Cable Will Be Replaced During Next Outage Project stage: Other ML20033D2301981-11-30030 November 1981 Notifies That Stack Monitoring Sys Will Be Modified to Accomodate Installation of High Range Noble Gas Effluent Monitor Per Item II.F.1 NUREG-0737 Requirement.Compliance W/Tech Specs During Installation Will Be Maintained Project stage: Other ML20049J1671982-03-0808 March 1982 Ack Receipt of 801231 Response to TMI Action Plan Item II.K.3.3, Reporting Relief Valve & Safety Valve Failures & Challenges. No Further Review Planned.Item Resolved Project stage: Other ML20050C5071982-03-24024 March 1982 Ack Commitment in to Meet Reporting Requirement Provided in NRC Re Relief & Safety Valve Failures.Info Missing from 1981 Annual Rept.Requests That Rept Be Updated W/Errata Sheet to Correct Discrepancy Project stage: Other ML20054E1841982-04-16016 April 1982 Forwards Responses to Generic Ltr 82-05 Re post-TMI Requirements Implementation.Continued Safe Operation Assured W/Existing Implementation Status Project stage: Other A02376, Responds to 820318 Request for Addl Info Required to Complete Review of NUREG-0737,Item I.A.1.2 Re Upgraded Senior Reactor Operator & Reactor Operator Training & Item II.B.4 Re Training for Mitigating Core Damage1982-05-10010 May 1982 Responds to 820318 Request for Addl Info Required to Complete Review of NUREG-0737,Item I.A.1.2 Re Upgraded Senior Reactor Operator & Reactor Operator Training & Item II.B.4 Re Training for Mitigating Core Damage Project stage: Request A02368, Forwards Addl Info Requested by NRC 820316 & 19 Ltrs Re TMI Action Item II.B.1, RCS Vents1982-06-0202 June 1982 Forwards Addl Info Requested by NRC 820316 & 19 Ltrs Re TMI Action Item II.B.1, RCS Vents Project stage: Other A02477, Forwards Response to Generic Ltr 82-10 Requesting Info Re Implementation Dates for Selected TMI Action Plan Items in NUREG-07371982-06-0404 June 1982 Forwards Response to Generic Ltr 82-10 Requesting Info Re Implementation Dates for Selected TMI Action Plan Items in NUREG-0737 Project stage: Other B10541, Notifies of Delay in Submittal of Head Vent Procedures Until 8209011982-07-30030 July 1982 Notifies of Delay in Submittal of Head Vent Procedures Until 820901 Project stage: Other ML20028E4271982-08-17017 August 1982 Improvements in Training & Requalification Programs as Required by TMI Action Items,I.A.2.1 & II.B.4, Technical Evaluation Rept Project stage: Other A02589, Forwards Addl Info Re safety-related ECCS Tank Outages, Provided Verbally on 821220 in Response to NUREG-0737, Item II.K.3.171982-12-29029 December 1982 Forwards Addl Info Re safety-related ECCS Tank Outages, Provided Verbally on 821220 in Response to NUREG-0737, Item II.K.3.17 Project stage: Other ML20076F2631983-03-0202 March 1983 Selected Operating Reactor Issues Program Ii:Rcs Vents (NUREG-0737,Item II.B.1), Final Technical Evaluation Rept Project stage: Other ML20214K5671983-04-19019 April 1983 Advises That Reporting Period Began on 800401 for All PWR Licensees Committed to Providing NRC Prompt Notification of Porv/Sv Failures & Periodic Repts.Project Managers Should Have Info Available in Records Project stage: Other ML20077B8541983-07-20020 July 1983 Operating Reactor PORV Repts (F-37) TMI Action Plan Requirements:Generic Rept - B&W Designed Units, Technical Evaluation Rept Project stage: Other A03501, Requests Addl Time to Provide Info Re 6-inch Containment Purge & Vent Valve Operability.Info Will Be Provided by 8310261983-10-12012 October 1983 Requests Addl Time to Provide Info Re 6-inch Containment Purge & Vent Valve Operability.Info Will Be Provided by 831026 Project stage: Other ML20078N8471983-10-27027 October 1983 Forwards Response to NRC 830902 Comments on Unresolved Items Re Containment Purge/Vent Review.No Addl Tech Specs or Equipment Mods Warranted.Operability Requirement Met W/Compliance W/Tmi Item II.E.4.2 Project stage: Other ML20244C8641984-02-16016 February 1984 Amends 95 & 92 to Licenses DPR-21 & DPR-65,respectively, Changing Tech Specs to Comply W/Final Rule on Licensed Operator Staffing Project stage: Other A03992, Requests Informal Appeal Meeting W/Nrc to Review Requested Mod of Hydrogen Purge Valves to Close on High Radiation Signal,Per Generic Ltr 84-08 & NUREG-0737,Item II.E.4.2.71984-05-15015 May 1984 Requests Informal Appeal Meeting W/Nrc to Review Requested Mod of Hydrogen Purge Valves to Close on High Radiation Signal,Per Generic Ltr 84-08 & NUREG-0737,Item II.E.4.2.7 Project stage: Meeting B11284, Advises That Due to Extended Outage in Late 1983,1984 Refueling Outage Will Not Occur.Next Scheduled Refueling Outage Will Occur in Feb 1985.All Mods Scheduled for Completion Prior to Startup Following 1985 Outage1984-08-0202 August 1984 Advises That Due to Extended Outage in Late 1983,1984 Refueling Outage Will Not Occur.Next Scheduled Refueling Outage Will Occur in Feb 1985.All Mods Scheduled for Completion Prior to Startup Following 1985 Outage Project stage: Other 1981-05-20 |
| ML19340E921 | |
| Person / Time | |
|---|---|
| Site: | Haddam Neck, Millstone File:Connecticut Yankee Atomic Power Co icon.png |
| Issue date: | 12/31/1980 |
| From: | Counsil W CONNECTICUT YANKEE ATOMIC POWER CO., NORTHEAST NUCLEAR ENERGY CO. |
| To: | Eisenhut D Office of Nuclear Reactor Regulation |
| References | |
| RTR-NUREG-0737, RTR-NUREG-737, TASK-1.A.1.1, TASK-1.A.2.1, TASK-2.B.4, TASK-2.E.1.1, TASK-2.F.1, TASK-2.K.3.02, TASK-2.K.3.03, TASK-2.K.3.12, TASK-2.K.3.17, TASK-3.D.3.4, TASK-TM AO1379, TAC-42588, TAC-44175, TAC-44385, TAC-44525, TAC-44665, TAC-44935, TAC-45006, TAC-45357, TAC-45643, TAC-46458, NUDOCS 8101160248 | |