MONTHYEARIR 05000302/19760141976-09-22022 September 1976 IE Insp Rept 50-302/76-14 on 760817-19.No Noncompliance Noted.Major Areas Inspected:Followup on Previous IE Insp Findings,Gaseous Waste Sys Mods,Facility Status Affecting Plant Completion & Revision to SP-158 Project stage: Request ML19308D6521976-12-15015 December 1976 Surveillance & Inservice Insp Program Project stage: Other ML19308D7511976-12-15015 December 1976 Submits Util Planned Surveillance & Inservice Insp Program & Requests First Year Relief from STS 4.0.5 Requirements Project stage: Other ML19308D8921977-02-0101 February 1977 Approves 761215 Proposed Inservice Insp & Testing Program for Period,Pending Start of Commercial Operation.Request for Relief from ASME Code Requirements Includes Insufficient Info Project stage: Other ML19317G4591977-03-0202 March 1977 Forwards Addl Info Supporting Request for Relief from ASME Section XI Requirements for Inservice Insp & Testing Program Project stage: Request ML19317G5221977-04-14014 April 1977 Requests Waiver from ASME Section XI Inservice Insp Requirements.Development & Implementation of New Inservice Insp Program Will Include Proposed Alternate Examinations in Lieu of Impractical ASME Code Requirements Project stage: Other ML20037A5871977-04-22022 April 1977 Requests Technical Assistance for Review of Licensee 770414 Request for Waiver of Section XI ASME Code on Inservice Insp Project stage: Approval ML19319C7781977-06-14014 June 1977 Forwards Request for Addl Info Re Util 770414 Request for Relief from ASME Code Requirements Re Inservice Insp Project stage: RAI ML19319D2281978-08-17017 August 1978 Requests Relief for Inservice Insp Program from ASME Section IWA-5210 Requirements.Requirements Impractical for Testing Repair Weld on Elbow in 14-inch Feedwater Line Connected to Steam Generator Feedwater Header a Project stage: Other ML20150F0691979-03-28028 March 1979 Requests Waivers from Parts of Section XI to ASME Code 1974 Edition.Wishes to Adopt Subarticles & Article 7,000 of ASME Code 1977 Edition.Needs Addl Guidelines Re Repairs,Mod & Replacement to Establish Inservice Insp Program Project stage: Other ML19250B8491979-04-0505 April 1979 Updates Re Insp of Stagnant Low Pressure Stainless Piping Containing Boric Acid Solutions.Util Will Perform Periodic Pressure Tests & Leak Detection to Monitor Piping for Intergranular Chloride Stress Corrosion Cracking Project stage: Other ML19256F8341979-12-0404 December 1979 Advises of NRC Position,In Response to 790725 Submittal Re Pump & Valve Inservice Testing Program.High & Low Pressure Interfaces W/Two or More Valves Shall Be Leak Tested Periodically.Requests Design Provisions Per Encl Project stage: Other ML19257C7731980-01-25025 January 1980 Responds to NRC 791204 Request for Addl Design Provisions & Test Methods Permitting Valve Leak Testing.Forwards Revision to Pump & Valve Test Program Pages & Discussion of Design Mods Necessary to Accomplish Alternative Test Method Project stage: Request ML19318C3271980-06-26026 June 1980 Application for Amend to License DPR-72,granting Waiver from Certain ASME Section XI Testing & Insp Requirements. Certificate of Svc Encl Project stage: Request ML19327A3821980-07-22022 July 1980 Forwards Fr Notice of Granting Relief from ASME Section XI Inservice Insp (Testing) Requirements by Permitting Use of Winter 1977 Addenda for Hydrostatic Pressure Test Project stage: Other ML19327A3841980-07-22022 July 1980 Notice of Granting of Relief from ASME Section XI Inservice Insp (Testing) Requirements by Permitting Use of Winter 1977 Addenda for Hydrostatic Pressure Test Project stage: Other ML19341C9481981-02-27027 February 1981 Forwards Annual Operating Rept,1980. Includes Personnel Exposure,Reactor Vessel Matl Surveillance Capsules, Production Facility Changes,Tests & Experiments & Steam Generator Inservice Insp Project stage: Other ML19341C9521981-02-27027 February 1981 Annual Operating Rept,1980. Includes Personnel Exposure, Reactor Vessel Matl Surveillance Capsules,Production