Letter Sequence Request |
|---|
|
Results
Other: ML19209A420, ML19246C410, ML19256G252, ML19257C541, ML19290B734, ML19320D502, ML19320D511, ML19320D518, ML19320D523, ML19320D526, ML20041G423, ML20052C092, ML20054K847, ML20054K849, ML20062G684, ML20062G693, ML20064L899, ML20082A625, ML20150F162
|
MONTHYEARML19270G8051979-05-15015 May 1979 Summary of 790511 Meeting W/Util in Bethesda,Md Re Auxiliary Feedwater Sys.List of Attendees & Matl Discussed Encl Project stage: Meeting ML20150F1621979-05-22022 May 1979 Submits Formal Responses to 790510 Questionnaire Re Pressurizer Heater,Loss of Feedwater Event & Steam Generator Project stage: Other ML19225C9181979-06-0404 June 1979 Requests Status of Lll Electrical Staff Overpressure & Flooding Reviews Project stage: Request ML19246C4101979-06-11011 June 1979 Forwards NRC to Westinghouse Requesting Addl Info Re Small Break LOCA Analyses & Analysis Methods.Nrc Will Eventually Require Documentation Re Applicability of Westinghouse Results to Analyses at Facility Project stage: Other ML19209A4201979-09-21021 September 1979 Forwards NRC Requirements for Auxiliary Feedwater Sys & Requests That Plant Designs & Procedures Be Evaluated Against Applicable Requirements to Determine Degree of Conformity Project stage: Other ML19259D6551979-10-20020 October 1979 Forwards Response to NRC Requesting Commitments to Implement NUREG-0578 Recommendations.Design Differences Decrease Chance of TMI-type Accident Project stage: Request ML19290B7341979-10-29029 October 1979 Submits Partial Response to Re short-term & long-term Requirements for Auxiliary Feedwater Sys.Requests Extension Until 800131 for Remaining Requirements Project stage: Other ML19320D5181979-12-0707 December 1979 Seventy-Two Hour Test of Turbine-Driven Auxiliary Feed Pump Project stage: Other ML19256G1021979-12-17017 December 1979 Responds to NRC 791210 Request for Addl Info on TMI Lessons Learned Task Force Recommendations Re Auxiliary Feedwater Sys.Oversize Drawings Available in Central Files Project stage: Request ML19256G2521979-12-17017 December 1979 Forwards Modified Response to Previous Commitment to Implement NUREG-0578.Util Will Provide Alarms in Addition to Existing Position Indication for Power Operated Relief Valves for Both Units Project stage: Other ML19320D5261979-12-23023 December 1979 Seventy-Two Hour Test of Electrically-Driven Auxiliary Feed Pumps Project stage: Other ML19320D5231979-12-26026 December 1979 Seventy-Two Hour Test of Electrically-Driven Auxiliary Feed Pump Project stage: Other ML19320D5111979-12-28028 December 1979 Seventy-Two Hour Test of Turbine-Driven Auxiliary Feed Pump Project stage: Other ML19257C5411980-01-22022 January 1980 Forwards Small Break LOCA Operator Guidelines.Min RCS Subcooling Margin Set at 36 F Prior to Terminating Safety Injection Project stage: Other ML19260D8281980-02-0404 February 1980 Responds to NRC 790921 Request for Evaluation of Requirements for Auxiliary Feedwater Sys & Associated Schedule & Commitment for Implementation of Required Changes & Actions Project stage: Request ML19316A7831980-05-16016 May 1980 Forwards Request for Addl Responses to NRC Long & short-term Recommendations Re Auxiliary Feedwater Sys.Open Items Must Be Resolved Acceptably Before Safety Evaluation Can Be Issued.Responses Needed within 45 Days Project stage: Approval ML19320D5021980-07-0808 July 1980 Revised Tech Spec 15.3.4 for Steam & Power Conversion Sys Project stage: Other ML19320D4771980-07-0808 July 1980 Forwards Revised Tech Spec 15.3.4 for Steam & Power Conversion Sys & Four 72-h Test Repts for Auxiliary Feed Pump in Response to NRC 800516 Request for Addl Info Re Auxiliary Feedwater