MONTHYEARML19270G8051979-05-15015 May 1979 Summary of 790511 Meeting W/Util in Bethesda,Md Re Auxiliary Feedwater Sys.List of Attendees & Matl Discussed Encl Project stage: Meeting ML20150F1621979-05-22022 May 1979 Submits Formal Responses to 790510 Questionnaire Re Pressurizer Heater,Loss of Feedwater Event & Steam Generator Project stage: Other ML19225C9181979-06-0404 June 1979 Requests Status of Lll Electrical Staff Overpressure & Flooding Reviews Project stage: Request ML19246C4101979-06-11011 June 1979 Forwards NRC to Westinghouse Requesting Addl Info Re Small Break LOCA Analyses & Analysis Methods.Nrc Will Eventually Require Documentation Re Applicability of Westinghouse Results to Analyses at Facility Project stage: Other ML19209A4201979-09-21021 September 1979 Forwards NRC Requirements for Auxiliary Feedwater Sys & Requests That Plant Designs & Procedures Be Evaluated Against Applicable Requirements to Determine Degree of Conformity Project stage: Other ML19290B7341979-10-29029 October 1979 Submits Partial Response to Re short-term & long-term Requirements for Auxiliary Feedwater Sys.Requests Extension Until 800131 for Remaining Requirements Project stage: Other ML19320D5181979-12-0707 December 1979 Seventy-Two Hour Test of Turbine-Driven Auxiliary Feed Pump Project stage: Other ML19256G2521979-12-17017 December 1979 Forwards Modified Response to Previous Commitment to Implement NUREG-0578.Util Will Provide Alarms in Addition to Existing Position Indication for Power Operated Relief Valves for Both Units Project stage: Other ML19256G1021979-12-17017 December 1979 Responds to NRC 791210 Request for Addl Info on TMI Lessons Learned Task Force Recommendations Re Auxiliary Feedwater Sys.Oversize Drawings Available in Central Files Project stage: Request ML19320D5261979-12-23023 December 1979 Seventy-Two Hour Test of Electrically-Driven Auxiliary Feed Pumps Project stage: Other ML19320D5231979-12-26026 December 1979 Seventy-Two Hour Test of Electrically-Driven Auxiliary Feed Pump Project stage: Other ML19320D5111979-12-28028 December 1979 Seventy-Two Hour Test of Turbine-Driven Auxiliary Feed Pump Project stage: Other ML19257C5411980-01-22022 January 1980 Forwards Small Break LOCA Operator Guidelines.Min RCS Subcooling Margin Set at 36 F Prior to Terminating Safety Injection Project stage: Other ML19260D8281980-02-0404 February 1980 Responds to NRC 790921 Request for Evaluation of Requirements for Auxiliary Feedwater Sys & Associated Schedule & Commitment for Implementation of Required Changes & Actions Project stage: Request ML19316A7831980-05-16016 May 1980 Forwards Request for Addl Responses to NRC Long & short-term Recommendations Re Auxiliary Feedwater Sys.Open Items Must Be Resolved Acceptably Before Safety Evaluation Can Be Issued.Responses Needed within 45 Days Project stage: Approval ML19320D4771980-07-0808 July 1980 Forwards Revised Tech Spec 15.3.4 for Steam & Power Conversion Sys & Four 72-h Test Repts for Auxiliary Feed Pump in Response to NRC 800516 Request for Addl Info Re Auxiliary Feedwater Sys Project stage: Request ML19320D5021980-07-0808 July 1980 Revised Tech Spec 15.3.4 for Steam & Power Conversion Sys Project stage: Other ML19350D3491981-04-0909 April 1981 Responds to 810127 Request for Response to Unresolved Items Identified in Safety Evaluation for Auxiliary Feedwater Sys, Including short-term Recommendation GS-1 Re Tech Specs & Recommendation Re Redundant Level Indications Project stage: Request ML20009C7371981-07-16016 July 1981 Forwards Response to Generic Ltr 81-14 Re Seismic Qualification of Auxiliary Feedwater Sys.Sys Is Adequately Protected for Seismic Event Project stage: Other ML20040G4761982-01-25025 January 1982 Forwards Request for Addl Info Re Response to Generic Ltr 81-14, Seismic Qualification of Auxiliary Feedwater Sys Project stage: RAI ML20041G4231982-03-16016 March 1982 Submits