ML20040G574

From kanterella
Jump to navigation Jump to search
Application for Amend to License NPF-7,requesting one-time Extension of Required Surveillance Interval for Hydraulic Snubber Functional Test.Testing Will Be Performed During Refueling Outage.Class III Fee Encl
ML20040G574
Person / Time
Site: North Anna Dominion icon.png
Issue date: 02/05/1982
From: Leasburg R
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To: Clark R, Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML20040G575 List:
References
055, 55, NUDOCS 8202160266
Download: ML20040G574 (2)


Text

__ __ _ _ - .

A 9  %

. s y RECGlygg 9 VINGINIA }$LECTHIC AND POWEH COMPANY ] [Q . .

Hicunown, Vinoxxtr 20261 C

If

% Nb7 O (C . Y q fy

.H.H.Luannemo , 4 Vaca Panasommt Necz.saa bemmarzons

!!r. Harold R. Denton, Director Serial No. 055 Office of Nuclear Reactor Regulation N0/JHL:acm Attn: Mr. Robert A. Clark, Chief Docket No. 50-339 Operating Reactors Branch No. 3 License No. NPF-7 Division of Licensing U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Centlemen:

AMENDMENT TO OPERATING LICENSE NPF-7 NORTH ANNA NWER STATION UNIT No. 2 PROPOSED OPERATING LICENSE MIENDMENT Pursuant to 10 CFR 50.90,_the Virginia Electric and Power Company requests an amendment to Operating License NPF-7 for North Anna Power Station, Unit No. 2.

This proposed license amendment requests a one-time extension of the required surveillance interval for the North Anna Unit 2 hydraulic snubber functional test. An extension will permit completion of the current operating cycle prior to performance of the snubber testing which will be performed during the refueling outage. The proposed amendment is enclosed in Attachment 1. A discussier. of the proposed change is provided in Attachment 2.

This request has been reviewed and approved by the Station Nuclear Safety and Operating Committee and the Safety Evaluation and Control staff. It has been determined that this request does not involve an unreviewed safety question as defined in 10 CFR 50.59.

We have evaluated this request in accordance with the criteria in 10 CFR 170.22. Since this request involves a safety issue which the Staff should be able to determine does not pose a significant hazard consideration for Unit 2, a Class III license amendment fee is required for Unit 2. Accordingly, a voucher check in the amount of $4000.00 is enclosed in payment of the required fees.

Very truly yours, R. . Leasburg Attachments:

1. Proposed Operating License Amendment
2. Discussion of Proposed Operating License Amendment
3. Voucher Check No. 7865 for $4000.00 cc: Mr. James P. O'Reilly, Director f \ h 8 D

Office of Inspection and Enforcement ,

Region II b,\g 8202160266 820205 PDR ADOCK '05000339 P PDR _

___ .. _ _ .. _ .._._. .. - - _ . _ _ . . _. _ . .. _ ._. w COMMONWEALTH OF VIRGINIA )

)

CITY OF RICHMOND )

The foregoing document was acknowledged before me, in and for the City and _

Commonwealth aforesaid, today by R. H. Leasburg, who is Vice President-Nuclear Operations, of the Virginia Electric and Power Company. He is duly authorized to execute and file the foregoing document in behalf of that Company, and the statements in the document are true to the best of his knowledge and belief.

Acknowledged before me this 5 day of M. , 19 2 A .

My Commission expires: 4 A4 , 19 Pi .

L G . 7n W Notary Public (SEAL) l l

l

. _ ,___ _ .-