Letter Sequence Other |
|---|
|
Results
Other: ML19250B849, ML19256F834, ML19308D652, ML19308D751, ML19308D892, ML19317G522, ML19319D228, ML19327A382, ML19327A384, ML19341C948, ML19341C952, ML20010G595, ML20031E322, ML20150F069
|
MONTHYEARIR 05000302/19760141976-09-22022 September 1976 IE Insp Rept 50-302/76-14 on 760817-19.No Noncompliance Noted.Major Areas Inspected:Followup on Previous IE Insp Findings,Gaseous Waste Sys Mods,Facility Status Affecting Plant Completion & Revision to SP-158 Project stage: Request ML19308D6521976-12-15015 December 1976 Surveillance & Inservice Insp Program Project stage: Other ML19308D7511976-12-15015 December 1976 Submits Util Planned Surveillance & Inservice Insp Program & Requests First Year Relief from STS 4.0.5 Requirements Project stage: Other ML19308D8921977-02-0101 February 1977 Approves 761215 Proposed Inservice Insp & Testing Program for Period,Pending Start of Commercial Operation.Request for Relief from ASME Code Requirements Includes Insufficient Info Project stage: Other ML19317G4591977-03-0202 March 1977 Forwards Addl Info Supporting Request for Relief from ASME Section XI Requirements for Inservice Insp & Testing Program Project stage: Request ML19317G5221977-04-14014 April 1977 Requests Waiver from ASME Section XI Inservice Insp Requirements.Development & Implementation of New Inservice Insp Program Will Include Proposed Alternate Examinations in Lieu of Impractical ASME Code Requirements Project stage: Other ML20037A5871977-04-22022 April 1977 Requests Technical Assistance for Review of Licensee 770414 Request for Waiver of Section XI ASME Code on Inservice Insp Project stage: Approval ML19319C7781977-06-14014 June 1977 Forwards Request for Addl Info Re Util 770414 Request for Relief from ASME Code Requirements Re Inservice Insp Project stage: RAI ML19319D2281978-08-17017 August 1978 Requests Relief for Inservice Insp Program from ASME Section IWA-5210 Requirements.Requirements Impractical for Testing Repair Weld on Elbow in 14-inch Feedwater Line Connected to Steam Generator Feedwater Header a Project stage: Other ML20150F0691979-03-28028 March 1979 Requests Waivers from Parts of Section XI to ASME Code 1974 Edition.Wishes to Adopt Subarticles & Article 7,000 of ASME Code 1977 Edition.Needs Addl Guidelines Re Repairs,Mod & Replacement to Establish Inservice Insp Program Project stage: Other ML19250B8491979-04-0505 April 1979 Updates Re Insp of Stagnant Low Pressure Stainless Piping Containing Boric Acid Solutions.Util Will Perform Periodic Pressure Tests & Leak Detection to Monitor Piping for Intergranular Chloride Stress Corrosion Cracking Project stage: Other ML19256F8341979-12-0404 December 1979 Advises of NRC Position,In Response to 790725 Submittal Re Pump & Valve Inservice Testing Program.High & Low Pressure Interfaces W/Two or More Valves Shall Be Leak Tested Periodically.Requests Design Provisions Per Encl Project stage: Other ML19257C7731980-01-25025 January 1980 Responds to NRC 791204 Request for Addl Design Provisions & Test Methods Permitting Valve Leak Testing.Forwards Revision to Pump & Valve Test Program Pages & Discussion of Design Mods Necessary to Accomplish Alternative Test Method Project stage: Request ML19318C3271980-06-26026 June 1980 Application for Amend to License DPR-72,granting Waiver from Certain ASME Section XI Testing & Insp Requirements. Certificate of Svc Encl Project stage: Request ML19327A3821980-07-22022 July 1980 Forwards Fr Notice of Granting Relief from ASME Section XI Inservice Insp (Testing) Requirements by Permitting Use of Winter 1977 Addenda for Hydrostatic Pressure Test Project stage: Other ML19327A3841980-07-22022 July 1980 Notice of Granting of Relief from ASME Section XI Inservice Insp (Testing) Requirements by Permitting Use of Winter 1977 Addenda for Hydrostatic Pressure Test Project stage: Other ML19341C9481981-02-27027 February 1981 Forwards Annual Operating Rept,1980. Includes Personnel Exposure,Reactor