Text
--
.O
\\J i
UNITED STATES NUCLEAR REGULATORY COMMISSION 0FFICE'0F NUCLEAR REACTOR REGULATION I ~
~
REPORT ON THE SYSTEMATIC EVALUATION OF OPERATING FACILITIES I.
IN1RODUCTION j
The Office of Nuclear Reactor Regulation (NRR) has initiated a program for the-systenatic evaluation of operating nuclear power i
f acil i ties.
The program, called the Systematic Evaluation Program (SEP), has the following objectives:
1.
Reassess the safety nargins of the design and operation of selected older operating nuclear power plants.
2.
Establish documentation wnich shows how each operating plant reviewed in the SEP compares with current criteria on significant safety considerations, and which provides a basis for acceptance of any departures from these criteria.
3.
Provide the capability to make integrated and balanced decisions with respect to any reouired safety improvements.
4.
Identify and resolve significant safety deficiencies early in the SEP, if such deficiencies exist.
5.
Efficiently use available personnel and ninimize NRC and licensee resource requirements to perform the SEP.
l ucv v n 800gygg
)
.~-
o; n
~
. Phase 1 of the ~ program consisted of developing the process for systematic evaluation of certain older operating reactors and of _ establishing the-resource needs and schedules.
Phase II consists of reviewing, within a period of three years,-eleven older operating reactors.
These reactors p
l-consist of the eight oldest facilities (excluding Indian Point 1 and Humboldt Bay) and the remaining facilities having provisional operating licenses (POLS), which will be converted to full tenn licenses (Fils) by this program. Another facility, Monticello Nuclear Generating Plant, has a provisional operating license but has been excluded from Phase 11 of the SEP because the staff evaluation and ACRS review of the Monticello POL-FTL conversion has been completed. Certain matters related to this licensing action are still pending Defore the hearing board; however, they are expected to be resolved in the near future, s;hich will permit converting this POL to a FTL.
The results of the SEP review will provide i
an adequate safety basis for making a decision regarding granting a FTL.
Therefore, conversion of the remaining POLS will be an acjunct to the SEP.
I The eleven reactors to be reviewed curing Phase II of SEP are listed in.
Following completion of this three-year program, the NRC will evaluate the appropriateness of whether the program shouic De 1
extended to other operating reactor facilities.
i
- 11. BACKGROUND The need for a more routine systematic evaluation of operating facilities in the light of current knowledge and licensing practices has bce-i 4
i
(
f
~
~
r i
-l3-i i
i recognized for some time. On May 3,1976, the Director. Division pf Operating Reactors, established a Task Force to'develcp a program ~ plan for-(l) evaluating = licensed nuclear power plants against current i
criteria,'and (2) developing a framework from which backfitting I
decisions can be evaluated considering all plant' features relating lt to safety. -The Task Force was composed of representatives with a broad spectrum of technical backgrounds.
Representatives fron other, NRC Office and NRR Divisions participated in the Task Force effort and provided valuable input.
The Task Force concluded that a systematic evaluation program is needed -
and recommended a concept for reviewing operating reactors.
They also recommended that the staff take steps to limit the potential number of facilities that need systematic review and eliminate the need for future systematic evaluations. To implement these recommendations, NRR management initiated measures to assure that deviations from licensina requirements and their basis for acceptance he documented in future operating license reviews.
In addition, all new licensing requirenents, which are identified by the Regulatory Requirements Review Comnittee, (RRRC) to be applicable to operating f acilities are being assessed for each of-these facilities and the conclusions docunented as new require-ments are adopted. These two actions will insure that in the fdture operating plants will have a record of the results of the staff review of all safety issues and that the record will be continuously updated as new issues are identified by the staff.
t
x~.
7
.4_
y
-In January 1977,' the Commissiori approved the objectives and general approach of the proposed Systematic Evaluation Program.
In approving Phase-I of the program, the' Commission requested the staff to provide additional information regarding 'the scope of review and resource requiremerts prior to initiating any plant-specific review efforts.
In March 1977 a Systematic Evaluation Program (SEP) Review Group was established in the Division of Operating Reactors to inplement Phase I of the program as approved by the Commissionl/.
The Group reports to the Assistant Director for Operational Technology and consists of seven full-time NRR professionals, one I&E professional, a Group Leader and a Secretary. The followir; activities associated with Phase I of the SEP have been completed:
1.
A comprehensive List of SEP Topics of safety significance (hereafter referred to as the " Topic List") has been developed for use in the systematic evaluation of operating reactor f acilities. The develepaent of the Topic List involved an evolutionary process, starting with all known topics of safety concern. Topics in various general categories which did not need to be considered in the SEP were deleted.
The resulting final Topic List is provided as Attachnent 2.
