MONTHYEARIR 05000302/19760141976-09-22022 September 1976 IE Insp Rept 50-302/76-14 on 760817-19.No Noncompliance Noted.Major Areas Inspected:Followup on Previous IE Insp Findings,Gaseous Waste Sys Mods,Facility Status Affecting Plant Completion & Revision to SP-158 Project stage: Request ML19308D6521976-12-15015 December 1976 Surveillance & Inservice Insp Program Project stage: Other ML19308D7511976-12-15015 December 1976 Submits Util Planned Surveillance & Inservice Insp Program & Requests First Year Relief from STS 4.0.5 Requirements Project stage: Other ML19308D8921977-02-0101 February 1977 Approves 761215 Proposed Inservice Insp & Testing Program for Period,Pending Start of Commercial Operation.Request for Relief from ASME Code Requirements Includes Insufficient Info Project stage: Other ML19317G4591977-03-0202 March 1977 Forwards Addl Info Supporting Request for Relief from ASME Section XI Requirements for Inservice Insp & Testing Program Project stage: Request ML19317G5221977-04-14014 April 1977 Requests Waiver from ASME Section XI Inservice Insp Requirements.Development & Implementation of New Inservice Insp Program Will Include Proposed Alternate Examinations in Lieu of Impractical ASME Code Requirements Project stage: Other ML20037A5871977-04-22022 April 1977 Requests Technical Assistance for Review of Licensee 770414 Request for Waiver of Section XI ASME Code on Inservice Insp Project stage: Approval ML19319C7781977-06-14014 June 1977 Forwards Request for Addl Info Re Util 770414 Request for Relief from ASME Code Requirements Re Inservice Insp Project stage: RAI ML19319D2281978-08-17017 August 1978 Requests Relief for Inservice Insp Program from ASME Section IWA-5210 Requirements.Requirements Impractical for Testing Repair Weld on Elbow in 14-inch Feedwater Line Connected to Steam Generator Feedwater Header a Project stage: Other ML20150F0691979-03-28028 March 1979 Requests Waivers from Parts of Section XI to ASME Code 1974 Edition.Wishes to Adopt Subarticles & Article 7,000 of ASME Code 1977 Edition.Needs Addl Guidelines Re Repairs,Mod & Replacement to Establish Inservice Insp Program Project stage: Other ML19250B8491979-04-0505 April 1979 Updates Re Insp of Stagnant Low Pressure Stainless Piping Containing Boric Acid Solutions.Util Will Perform Periodic Pressure Tests & Leak Detection to Monitor Piping for Intergranular Chloride Stress Corrosion Cracking Project stage: Other ML19256F8341979-12-0404 December 1979 Advises of NRC Position,In Response to 790725 Submittal Re Pump & Valve Inservice Testing Program.High & Low Pressure Interfaces W/Two or More Valves Shall Be Leak Tested Periodically.Requests Design Provisions Per Encl Project stage: Other ML19257C7731980-01-25025 January 1980 Responds to NRC 791204 Request for Addl Design Provisions & Test Methods Permitting Valve Leak Testing.Forwards Revision to Pump & Valve Test Program Pages & Discussion of Design Mods Necessary to Accomplish Alternative Test Method Project stage: Request ML19318C3271980-06-26026 June 1980 Application for Amend to License DPR-72,granting Waiver from Certain ASME Section XI Testing & Insp Requirements. Certificate of Svc Encl Project stage: Request ML19327A3821980-07-22022 July 1980 Forwards Fr Notice of Granting Relief from ASME Section XI Inservice Insp (Testing) Requirements by Permitting Use of Winter 1977 Addenda for Hydrostatic Pressure Test Project stage: Other ML19327A3841980-07-22022 July 1980 Notice of Granting of Relief from ASME Section XI Inservice Insp (Testing) Requirements by Permitting Use of Winter 1977 Addenda for Hydrostatic Pressure Test Project stage: Other ML19341C9481981-02-27027 February 1981 Forwards Annual Operating Rept,1980. Includes Personnel Exposure,Reactor Vessel Matl Surveillance Capsules, Production Facility Changes,Tests & Experiments & Steam Generator Inservice Insp Project stage: Other ML19341C9521981-02-27027 February 1981 Annual Operating Rept,1980. Includes Personnel Exposure, Reactor Vessel Matl Surveillance Capsules,Production Facility Changes,Tests & Experiments & Steam Generator Inservice Insp Project stage: Other ML20010G5951981-09-14014 September 1981 Requests Generic Relief from Hydrostatic Test Requirements of Article Iwc 5000 of ASME Section XI While Performing Work on Main Feedwater Piping Between Steam Generators & First Upstream Isolation Valves.Response Requested by 811015 Project stage: Other ML20031E3221981-10-0606 October 1981 Requests Relief from Requirements of Article IWB-2000 of ASME Section XI Re Ultrasonic Insp of Vessel Ring Forging to Support Skirt Weld.Insp Is Not Safe Due to High Radiation in Vicinity of Vessel Supports Project stage: Other 1979-12-04
[Table View] |
Text
..
m.
_m m.
m.
s m
J 4
j
=
i '
l i
Florida Power
' CC A 70 4 a '80 4 February 27, 1981 File:
3-0-3-a-3 Mr. J. P. O'Reilly l-Diiector Cffice of Inspection and Enforcement
.j U.S. Nuclear Regulatory Ccmission Suite 3100 101 Marietta Street Atlanta, GA 30303
SUBJECT:
Crystal River Unit 3 Cocket No. 50-302 Cperating License No. CPR-72 Annual Operating Report
.i -
j
Dear Mr. O'Reilly:
)
Enclosed are the following five attachments:
1 1.
1980 Annual Report on Personnel Exposure; as required by Florida Power Corporation's Crystal River Unit 3 Standard Technical Specifications, j
Section 6.9.1.5(a).
)
2.
1980 Annual Report en Personnel Exposure; as required by 10 CFR j
20.407(b)'.
1 j
3 1980 Annual Report on Reactor Vessel Material Surveillance Capsules; i
as required by Florida Power Corporatien's Crystal River Unit 3 j
Standard Technical Specifications, Section 6.9.1.5(b).
i 4
1980 Repcrt en Production Facility Changes, Tests and Experiments; as required by 10 CFR 50.59b.
i
\\
1 5
Report on Steam Generator Inservice Inspection ; as required by i
Florida Pcwer Corporation's Crystal River Unit 3 Standard Technical i
Specificaticns, Section 4.4.5.5(b).
i
})co%
=
5 i
i
)I
!810so4 0 SM General Office 32ai rnecum seeet soun. p o eo, i4n42 a om-r,m o + mu. an w < n -
't m
Mr. J. P. O'Reilly Page 2 February 27, 1981 If yo.2 have any questions regarding this report, please call.
Sincerely, FLORIDA PC'4ER CCRPCRATION
. Au aljndtd P. Y.
ynard Manager Nuclear Support Services Enclosure cc: it. Victor Stello, Jr.
Director Office of Inspection & Enforcer.ent U.S. !!uclear Regulatcry Ccmission Washington, D.C.