Synopsis of Items Discussed During 820302 Telcon Re Automatic Initiation Features of Auxiliary Feedwater Sys Project stage: Other ML20052F2161982-05-0404 May 1982 Forwards Addl Response to Generic Ltr 81-14, Seismic Qualification of Auxiliary Feedwater Sys. Major Mechanical Components Seismically Qualified Except Condensate Storage Tanks Project stage: Other ML20028A7531982-11-12012 November 1982 Requests Encl Contractor Technical Evaluation Rept Re Seismic Qualification of Auxiliary Feedwater Sys Be Reviewed & Comments Provided by 821220 Project stage: Other ML20067D6311982-12-15015 December 1982 Comments on Technical Evaluation Rept Re Seismic Qualification of Auxiliary Feedwater Sys,Per 821112 Request. Recommendation to Acquire Complete SSE Level of Seismic Capacity Constitutes Unnecessary & Expensive Backfit Project stage: Other ML20064L8991983-02-11011 February 1983 Advises That Installation of Addl Supports for Auxiliary Feedwater Sys Piping & Components Rescheduled to June 1983, Due to Conflicts W/Other Plant Mods Project stage: Other ML20080B5531984-01-31031 January 1984 Provides Addl Info Re Status of Auxiliary Feedwater Sys Mods Implemented in Response to Generic Ltr 81-14.Last Remaining Mod Involves Replacement of Battery Rack Support Straps & Should Be Completed by Oct 1984 Project stage: Other ML20091J8581984-05-23023 May 1984 Emergency Operating Procedure Validation Procedure Project stage: Other ML20100J0891984-12-0404 December 1984 Provides Final Responses to Generic Ltr 81-14, Seismic Qualification of Auxiliary Feedwater Sys. Support Straps on Battery Racks Replaced as Scheduled in Project stage: Other ML20116D2981985-04-22022 April 1985 Notifies That Installation of Low Suction Pressure Automatic Trips on Auxiliary Feedwater Pumps Expected to Be Completed by 860131,in Response to NRC Request for Commitment Date Project stage: Request ML20206S7491986-05-31031 May 1986 Evaluation of Structural Aspects Re Point Beach Plant Project stage: Other ML20206S6861986-09-16016 September 1986 Forwards Safety Evaluation & Technical Evaluation Rept on Util 850426 Response to Open Items Re Generic Ltr 81-14, Seismic Qualification of Auxiliary Feedwater Sys. Addl Info Requested Re Diesel Generator Room Flooding Project stage: Approval ML20206S7091986-09-16016 September 1986 Safety Evaluation on Util 850426 Response to Open Items Re Generic Ltr 81-14, Seismic Qualification of Auxiliary Feedwater Sys (Afws). Reasonable Assurance Exists That Afws Will Perform Required Safety Function Following SSE Project stage: Approval ML20215N8401986-10-31031 October 1986 Advises of Features & Mods to Diesel Generator Room Air Exhaust Duct Louvers & Diesel Generator Voltage Regulator Cabinets in Response to Concerns Expressed in 860916 Safety Evaluation Re Util Compliance W/Generic Ltr 81-14 Project stage: Other ML20209H2971987-01-21021 January 1987 Advises That Mods to Protect Diesel Generator Voltage Regulator Cabinets from Fire Protection Sprinkler Operation Adequately Address NRC Concerns Identified in 860916 Safety Evaluation,Per Util Project stage: Approval 1981-04-09
[Table View] |
Text
-
3
/
JAn 2 51982 DISTRIBUTION Gray File Docket File NRC PDR s
L PDR g
Docket Nos. 50-266 NSIC p
and 50-301 TERA 9
s ORB #3 Rdg RECEIVED FEB1 1982> {
nhut Mr. Sol Burstein
{' YdE*d* yr' E.xecutive Vice President I&E-3 noc Wisconsin Electric Power Company ACRS-10 JHeltemes g
231 West Michigan Street Milwaukee, Wisconsin 53201 PMKreutzer-3 gg RAClark TCloburn
Dear Mr. Burstein:
KHerring In conducting our review of your July 16, 1981 response to NRC Generic Letter 81-14, Seismic Qualification of Auxiliary Feedwater Systems, we have determined that we will nedd the additional information identifled in the enclosure. This information has been discussed previously with trembers of your staff by telephone conversations on January 19, 20 and 21, 1982.