~1/ Memorandum from Samuel Chilk to Lee V. Gossick (SECY 76-545),
" Commission Guidance on NRR Systematic Evaluation Program for Operating Reactors" (Policy Session Item), January 27, 1977.
i l
. o..
- C.
- 5' -
i 2.
Definitions.for each of the' items on the Topic List, includina a statendnt of.the safety' substance, and a discussion of the states of any. ongoing work related to the topic have been prepared.
'3.
A process.for conducting plant-specific reviews including general i
criteria for deternining desian acceptability has been developed.
4.
Resource requirements and associated schedules for inplementing
~
SEP have been reassessed.
5.
The' impact of the SEP on other NRR programs and on other flRC Of fices has been evaluated.
The results of the Phase I effort were presented to the Commission on
=
November 9, 1977.
The Connission approved the program as presented and directed that Phase. II, the review of eleven operating reactors, be initiated innediately.
III.
PRCGRAM The Systematic Evaluation Program is based on a listing of specific areas to be exanined (Topic List) and on an inteorated review of the overall ability of a plant to respond to certain design basis events (challenges), including normal operation, transients and
o costulated accidents.
The review procedure will result in a reassessment of the overall safety margins at each facility ano documentation of the reassessment on the basis of current criteria, t
A.
Tyoe of Topics The Topic List can be considered to consist of three types of topics. The first type consists of design basis-. events, i.e.,
[
transients, accidents and' natural phenomena, which the plant-should be able to withstand without exceeding specified acceotance criteria.
Examples of such design basis events are turbine trip, failures of high energy piping lines, fires, seismic events, and l
floods. The second type consists of identified potential failure mechanisms within safety-related systems (e.g., steam generator integrity). The third tyoe is associated with activities to limit the likelihood of failure in safety-related systems (e.g., equipnent to monitor the condition of D.C. power system supplies).
The Topic List ( Attachment 2) was generated in several steps.
First, a listing of all known and previously identified safety considerations was compiled.
This included generic issues (e.g., water hammer, fire protection), and other known safety
. topics (e.g., overpressurization protection). Various NRC Offices l
1
, and Divisions were requested to identify any additional safety considerations and to suggest other review topics for inclusion in the Topic List.
(The Int'oduction to the Topic List in r
f identifies the source of the topics and discusses the evolution of the List). More than 800 topics were considered in the development of the original list, which was created by the simple addition of all listings.
This process, of course, led us to identify many items that were duplicative in nature and, con-sequently, omi tted.
As a second step in developing a " Topic List", topics not normally included in the review of light water reactors and topics either related to research and development programs or to the development of analytical evaluation rodels and methodology wcrc categoricall;.
deleted.
Next, both those topics which are being reviewed on a periodic basis in accordance with current criteria (e.g., fuel performance) and those technical subjects that previously have been reviewed and implemented on operating reactors (e.g., BllR Channel Box Integrity) were also categorically celeted.
These grcups of topics were deleted because current NRR practices alreacy aperceriately address such issues, and tney have been appropriately considered for operating f acilities.
The remaining topics were arranged in groups corresponding to t' <
outline of the NRR Standarc Review Plan (SRP).
" Titles" from ter cro
.cere used es headings in t"e Tepic Lis' for
'F.
ry
~
l 0-
.8'..
.the Ltcpics into the format of the SRP;.however, all tities themselves do n6t necessarily represent topics for consideration.
. Following this structuring of topics, a " definition" was prepared-for each' topic-to ensure a common understanding. This " definition" F-I included a statement of the_ safety objective and the current status
[
'of the review topic.
The listing so generated was termed the " Topic List".
The final Topic List has been reviewed by all Divisions of NRR anc by -
the NRC Offices of I&E, SD, RES, and ELD. The Topic List thus developed i
includes general topics identified by D0R staff members.for a systematic evaluation, specific safety considerations not previously consicered j-ceneric issues, and previcusly identified generic issues from AC :S cc 1
other NRR generic issue lists.
These previously identified generic i,ssues are either under investigation, but only resolved on an interim basi:
l (e.g., pressure-suppression BWR containment integrity), or are cefined as generic issues but presently not being actively investigated for operatinc facilities (e.g., control room habitability).
i Some of the generic topics are the subject of ongoing programs arc t
l will De resolved and iralemented independently of SEP activities i.e..
resolution of these issues will not be accomplished as part 'of the SEP
]
effort. However, for the plants which are part of the SEP effort, l
the ultimate conclusions of facility reviews for ongoing generic concerns and of the SEP will be closely integrated, where practictule.
4 i
~.
._.9 I
l into an overall NRC-position to improve the effective ~ ness and j
efficiency of these efforts and to minimize any impact on licensees.
1 l
In addition, the status and conclusions of all generic issues will l
be molded into the final safety assessment for each plant.