Facility Changes,Tests & Experiments & Steam Generator Inservice Insp Project stage: Other ML20010G5951981-09-14014 September 1981 Requests Generic Relief from Hydrostatic Test Requirements of Article Iwc 5000 of ASME Section XI While Performing Work on Main Feedwater Piping Between Steam Generators & First Upstream Isolation Valves.Response Requested by 811015 Project stage: Other ML20031E3221981-10-0606 October 1981 Requests Relief from Requirements of Article IWB-2000 of ASME Section XI Re Ultrasonic Insp of Vessel Ring Forging to Support Skirt Weld.Insp Is Not Safe Due to High Radiation in Vicinity of Vessel Supports Project stage: Other 1979-12-04
[Table View] |
Text
.: -
A
+fng V
.k UNITED STATES j
NUCLEAR REGULATORY COMMISSION e
- p
. c WASHINGTON, D. C. 20555 j
g July 22, 1980 v
Docket No. 50-302 Mr. J. A. Hancock Director, Nuclear Operations Florida Power Corporation P. O. Box 14042, Mail Stop C-4 St. Petersburg, Florida 33733 Dear Mr. Hancock-Your letter of June 25, 1980, requested a relief from the ASME Section XI Code - 1974 Edition through Sumer 1975 Addenda. This is the current Addenda you are required to inspect against under our Rule,10 CFR Part j
50.55a(g). Specifically you requested relief from Article IWC 5000, Sub-section IWC 5220 of the ASME Code. You requested substitution of the
-Winter 1977 Addenda for the Sumer 1975 Addenda. The Summer 1975 Addenda requires the system hydrostatic test pressure to be a minimum of 1.25 times the system design pressure. The Winter 1977 Addenda allows the following exception: "The system pressure shall be the lowest pressure setting among the number of safety or relief valves provided for overpressure pro-tection within the boundary of the system to be protected."
The NRC has adopted the use of the Winter 1977 Addenda - Subsection IWC 5220 of the ASME Code and therefore we agree with your use of this portion of the Code to perform your current inspection of the suction side of the Make-up and Purification System of the Crystal River Unit 3 Nuclear Plant. We find that meeting the requirement of the Sumer 1975 Addenda is impractical, that the granting of this relief is authorized by law and will not endanger life or property or the common defense and security and is otherwise in the public interest giving due consideration to the burden upon the licensee that could result if the Summer 1975 Addenda - Subsection IWC 5220 were imposed on the facility. We therefore conclude that this relief complies with the requirements of 10 CFR 50.55a and that it involves no significant hazards consideration.
This relief applies specifically to the above pressure boundary where you performed a system modification during your shutdown subsequent to February 26, 1980.
You are not granted any other reliefs from the ASME Code 1974 Edition through Sumer 1975 Addenda, at this time.
A copy of the Notice of Issuance is enclosed.
Sincerely,
_./f s
Robert W. Reid, Chief Operating Reactors Branch #4 Division of Licensing
Enclosure:
Notice cc w/ enclosure: See next page 8008060NY L
s
Crystal River-3,50-302 Florida Power Corporation cc -/ enclosure (s):
Mr
- 5. A. Brandimore Mr. Robert B. Borsum Vice President and General Counsel Babcock & Wilcox P. O. Box 14042 Nuclear Power Generation Division St. Petersburg, Florida 33733 Suite 420, 7735 Old Georgetown Road Bethesda, Maryland 20014 Mr. Wilbur Langely, Chairman Board of County Commissioners Citrus County Iverness, Florida 36250 Bureau of Intergovernmental Relations U. S. Environmental Protection Agency 660 Apalachee Parkway Region IV Office Tallahassee, Florida 323M ATTN:
EIS COORDINATOR 345 Courtland Street, N.E.
Atlanta, Georgia 30308 Mr. Tom Stetka, Rssident Inspector U. S. Nuclear Hegulatory Commission Direc Technical Assessment P
o River Florida 32629 Office of Radiation Programs (AW-459)
U. S. Environmental Protection Agency Crystal Mall #2 Arlington, Virginia 20460 Crystal River Public Library Crystal River, Florida 32629 Mr, J, Shreve The Public Counsel Room 4 Holland Bldg.