ML20052B186
| ML20052B186 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 04/08/1982 |
| From: | Stolz J Office of Nuclear Reactor Regulation |
| To: | Hancock J FLORIDA POWER CORP. |
| Shared Package | |
| ML20052B187 | List: |
| References | |
| TAC-46976, NUDOCS 8204300133 | |
| Download: ML20052B186 (2) | |
Text
'
E APRIL 0 8E DISTRIBUTION:
DEisenhut ACRS-10 Docket File SMiner Gray Fila NRC PDR RIngram RDiggs L PDR H0rnstein CMiles y
Ogkebo.50-302 EBlackwood TBarnhart N
0 ELD ASLAB AE0D.
DBrinkman Q
q$9 IE pf.
,e s
6
.3 6
Mr. John A. Hancock Q @v ($c:#N Vice President, Nuclear Operations
~
N;,
Florida Power Corporation a
9 ATTN: Manager, Nuclear Licensing D:s g
P. O. Box 14042, M.A.C. H-2 0
o St. Petersburg, Florida 33733
" / %'
Dear Mr. llancock:
SUBJECT:
CRYSTAL RIVER UNIT 3 - RELIEF FROM ASME SECTION XI HYDROSTATIC TEST REQUIREMENT In letters dated September 14 and November 2,1981, you requested relief from the ASME Section XI Code hydrostatic test requirement following the removal and replacement of drain valve FWV-183. Pursuant to paragraph 50.55a(g)(6)(1) of 10 CFR Part 50, we have evaluated the request and concluded that the code requirement is impractical for the Crystal River Unit 3 facility. The examination of the replacement weld areas by radio-graphic and magnetic particle methods, periodically followed by the code inservice inspection requirement, will provide an adequate degree of component integrity and safety. The requested relief from the hydro-static test is therefore granted.
Our Safety Evaluation Report is enclosed.
Sincerely,
' ORIGIN AL SIGL'D II John D t'o h hief Operating Reactors Branch #4 Division of Licensing 1
Enclosure:
Safety Evaluation Report cc w/ enclosure:
See next page l
t 8204 300 Q}
I l
... ORB #.4:g,j7(.C
- 4:DL DL A omce >
. ~.....
- y. g.p.
sua m e>
.. 4.j...g......... 4.. y.
omy Nnc ronu sis oom> Nncu ono OFFICIAL RECORD COPY usom mi-us..w
50-302 Crystal Riv:r Unit No. 3 Florida Power Corporation cc w/ enclosure (s):
y fir. S. A. Brandimore Florida Power Corporation Mr. Robert B. Borsum Vice President and General Counsel Babcock & Wilcox P. O. Box 14042 Nuclear Power Generation Division St. Petersburg, Florida 33733 Suite 220, 7910 Woodmont Avenue Bethesda, Maryland 20814 Mr. Wilbur Langely, Chairman Board of County Commissioners Mr. Tom Stetka. Resident Inspector Citrus County U.S. Nuclear Regulatory Comission Iverness, Florida 36250 Route #3, Box 717 Crystal River, Florida 32629 Regional Radiation Representative Mr. T. C. Lutkehaus EPA Region IV Nuclear Plant Manager 345 Courtland Street, N.E.
Florida Power Corporation Atlanta, Georgia 30308 P. O. Box 219 Crystal River, Florida 32629 Bureau of Intergovernmental Relations 660 Apalachee Parkway Crystal River Public Library Tallahassee, Florida 32304 668 N. W. First Avenue Crystal River, Florida 32629 Administrator Department of Environmental Regulation Power Plant Siting Section State of Florida l
2600 Blair Stone Road l
Tallahassee, Florida 32301 Attorney General Department of Legal Affairs The Capitol Tallahassee, Florida 32304 l
Mr. James P. O'Reilly, Regional Administrator U. S. Nuclear Regulatory Comission, Rcgion II 101 Marietta Street, Suite 3100 l
Atlanta, Georgia 30303
..