~
When the Topic List is' applied to a specific plant, additional topics will be deleted because (a) certain topics apply only to a specific reactor type (e.g., BWR or PWR) or design feature (e.g., ice condenser containment-for PWRs) and (b) some topics have been previously resolved for a specific plant (e.g., Overhead Handling Systems - Cranes).
B.
Safety Significance of Topics The original Task Force expected that a large number of topics coulc be deleted generically, for all reacto-s on the basis of
" lesser safety significance".
The SEP Group init1311y identified some topics of " lesser safety significance" for all operating plants; however, it became apparent that the safety significance of many topics is plant dependent and only a few topics could be categorically deleted from the Topic List on this basis.
Early in the plant specific reviews of Phase II, the topics will be evaluated for safety significance to that plant.
Curing this chase it is expected that additional topics will be deleted on the basis of
" lesser safety significance".
Af ter a few plant reviews have been initiated, it may also be found that more topics can be categorically deleted from the generic Topic List on the basis of " lesser safety ric icince".
)
I I
~
L i
The " lesser safety significance" will be evaluated on the basis l
of the probability of occurrence of a given event and the magniturie of the radiological consequences of such an event should it occur.
~
l
' k' hen the probability or consequence of an event related to a particular
- topic is judged to be sufficiently small, the topic will not be
(
reviewed in detail and the basis for acceptability 'will be documented.
l For example, a minimum review effort will be required to determine the likelihood of an aircraft crash at a remote site away from airports and flight paths.
Figure 1 shows graphically the relation-ship between the probability of occurrence and the resulting radio-logical consequences with commonly accepted thresholds for both.
Topics related to events which have an expected likelihood of
-6
~
occurrence on the order of 10 to 10 per year or given the event occurs result in consequences of only a small fraction of 10 CFR Part
~
100 guidelines are considered to be of " lesser safety significance"."
Examples of topics which were generically deleted on the basis of
" lesser safety significance" for all operating plants follow:
(1) Containment External Design Pressure with Resoect to Containment Inadvertent Spray Operation The NRC normally reviews the containment functional desicn (SRP 6.2.1) for CP and OL applications, including consideration of external design pressure.
A conservative structural design is required to assure that the containment structure is capable of withstanding the maximum external pressure; or interlocks in the
.__m.,,,.,
r
~.
a e
-111 -
- plant protection system and administrative controls are:
required to preclude inadvertent operation of containment heat removal systems; or for steel containment vessels, vacuum relief devices are' provided in accordance with i
L
_ applicable code requirements.
Inadvertent containment i
spray operation results in cooling of the containment
{
atmosphere and lowering its pressure if (a) the incoming containment spray liquid is colder than the building atmospheric temperature and (b) the building is a closed vessel (no vacuum breakers and no ventilation system in operation). Using conservative assumptions, the calculated equilibrium containment pressure would be about 3 psi below the outside air pressure.
However, using realistic initial operating conditions, the differential pressure resulting from inadvertent spray operation would be no more than about 1.5 psi.
Operator intervention and/or vacuum breaker actuation would reduce the pressure differential even nore.
Because of the inherent containment strength resulting from requirements to meet its internal design pressure, it should withstand an external pressure of at least 3 psi.
Thus, it is not expected'to fail in the event of inadvertent spray operation even under conservative postulated conditions.
i
~
J l-
- 12'-
i-L Hence,' logical-technical arguments coupled with the very remote possibility that a-containment would be requirec to perform its' safety fu'nction simultaneously with I
inadvertent spray operation, justifies deletion of this topic for operating facilities on the basis aof lesser safety significance.
Inadvertent spray operation' would necessitate a reactor shutdown and could require inspection, testing, and recairs of components and structures, if not adequaiely desianed to withstand the external pressure, to assure their acceptabilit.y for continued operation.
This would have an unnecessary, undesirable inpact on facility operation.
Tnerefore, it'is pru-6 dent to continue to review this topic for ne.. f acility anniica~tions on a conservative basis to assure that reasonable precautions have been taken to accommodate inadvertent spray operation.
(2) Radioactive Wastes Systems Based on past operating experience, includir.c consideratica I
of systen anc component failures, releases of gaseous.
liquid, or solid radioactive waste have not exceeded i: CR Part 20 limits.
In addition, if the worst possible f ailure of any of these systems were postulated to occur, it has been calculated that the resultant consequences wnuld not es;eed l
10 CFR Part 100 guidelines. On this basis this topic has 1
l l
--~-.---
been' considered of " lesser safety significance" and was deleted from the Topic List. This determiratico, however, does not obviate the need to evaluate the design of-these systems in new facilities.
}
If a topic is' associated with an event expected to occur more frequently than about 10-6 to 10-7 per year and which may' potentially result in consequences greater than a small fraction of 10 CFR Part 100 guidelines, it is considered to have potential safety significance.
As indicated in Figure 1, these guidelines are not defined by well delineated boundaries, but instead by " grey areas", where the safety significance of a topic has to be determined on a case-by-case basis.