In order for us to maintain our review schedule, your response is requested by April 30, 1982. Please contact the Point Beach Project Manager if you have any questions concerning this request.
The reporting and/or recordkeeping requirements contained in this letter affect fewer than ten responder.ts; therefore, OMB clearance is not required under P.L.96-511.
Sincerely, orici,nt signed by anw; A. Clark Robert A. Clark, Chief Operating Reac6 ors Branch #3 Division of Licensing
Enclosure:
As stated cc: See next page l
0202160000 820125 PDR ADOCK 05000266 P
PDR
...... 3 k, [.
l ORQ#3:DL ORB omcr >
sunmun)
...TColburn..
-RAUlark.
~
l
..].l.h?f.k2..
...U.t%2...
ana>
Nac ronu sia cio-co nacu 02o OFFIClAL RECORD COPY usam m,_w
Wisconsin Electric Power Company cc:
Mr. Bruce Churchill, Esquire Mr. William Guldemond Shaw, Pittman, Potts and Trowbridge USNRC Resident Inspectors Office 1800 M Street, N. W.
6612 Nuclear Road Washington, D. C.
20036 Two Rivers, Wisconsin 54241 Joseph Mann Library 1516 Sixteenth Street Two Rivers, Wisconsin 54241 Mr. Glenn A. Reed, Manager Nuclear Operations Wisconsin Electric Power Company Point Beach Nuclear Plant 6610 Nuclear Road Two Rivers, Wisconsin 54241 Mr. Gordon Blaha Town Chairman Town of Two Creeks Route 3 Two Rivers, Wisconsin 54241 Ms. Kathleen M. Falk General Counsel Wisconsin's Environmental Decade 114 N. Carroll Street Madison, Wisconsin 53703 U. S. Environmental Protection Agency Federal Activities Branch Region V Office ATTN: Regional Radiation Representative 230 S. Dearborn Street Chicago, Illinois 60604 Chairman Public Service Commission of Wisconsin Hills Farms State Office Building Madison, k'isconsin 53702 Regional Administrator Nuclear Regulatory Commission, Region III Office of Inspection and Enforcement 799 Roosevelt Road Glen Ellyn, 1111 noir 60137
REQUEST FOR ADDITIONAL INFOR/1ATION ON SEISMIC QUALIFICATION OF THE AUXILIARY FEEDWATER SYSTEM POINT BEACH NUCLEAR PLANT UNITS 1 & 2 Question 1 to Generic Letter 81-14 identified the items and boundaries of the AFW system which were to be considered in responding to that letter.
a) Verify that all such considerations were applied to your evaluation and that all the indicated items and boundaries to assure system function are Seismic Category 1 and designed to resist the SSE specified for the plant.
b) Provide a schematic sketch of the AFW system from suction to discharge which indicates the seismic qualification of the boundaries and it+ms of the AFW system, as specified in EncicrJre 1 to Generic Letter 81-14.
c) Justify the acceptability of any deviations of the items and boundaries as described in the Generic Letter.
d) Since the condensate storage tanks were not designed to resist an SSE, summarized your procedures for transfer from this primary source to the SSE qualified secondary source, as requested in Generic Letter 81-14.
e) Provide the information requested in Generic Letter 81-14 for those items that were not addressed in your response.
Question 2 Provide the completion date for the~ modification of the piping supports identified under your IE Bulletin 79-14 review.