Sys Project stage: Request ML19350D3491981-04-0909 April 1981 Responds to 810127 Request for Response to Unresolved Items Identified in Safety Evaluation for Auxiliary Feedwater Sys, Including short-term Recommendation GS-1 Re Tech Specs & Recommendation Re Redundant Level Indications Project stage: Request ML20041G4231982-03-16016 March 1982 Submits Synopsis of Items Discussed During 820302 Telcon Re Automatic Initiation Features of Auxiliary Feedwater Sys Project stage: Other ML20052C0921982-04-27027 April 1982 Tech Spec Change Request 76 Consisting of Tech Spec Pages 15.3.4-1,-2 & -2.a Re Auxiliary Feedwater Pump Project stage: Other ML20052C0861982-04-27027 April 1982 Application for Amend to Licenses DPR-24 & DPR-27,consisting of Tech Spec Change Request 76.Amend Would Incorporate NRC Changes to Limit Unavailability of Auxiliary Feedwater Pumps Project stage: Request ML20054K8491982-06-30030 June 1982 Proposed Tech Spec Changes Re Periodic Testing of Auxiliary Feedwater Sys Automatic Actuation Logic Project stage: Other ML20054K8471982-06-30030 June 1982 Forwards Revision to Tech Spec Table 15.4.1-1 Re Periodic Testing of Auxiliary Feedwater Sys Automatic Actuation Logic.Nrc Review of Tech Spec Change Request 76 Should Include Addl Change Project stage: Other ML20062G6931982-07-27027 July 1982 Notice of Issuance & Availability of Amends 62 & 67 to Licenses DPR-24 & DPR-27,respectively Project stage: Other ML20062G6841982-07-27027 July 1982 Amends 62 & 67 to Licenses DPR-24 & DPR-27,respectively, Changing Tech Specs to Modify Limiting Conditions for Operation Re Auxiliary Feedwater Pump Operation Project stage: Other ML20064L8991983-02-11011 February 1983 Advises That Installation of Addl Supports for Auxiliary Feedwater Sys Piping & Components Rescheduled to June 1983, Due to Conflicts W/Other Plant Mods Project stage: Other ML20082A6251983-11-11011 November 1983 Advises That Auxiliary Feedwater Sys Operability Mods Completed Per Tech Spec Revs Proposed in 820427,0505 & 0630 Ltrs Project stage: Other 1979-09-21
[Table View] |
Requests Status of Lll Electrical Staff Overpressure & Flooding Reviews| ML19225C918 |
| Person / Time |
|---|
| Site: |
Millstone, Hatch, Salem, Palisades, Indian Point, Point Beach, Turkey Point, Haddam Neck, Robinson File:Connecticut Yankee Atomic Power Co icon.png |
|---|
| Issue date: |
06/04/1979 |
|---|
| From: |
Eisenhut D Office of Nuclear Reactor Regulation |
|---|
| To: |
Shemanski P Office of Nuclear Reactor Regulation |
|---|
| Shared Package |
|---|
| ML19225C907 |
List: |
|---|
| References |
|---|
| TASK-02-03.A, TASK-02-03.B, TASK-02-03.B1, TASK-03-03.A, TASK-03-03.B, TASK-2-3.A, TASK-2-3.B1, TASK-RR NUDOCS 7908030256 |
| Download: ML19225C918 (1) |
|
Text
.
w 9
Date ROUTING AND TRANSMITTAL SUP 6/4/79 Inttists Date Tol (Name. omc6 symbol, room number, busic.ng, Agency /7 cst) 2.
"' ~~
P. Shemanski 6 2
- n.,#
(f e-1 A.
W 5.
Action 1
File
(
INote and Return Y
Per Conversation Moreval For Cleartnce j
~
As Requested For Correction G/
Prepare Reply For Your Informat[on' see Ma
, _ Circuwte i
jomment I investigate S!gnature tardination l Justify REMARKS 3
This report says that in FY-78, L electrical staff completed 5 overpressure reviews and three " Flooding" reviews.
Cf these 8, are they all out the door as finisned products? (If not, why not?)
Thanks D. G. Eisenhut DO NOT L s this f rm as a RECORD of approvafs, concurrences, disposals, clearances, and simsfar actions Room No.-8'cg.
FTtOM:(Name, org symbol. Agency / Post) 629 D. G. Eisenhut, DOR:DD, NRR l [I$2Y CPT!oNAL FORM 41 (Rev. 7-76)
W 1-102 emeno.o oy csA FPMR (41 C7Rj l01 113 s-o.:ct-647 3354
403 i3')
I b
wos oso 2K