The determination of whether a topic in this " grey area" is safety significant involves consideration of other f actors, such as the degree of conservatism in the safety analysis.
For eu.mple, i f an event is found to have a frequency of occurrence somewhat higher than about 10~ per year by a very conservative method and/or if the consequences associated with the event have been determined to be small by a more realistic approach, then the topic may be judged by the SEP to be of " lesser safety significance".
.)
h
- 14
?
C.
Review Procedure
-The capability of a plant to respond to selected design basis events will be the basis for assessing the safet;/ adequacy of the operating facilities reevaluated.
The selected dcsign basis events are included in the Topic List and consist of -identified single events which can potentially result in greater than routine releases of radioactive material from the site.
This set of design basis events include:
(1) natural phenomens such as earthquakes, fires and -floods and (2) events resulting from postulated plant transients, accidents and failures such as turbine missiles and pipe breaks. An operating f acility will be-considered to be adequately safe if it can be demonstrated that the facility v.ill reliably respond to all design basis events-with 10 CFR Part 100 guidelines values not beinc exceeded.
Safety topics remaining on the.~opic List af ter the removal of the design basis events are.of two types, those that affect the likelihood of occurrence of an event and those that affect the response of the plant to the event (some topics affect both).
Both the likelihood of the event and the plant response to the event will be: considered in making safety assessments.
A see:ific plant evaluation will be performed in two steps:
First, each design basis event will be evaluated separately and secondly, an overall plant safety assessment will be made considering the plant response to all design i
1 j
basis events.
A discussion of the two steps fcil:
5.
l i
I
15 -
Step 1 Plant systems and their functions which respond to.niticate the consequencesaof each design basis event will be identified.
Next the safety issues from the Topic List which affect each system or system function will be idsntified.
The relationship between a design basis event and the systems and safety-issues which affect it are shown below.
Safety Issue 1 System '
Safety Issue 2 Safety Issue 3 Design Basis System 2 Safety Issue 4 Event 1 Safety Issue 5 Safety issue 6
-System 3 Safety Issue 7 Safety Issue 8 In this diagram, Systems 1, 2 and 3 are representative of plant systems designed to respond to Design Basis Event 1 (i.e., protect the plant or the public or both).
Safety Issues 1, 2 and 3 are safety issues from the Topic List which potentially affect the capability of System 1 to perform its safety function.
Likewise Safety Issues 3, 4 and 5 affect System 2 and Safety Issues 6, '
and 8 affect System 3.
It should be noted that some systems are designed for protection from more than one Design Basis Event and j
that some safety issues can affect more than one system.
t-l 4
e*--, -
M w- - - ----vrrm-----~-%-
?
- -ry-w,w
=e-m e
m-
-mse--+
g y--Fm e-9 m
e e'w
--e-pnee' y
-d-e
- ,me-
l f Consideration of both plant systems and design basis events is I
l considered necessary to provide a meaningful context for resolving i
the safety issues, and to provide a basis for assessing the effect of the safety issues on overall plant safety. All plant systems l
l which are impo'rtant to protecting the plant from the design basis events will also be identified. Those systems will be compared with similar systems required for current plants to determine the extent of differences.
SRP criteria will be used as a gauge to determine the extent of conformance with current licensing criteria.
If the results of the review of a given topic is that the plant meets current requirements, then it will be deemed to be satisfactory and will be so documented.
If the results do not meet current requirements (which we expect to often be the case), the degree of deviation from current criteria, as well as any viable corrective measures, will be documented for later considera-tion when the overall plant safety assessment (as outlined in Step 2) is made.
When deviations from current licensing approaches are identified, the following alternatives (or combinations of alternatives) will be considered as a basis for establishing acceptability:
I 1.
The deviation can be justified as not significantly decreasing the level of safety, i.e., the probability and consequences of e,ents are sufficiently low.
(
.R
[p I
- 2.
Use of non-safety systems to perform safety functions.
3.
Administrative or procedural changes to enhance system.
l reliability 4.
Augmented surveillance programs 5.
Selected backfitting to enhance system reliability -
l An evaluation of relevant operating experience will also be 1
l included in each step _of this process, as appropriate. This evaluation will include a review of licensee operating and event reports for indications of needed changes to reduce the likelihood of system or component failures.
Favorable operating l
~
experience will also be considered in assessing deviations fron current criteria where appropriate. The elements of the periodic (ten year)' review recommended by the ACRS will be included for the plants reviewed during Phase 11, but will be performed and documented in a manner to support the SEP review process.
Each design basis event will be evaluated as described above and any potential corrective measures will be documented for consideration when the overall plant safety assessment is made.
Step 2 Af ter the preliminary assessment of each individual design basis event as outlined in Step 1 is completed, an overall plant
- 1.
- l safety assessment will be made.
