3
/
JAn 2 51982 DISTRIBUTION Gray File Docket File NRC PDR s
L PDR g
Docket Nos. 50-266 NSIC p
and 50-301 TERA 9
s ORB #3 Rdg RECEIVED FEB1 1982> {
nhut Mr. Sol Burstein
{' YdE*d* yr' E.xecutive Vice President I&E-3 noc Wisconsin Electric Power Company ACRS-10 JHeltemes g
231 West Michigan Street Milwaukee, Wisconsin 53201 PMKreutzer-3 gg RAClark TCloburn
Dear Mr. Burstein:
KHerring In conducting our review of your July 16, 1981 response to NRC Generic Letter 81-14, Seismic Qualification of Auxiliary Feedwater Systems, we have determined that we will nedd the additional information identifled in the enclosure. This information has been discussed previously with trembers of your staff by telephone conversations on January 19, 20 and 21, 1982.
In order for us to maintain our review schedule, your response is requested by April 30, 1982. Please contact the Point Beach Project Manager if you have any questions concerning this request.
The reporting and/or recordkeeping requirements contained in this letter affect fewer than ten responder.ts; therefore, OMB clearance is not required under P.L.96-511.
Sincerely, orici,nt signed by anw; A. Clark Robert A. Clark, Chief Operating Reac6 ors Branch #3 Division of Licensing
Enclosure:
As stated cc: See next page l
0202160000 820125 PDR ADOCK 05000266 P
...... 3 k, [.
l ORQ#3:DL ORB omcr >
sunmun)
...TColburn..
-RAUlark.
~
l
..].l.h?f.k2..
...U.t%2...
ana>
Nac ronu sia cio-co nacu 02o OFFIClAL RECORD COPY usam m,_w
Wisconsin Electric Power Company cc:
Mr. Bruce Churchill, Esquire Mr. William Guldemond Shaw, Pittman, Potts and Trowbridge USNRC Resident Inspectors Office 1800 M Street, N. W.
6612 Nuclear Road Washington, D. C.
20036 Two Rivers, Wisconsin 54241 Joseph Mann Library 1516 Sixteenth Street Two Rivers, Wisconsin 54241 Mr. Glenn A. Reed, Manager Nuclear Operations Wisconsin Electric Power Company Point Beach Nuclear Plant 6610 Nuclear Road Two Rivers, Wisconsin 54241 Mr. Gordon Blaha Town Chairman Town of Two Creeks Route 3 Two Rivers, Wisconsin 54241 Ms. Kathleen M. Falk General Counsel Wisconsin's Environmental Decade 114 N. Carroll Street Madison, Wisconsin 53703 U. S. Environmental Protection Agency Federal Activities Branch Region V Office ATTN: Regional Radiation Representative 230 S. Dearborn Street Chicago, Illinois 60604 Chairman Public Service Commission of Wisconsin Hills Farms State Office Building Madison, k'isconsin 53702 Regional Administrator Nuclear Regulatory Commission, Region III Office of Inspection and Enforcement 799 Roosevelt Road Glen Ellyn, 1111 noir 60137
REQUEST FOR ADDITIONAL INFOR/1ATION ON SEISMIC QUALIFICATION OF THE AUXILIARY FEEDWATER SYSTEM POINT BEACH NUCLEAR PLANT UNITS 1 & 2 Question 1 to Generic Letter 81-14 identified the items and boundaries of the AFW system which were to be considered in responding to that letter.
a) Verify that all such considerations were applied to your evaluation and that all the indicated items and boundaries to assure system function are Seismic Category 1 and designed to resist the SSE specified for the plant.
b) Provide a schematic sketch of the AFW system from suction to discharge which indicates the seismic qualification of the boundaries and it+ms of the AFW system, as specified in EncicrJre 1 to Generic Letter 81-14.
c) Justify the acceptability of any deviations of the items and boundaries as described in the Generic Letter.
d) Since the condensate storage tanks were not designed to resist an SSE, summarized your procedures for transfer from this primary source to the SSE qualified secondary source, as requested in Generic Letter 81-14.
e) Provide the information requested in Generic Letter 81-14 for those items that were not addressed in your response.
Question 2 Provide the completion date for the~ modification of the piping supports identified under your IE Bulletin 79-14 review.