Vessel Matl Surveillance Capsules, Production Facility Changes,Tests & Experiments & Steam Generator Inservice Insp Project stage: Other ML19341C9521981-02-27027 February 1981 Annual Operating Rept,1980. Includes Personnel Exposure, Reactor Vessel Matl Surveillance Capsules,Production Facility Changes,Tests & Experiments & Steam Generator Inservice Insp Project stage: Other ML20010G5951981-09-14014 September 1981 Requests Generic Relief from Hydrostatic Test Requirements of Article Iwc 5000 of ASME Section XI While Performing Work on Main Feedwater Piping Between Steam Generators & First Upstream Isolation Valves.Response Requested by 811015 Project stage: Other ML20005B9901981-09-14014 September 1981 Response to ASLB 810825 Order to NRC Re ASLB Notification of Unsatisfactory Test Results of Safety Valve.Reply Set Forth in Listed Documents.Certificate of Svc Encl Project stage: Request ML20031E3221981-10-0606 October 1981 Requests Relief from Requirements of Article IWB-2000 of ASME Section XI Re Ultrasonic Insp of Vessel Ring Forging to Support Skirt Weld.Insp Is Not Safe Due to High Radiation in Vicinity of Vessel Supports Project stage: Other ML20032A9181981-10-23023 October 1981 Requests Remittance of Class III Fee for Review of 811006 Application Requesting Relief from Inservice Insp Requirements Re Ultrasonic Insp of Vessel Ring to Support Skirt Weld Project stage: Approval ML20032C2251981-11-0202 November 1981 Requests Extension of 810914 Exemption Request Re Relief from Hydrostatic Testing of Main Feedwater Piping ASME Code, Section XI to Include Main Steam Lines,From Steam Generator to Main Steam Stop Valves Project stage: Other ML20005C1791981-11-12012 November 1981 Submits Fee for 811006 Request for Relief from ASME Section XI Requirements Involving Ultrasonic Insp of Reactor Vessel Ring Foregoing to Support Skirt Weld Project stage: Request ML20052B1911982-04-0808 April 1982 Safety Evaluation Granting Relief from Inservice Insp Requirement Project stage: Approval ML20052B1861982-04-0808 April 1982 Grants Requested Relief from Hydrostatic Test & Insp Requirement.Exam of Replacement Weld Areas by Radiographic & Magnetic Particle Methods Adequate.Ser Encl Project stage: Other 1979-04-05
[Table View] |
Text
,D?fD
[ T~i f,a n m,i?fh y
a 03 o C !,, c b a' bf w yg useW Florida Power g
g (y.i c a un m.o ~
hi, u d e
{e 00T14198 M-October 6, 1981 g#pg (Il File:
3-B-4
\\
3F-1081-09 q,,
/
Mr. John F. Stolz Operating Reactors Branch No. 4 Division of Operating Reactors U.S. Nuclear Regulatory Commission Washington, DC 20555
Subject:
Crystal River Unit No. 3 Docket No. 50-302 Operating License No. DPR-72 Relief from ASME Ultrasonic Testing Code
Dear Mr. Stolz:
The current Inservice Inspection Program at Crystal River Unit No. 3 is based on ASME Section XI, 1974 Edition through Summer 1975 Addenda.
This letter is to advise you that Florida Power Corporation has determined that a portion of the ASME Section XI Code, concerning inservice examination of integrally welded vessel supports, is not feasible for use at Crystal River Unit No. 3.
Accordingly, Florida Power Corporation requests relief from the inservice examination requirements of Article IWB-2000 of ASME Section XI relating to ultrasonic inspection of the vessel ring forging to support skirt weld.
Ultrasonic inspection of the weld cannot be safely accomplished due to high levels of radiation in the vicinity of the vessel supports.
Current estimates of the radiation field in that area range from 2000 - 5000 R/hr. which is much too high for inspection by state-of-the-art inspection methods. As alternate methods become available, they will be reviewed for possible implementation.
Very truly yours, FLORIDA POWER CORPORATION f$a h41 atsy Y. Baynard Manager i
O Nuclear Support Services L
'8110150383 811006 KFP:cmd PDR ADOCK 05000302 G
PDR General Office 320i Thirty tourtn street sootn. P O Box 14042. St Petersbu g. Florca 33733 e 813 -~ 866-5151 r