The effect of corrective measures l
identified during Step 1 for each individual event evaluated will k.
._m.
0 18 -
be examined to determine the integrated ef fect of the preliminat) assessment from all other design basis events.
This will provide assurance that measures taken to. assure an acceptable response to one event will not adversely affect the plant's response to some other event, that backfitting decisions can be balanced decisions, and that the most efficient approach to any necessary plant upgrading is taken. Af ter potential conflicts in system functions have been identified and resolved, the alternatives listed in Step 1 will be considered and overall integrated decisions on the plant as a whole can be made on the appropriate corrective action.
l The above procedure will provide a basis for making balanced backfit decisions because of the persoective gained by considering all identifieu plant deficiencies and alternate capabilities.
Deviations from current criteria will be deemed acceptable if the staff evaluation shows that the plant will respond satisfactorily to all design basis events; i.e. that the probability of design basis events are not significantly higher than for a facility licensed in accordance with current criteria and the consequences of their occurrence are within the guiceline l
value' of 10 CFR Part 100.
s l
I l
l l
.)
l t
J
- 19 _
The SEP review will-be somewhat more limited in scope than a complete-construction permit (CP)/operatino license (OL-) review based on the complete set of licensing requirements.
(For example, safety related features which are known to have been designed to criteria com-I parable to those currently used will not be re-evaluated.
Also some review will be done utilizing on-site inspections, review of operating experience and comparisons of similar systens and components in lieu of detailed descriptions and analyses required for a CP/0L review.)
Only criteria related to the safety issues on the Topic List plus those that specify system functions and plant response to the design basis events will be exanined.
Although the review will be condderably smaller in scope than the current CP and OL review, it will be sufficient to ascertain whether the facility satisfies the General Desiqn Criteria and other applicable regulations.
IV.
RESOURCE AND SCHEDULE CONSIDERATIONS
!;RR considers the Systematic Evaluation Program to be a sicnificant, important task and as such will staff it accordingly.
Based on a consideration of the scope of the program and on any potertial interference with other ongoing programs, the eleven revieves of
. Fnase II are scheduled for completion within three years.
This schedule will enable the assignnent of sufficient manpower in each engineering discipline without significantly inpacting other hich criority efforts. including the ongoing neneric technical activities reviews.
i
. Licensee resource requirements will be minimized and will be limited by a staff screening and evaluation of available docketed information prior to requesting' additional information from the licensee. To assure that information requests are limited to that necessary for completing an SEP review, information requests will be tailored for each facility.
V.
SUMMARY
The NRC has determined that the Systematic Evaluation Program is a high priority task that should proceed expeditiously for the eleven identified older operating facilities. This program will provide:
- a. A reassessment of the overall safety margins at each facility.
- b. A rational basis for comparison with current licensing criteria, and a basis for accepting deviations from current criteria.
- c. A means of identifying systems interactions in a manner compatible with the generic evaluation of system interaction being performed in the NRR Technical Activities Program.
- d. An integrated and balanced approach to backfit considerations as neces sa ry.
- e. Ccmprehensive documentation which addresses the identified safety issues, without performing a complete CP/0L type review of each plant.
^
7 e
7:,
'e 4
f/
ATTACEMENT'l
~
v PLANTS PROPOSED FOR PHASE II 0F SEP
- LANT NAME' DATE OF" POL
~
DATE O FTOL Dresden 1 09/28/59-
- 7' '
10/14/60 Yankee Rcwe
/
07/09/60
06/23/61 08/3'0/6Es 05/01/64-Eig Rock Point-t San Onofre 1 03/27/67
. j
-J Conn Yankee s-06/30/67 12/27/74 La Crosse 07/03/67
' ~
n w..
+
.'ar f
Syster Creek 04/09/69-y R. E. Ginna 09/19/69 Oresden 2 12/22/69 villstone i 10/07/70 Aalisades
'03/21/7i
'The first six plants inc1Uding 50 with provisional coeriting license's','-
POL, were originally preposed for-review during Phase II.
The. l.ast.-
five plants are f acilities cperating under a POL, which are rec'omenceo additions to Phase II.
b+
/
Y e
- -e
+
-r
+--m-=
y-
.A
,,-,-.r-w-m--
-g
-r-9 g
y,r-
-vm-
a ss
'/-
'l f9
%.l
_ J
's
- s{
ATTACHMENT 2 n' -
. "r i
TOPIC LIST FOR SEP REVIEW
,p
~
<F!;
(10/11/77) i
,,, '. '... Introduction q
This comprehensi-ve Topic List provides the basis for the systematic evaluation of operating reactors.
