ML19250B849
From kanterella
Jump to navigation
Jump to search
Letter Sequence Other | |
|---|---|
Administration Results Other: ML19250B849, ML19256F834, ML19308D652, ML19308D751, ML19308D892, ML19317G522, ML19319D228, ML19327A382, ML19327A384, ML19341C948, ML19341C952, ML20010G595, ML20031E322, ML20150F069 | |
MONTHYEARIR 05000302/19760141976-09-22022 September 1976
[Table View]IE Insp Rept 50-302/76-14 on 760817-19.No Noncompliance Noted.Major Areas Inspected:Followup on Previous IE Insp Findings,Gaseous Waste Sys Mods,Facility Status Affecting Plant Completion & Revision to SP-158 Project stage: Request ML19308D6521976-12-15015 December 1976 Surveillance & Inservice Insp Program Project stage: Other ML19308D7511976-12-15015 December 1976 Submits Util Planned Surveillance & Inservice Insp Program & Requests First Year Relief from STS 4.0.5 Requirements Project stage: Other ML19308D8921977-02-0101 February 1977 Approves 761215 Proposed Inservice Insp & Testing Program for Period,Pending Start of Commercial Operation.Request for Relief from ASME Code Requirements Includes Insufficient Info Project stage: Other ML19317G4591977-03-0202 March 1977 Forwards Addl Info Supporting Request for Relief from ASME Section XI Requirements for Inservice Insp & Testing Program Project stage: Request ML19317G5221977-04-14014 April 1977 Requests Waiver from ASME Section XI Inservice Insp Requirements.Development & Implementation of New Inservice Insp Program Will Include Proposed Alternate Examinations in Lieu of Impractical ASME Code Requirements Project stage: Other ML20037A5871977-04-22022 April 1977 Requests Technical Assistance for Review of Licensee 770414 Request for Waiver of Section XI ASME Code on Inservice Insp Project stage: Approval ML19319C7781977-06-14014 June 1977 Forwards Request for Addl Info Re Util 770414 Request for Relief from ASME Code Requirements Re Inservice Insp Project stage: RAI ML19319D2281978-08-17017 August 1978 Requests Relief for Inservice Insp Program from ASME Section IWA-5210 Requirements.Requirements Impractical for Testing Repair Weld on Elbow in 14-inch Feedwater Line Connected to Steam Generator Feedwater Header a Project stage: Other ML20150F0691979-03-28028 March 1979 Requests Waivers from Parts of Section XI to ASME Code 1974 Edition.Wishes to Adopt Subarticles & Article 7,000 of ASME Code 1977 Edition.Needs Addl Guidelines Re Repairs,Mod & Replacement to Establish Inservice Insp Program Project stage: Other ML19250B8491979-04-0505 April 1979 Updates Re Insp of Stagnant Low Pressure Stainless Piping Containing Boric Acid Solutions.Util Will Perform Periodic Pressure Tests & Leak Detection to Monitor Piping for Intergranular Chloride Stress Corrosion Cracking Project stage: Other ML19256F8341979-12-0404 December 1979 Advises of NRC Position,In Response to 790725 Submittal Re Pump & Valve Inservice Testing Program.High & Low Pressure Interfaces W/Two or More Valves Shall Be Leak Tested Periodically.Requests Design Provisions Per Encl Project stage: Other ML19257C7731980-01-25025 January 1980 Responds to NRC 791204 Request for Addl Design Provisions & Test Methods Permitting Valve Leak Testing.Forwards Revision to Pump & Valve Test Program Pages & Discussion of Design Mods Necessary to Accomplish Alternative Test Method Project stage: Request ML19318C3271980-06-26026 June 1980 Application for Amend to License DPR-72,granting Waiver from Certain ASME Section XI Testing & Insp Requirements. Certificate of Svc Encl Project stage: Request ML19327A3821980-07-22022 July 1980 Forwards Fr Notice of Granting Relief from ASME Section XI Inservice Insp (Testing) Requirements by Permitting Use of Winter 1977 Addenda for Hydrostatic Pressure Test Project stage: Other ML19327A3841980-07-22022 July 1980 Notice of Granting of Relief from ASME Section XI Inservice Insp (Testing) Requirements by Permitting Use of Winter 1977 Addenda for Hydrostatic Pressure Test Project stage: Other ML19341C9481981-02-27027 February 1981 Forwards Annual Operating Rept,1980. Includes Personnel Exposure,Reactor Vessel Matl Surveillance Capsules, Production Facility Changes,Tests & Experiments & Steam Generator Inservice Insp Project stage: Other ML19341C9521981-02-27027 February 1981 Annual Operating Rept,1980. Includes Personnel Exposure, Reactor Vessel Matl Surveillance Capsules,Production Facility Changes,Tests & Experiments & Steam Generator Inservice Insp Project stage: Other ML20010G5951981-09-14014 September 1981 Requests Generic Relief from Hydrostatic Test Requirements of Article Iwc 5000 of ASME Section XI While Performing Work on Main Feedwater Piping Between Steam Generators & First Upstream Isolation Valves.Response Requested by 811015 Project stage: Other ML20031E3221981-10-0606 October 1981 Requests Relief from Requirements of Article IWB-2000 of ASME Section XI Re Ultrasonic Insp of Vessel Ring Forging to Support Skirt Weld.Insp Is Not Safe Due to High Radiation in Vicinity of Vessel Supports Project stage: Other 1979-12-04 |
| ML19250B849 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 04/05/1979 |
| From: | Stewart W FLORIDA POWER CORP. |
| To: | Reid R Office of Nuclear Reactor Regulation |
| References | |
| 3-O-3-A-3, TAC-04548, TAC-4548, NUDOCS 7911050374 | |
| Download: ML19250B849 (3) | |
Similar Documents at Crystal River | |
|---|---|
Text
Retrieved from "https://kanterella.com/w/index.php?title=ML19250B849&oldid=4886168"