The Topic List was derived fron the following listings of items:
(1) TSAR-264:
Technical Safety Activities Report, DSS update, 264 items, December 1975 p
(2) Enci B-324: Memo Eisenhut to Stello (2/15/77) - Prioritization of NRR Technical Generic. Activities, 324 items (3) TFL-118: Task Force Report on the Systematic Evaluation of Operating Nuclear Power Plants, Appendix B, November 1976, 118 items (4) 00T-102:
List of 102 items prepared by D0R in March 1977 The above lists were compiled and organized in the general format of the Standard Review Plan (SRP) with respect to chapter identification.
Following the compilation and organization of the above listed itens, a culling. procedure was initiated. Many topics were cateaorically removed from the list based on the following criteria:
1.
Not related to operating LWR's and therefore not within the scope of SEP review (e.g., topics related to HGTR. L!'JBR, off-shore plants, Research and Test Reactors and unlicensed facilities).
2.
Research and Development programs in progress (e.g. evaluation of acoustic emission and other advanced HDE techniques) 3.
Refinement of evaluation techniques (includes methodology and data collection to enhance staff capabilities but does not directly affect reactor performance or design).
4 Suggested topics which were too general (e.g. review ceology) and non-safety related issues.
4 5.
Duplications 6.
Topics which the NRC is considering but is not yet implementino on new facilities.
'~ /
7 Topics which have been reviewed and appropriately imolenented.
Topics which are reviewed on a periodic basis in accordance with current criteria.
i.
Topics of " Lesser Safety Significance" (bases f cr uletion of all topics in this category have been written.)
/
I.
e
- 10.- Ccr.bination of sini'ar tcpics in the preparation of tenic definitions.
This Topic List includes generic issues presently under review, these for which there is an interin NRC position, and generic issues not being actively investigated.
These topics have been identified by an
- in, the lef t margin. They are retained on the list for SEP
}
followup and appropriate evaluation and integration into plant specific reviews but SEP will not be responsible for development of l
positions on generic issues.
Generic issues which involve long term research and development programs have not been included on the Topic List.
Figure 1 graphically displays the evolution of the Ccrorehensive Toric List.
e ATTACHMF.NT 2
4 EVOLUTION OF SEP TOPIC LIST NOTE:
"A" represents generic topics and "B" represents topics which must be considered by SEP 800 -
NUMBER OF TOPICS 500 d
S a
S c
e E
X L
C a
=
a
+
4
=
=
5 u
,, g.,
1 I1 I
z I3 I:
Is i e,7i u i a, 9 n_:,:__.-.
.,...,--.,e fne.--,..,, _c. -,s,_
re-
- m
- s. n::
s.
FIGURE 1 D**D
}D []3[]YM e Juu JU 1 h ce
. ~ _
1 II
-SITE CHARACTERISTICS 11-1 Site A.
Exclusion Area Authority and Centrol B.
Population Distribution F
C.
Potential Hazards or Changes in Potential Hazards Due to Transportation, Institutional, Industrial, and Military Facilities 11-2 Meteorology A.
Severe Weather Phenomena
- B.
Onsite Meteorological Measurements Program C.
Atmospheric Transport and Diffusion Characteristics for Accidents Analysis D.
Availability of Meteorological Data in the Control Room 11-3 Hydroloay A.
Hydrologic Description B.
Flooding Potential anc Protection Requirements 1.
Capability of Operating Plant to Cope with Design Basis Flooding Conditions C.
Safety-related Water Supply (Ultimate Heat Sink (VHS))
l
- Generic issues under review.
ATTACHMENT 2 l
e I
2 11-4 Geology and Seismology
- A.
Tectonic Province B.
Proxinity of Capable Tect6nic Structures in Piant Vicini ty f
C.
Historical Seismicity within 200 Miles of Plant D.
Stability of Slopes E.
Dam Integrity F.
Settlement of Foundations and Buried Equipment
- Generic issues under review.
ATTACHMEt1T 2
3 III DESIGN 0: STRUCTURES, COMPONENTS, ECUIPMENT, AND EYSTEMS III-1 Classification of Structures, Components and Systens-(Seismic and Quality)
III-2 Wind and Tornado loadings III-3 Hydrodynamic Loads
)
A.
Effects of High Water Level on Structures B.
Structural and Other Consequences (e.g. Flooding of Safety-Related Equipment in Basements) of Failure of Underdrain
. Systems C.
Inservice Inspection of Water Control Structures III-4 Missile Generation and Protection A.
Internally Generated' Missiles D.
Site Proximity Missiles (Including Aircraf t)
III-5 Evaluation cf Pipe Breaks
- A.
Effects of Pipe Break on Structures, Systems and Components Inside Containment
- B.
Pipe Break Outside Containment III-6 Seismic Design Considerations
- Generic issues under review.
ATTACHMENT 2 l
.- i
m, f-4 111-7 ~ Catecery I Structures Integrity' 3
- A.
Inservice Inspection,~ Including Prestressed Concrete Containments with Either Grouted or Ungrouted Tendors
- B.
Design Codes, Design Criteria, Load Combinations, 'and i
Reactor Cavity. Design Criteria p
C.
Delamination of Prestressed Concrete Containment Structures D.
Containment Structural Integrity Tests III-8 Reactor Vessel Internals Integrity
+A.
Loose Parts Monitoring and Core Barrel Vibration Monitorinc
- B.
Control Rod Drive Mechanism Integrity C.
Irradiation Damage, Use of Sensitized Stainless Steel and Fatigue Resistance
- D.
Core Supports and Fuel Integrity
- III-9 Support Integrity 111-10 Pumas and Valves Integrity A.
Thermal-0verload Protection for Motors of Motor-operated Valves B.
Pump Flywheel Integrity
- C.
Surveillance Requirements on BWR Recirculation Pur.cs I
and Discharge Valves 111-11 Component Integrity III-12 Environmental Oualification of Safety Related Equinment
- Generic issues under review.
ATTACHMENT 2 o
2 5
REACTOR IV-1 Thermal Hydraulic Design and Performance
- A.
Operation With less Than All Loops In Service IV-2 Reactivity Control Systems Including Functional Desian and Protection Against Single Failures IV-3 BWR Jet Pumps Operating Indications l
l l
1 I
l i
- Generic issues under review.
ATTACHMENT 2
0 6
V REACTOR COOLANT SYSTEM AND CONNECTED SYSTEttS
- V-1 Compliance with Codes and Standards (10 CFR 50.555i
' *V-2 Aeplicable Code Cases
- V-3 Overoressurization Protectico
- V-4 Piping and Safe End Integrity V-5 Reactor Coolant Pressure Boundary (RCPB) Leakage, Detection
- V-6 Reactor Vessel Integrity
- V-7 Reactor Coolant Pumo Overspeed
- V-8 Steam Generator (SG) Integrity V-9 Reactor Core Isolation Cooling System (BWR)
V-10 Residual Heat Removal (RHR) System A.
PHR Heat Exchanger Tube Failures
- B.
RHR Reliability V-11 Hich Pressure / Low Pressure Interface
~
- A.
Requirements for Isolation of High and Low Pressure Systems B.
RHR Interlock Requirements V-12 Reactor Water Cleanup System (BWR)
A.
Water Purity of Boiling Water Reactor Primary Coolant
- V-13 Water Han.mer
- Generic issues under review.
ATTACHf1ENT 2 i
l i
.-r--
-,,e-,.,,---...._-m
. r------
..c.
?
VI ENGINEERED 5AFETY FEATURES VI-l Organic Materials and Post Accident Chemistry VI-2 Containment Functional Design
- A.
Pressure-Suppression Type BWR Containments I
- B.
bubcompartment Analyr,is
- C.
Ice Condenser Containment
- D.
Mass and Energy Release for Possible Pipe Break Inside Containment
- VI-3 Containment Pressure and Heat Removal Capability VI-4 Containment Isolation System
- VI-5 Combustible Gas Control
- VI-6 Containment Leak Testing
'i VI-7 Emergency Core Cooling System A.
Emergency Core Cooling System Performance 1.
ECCS Re-evaluation to Account for Increased Vessel Head Temperature
- Generic issues under review.
ATTACH!iENT 2 l
8 I
2.
Upper Plenum -Injection j
3.
ECCS Actuation System i
- 4.
Core Spray Hozzle Effectiveness B.
ESF Switchover from Injection to Recirculation 11 ode (Automatic ECCS Realignment)
- i
- C.
ECCS Single Failure Criterion and Requirements for Locking Out Power to Valves Including Independence of Interlocks on ECCS Valves 1.
Appendix K - Electrical Instrunentation ano Control (EIC) Re-reviews 2.
Failure Mode Analysis - ECCS 3.
The Effect of PWR Loop Isolation Yalve Closure During a LOCA on ECCS Performance D.
Long Tern Cooling - Passive Failures (e.g., Flooding of Redundant Components)
- E.
ECCS Sump Design and Test for Recirculation Mode Effectiveness F.
Accumulator Isolation Valves Power and Control Systen Design VI-8 Control Room Habitability
]
7
- Generic issues under review.
ATTACHMENT 2 l
4 J
4 6
y_
-.y
c.
J 4
9 VI-9 Main Steam Isolation A.
fiain Steam Line Isolation Seal Systen - BWR VI-10 Selected Engineered Safety Features (ESF) Aspects A.
Testing of Reactor Trip System and Engineered Safety Features Including Response Time Testing B.
Shared Engineered Safety Features, On-site Emergency Power, and Service Systems for Multiple Unit Facilities e
4_
4
10 VII INSTRUMEllTATION AND CONTROLS VII-l Reactor Trio Systems (IEEE-279)
A.
Isolation of Reactor Protection System from Non-safety Systems, Including Qualifications of Isolation Devices B.
Trip Uncertainty and Setpoint Analysis Review of Operating
}
Data Base VII-2 Engineered Safety Features (ESF) System Control Logic and Desion VII-3 Systems Required for Safe Shutdown
- VII-4 Effects of Failure in Hon-safety Related Systems on Selected Engineered Safety Features
- VII-5 Instruments for Monitoring Radiation and Process Variables During Accidents
- VII-6 Frequency Decay VII-7 Acceptability of Swing Bus Design on BWR 4 Plants
- Generic issues under review.
ATTACHMENT 2 I
.a7 11
~
l
(:
t VIII ELECTRIC POWER VIII-l Offsite Power Systems
- A.
Potential Equipment Failures Associated with a Degraded Grid Voltage
- VIII-2 Onsite Emergency Power Systems - Diesel Generator VIII-3 Emergency DC Power Systems
- A.
Station Battery Capacity Test Requirements B.
DC Power System Bus Voltage Monitoring and Annunciation
- VIII-4 Electrical' Penetrations' of Reactor Containment IX AUXILIARY SYSTEMS
- IX-1 Fuel Storage
- IX Overhead Handling Systems - Cranes IX-3 Station Service and Cooling Water Systems IX-4 Boron Addition System IX-5. Ventilation-Systems
- IX-6 Fire Protection l
l
- Generic issues under review.
ATTACHMEtli 2
es 12 o
X
'9%ILIARY FEED'a'ATER SYSTEM XI RADI0 ACTIVE WASTE MANAGEMENT XI-l Appendix I I
- XI-2 Radiological (Effluent and Process) Monitoring Systems XII (Section on RADIATION PROTECTION Intentionally left Blank)
XIII OPERATIONS XIII-1 Conduct of Operations "XIII-2 Safeguards / Industrial Security XIV (Section on STARTUP TESTS AND CRITICALITY Intentienalb Lef t Blank'-
- Generic issues under review.
ATTACHMENT 2
- g. -
\\
=
13 l
> V-
'CCIDD;TS A!:0 TRANSIENTS l
XV-1 Decrease in Feedwater Temperature, Increase in Feecwater Flow, Increase in Steam Flow and Inadvertent Creninc of a Steam Generator Relief or Safety Valve
~
XV-2
.Spectrun of Steam System Pipina Failures Inside and i
Outside of Containment (PWR)
XV-3.
Loss of External Load, Turbine Trip, Loss of Condenser l
Vacuum, Closure of Main Steam Isolation Valve (BWR),
and Stean Pressure Regulator Failure (Closed)
XV 4 Loss of Non-Emercency A-C Power to the Station nuxiliaries l
XV-5 Loss of Normal Feedwater Flow l
XV-6 Feedwater System Pipe Breaks Inside and Outside Containment (PWR)
XV-7 Reactor Coolant Pumo Rotor Seizure and Reactor Coolant Pump Shaft Break XV-8 Control Rod Misoperation (Systen Malfunction er Operator Error)
XV-9 Startuo of an Inactive Loop or Recirculation Loco at an incorrect Temoerature, and Flow Controller Malfunction Causing an Increase in BWR CORE FLOW RATE XV-10 Chemical and volume Control System Malfunction that Results in a Decrease in the Boron Concen-tration in the Reactor Coolant (PWR) l l
l l
ATTACHMENT 2 i
.,-.--,_r m---
---.m-y
+-~
~y
-;--g-
'ts 4
14 3.**
I
' +XV-ll-Inadvertent Loadinc and Operation of a Fuel Assenbly in an irstroper Position XV-12 Spectrum of Rod Ejection Accidents (PWR)
XV-13 Spectrum of Rod Drop Accidents (BWR)
XV-14 Inacvertent Operation of ECCS' and Chemical and Volume Control System Malfunction that Increases Reactor Coolant Inventory XV-15 Inaevertent Opening of a PWR Pressurizer Safety / Relief Valve or a EWR Safety / Relief Valve XV-16 Radiological Consequences of Failure of Small Lines Carryinc Primary Coolant Outside Containment l-XV-17 Radiological Consecuences of Steam Geneator Tube l
Failure (PWR)
XV-18 Radiological Conseauences of Main Steam Line Failure Outsice Centainment (BWR)
XV-19 Loss-of-Coolant Accidents Resulting from Spectrum of Postuiatec Piping Breaks Within the Reactor Coolant Pressure Ecundary XV-20 Radiolocical Consecuences of Fuel Damaging Accidents (Insice and Outside Containment)
- XV-21 Spent Fuel Cask Droo Accidents
- XV-22 Anticipated Transients Without Scram XV-23 Multiole Tube Failures in Steam Generators
- XV-24 Loss of All A-C Power XVI TEC+iICAL SPECIFICATIONS l
l-l l
- XVII OPERATIONAL QA PROGRAM 1
- Generic 4ssues under review.
ATTACHMENT 2
..