ML20028F815
| ML20028F815 | |
| Person / Time | |
|---|---|
| Site: | 05000000, Perry |
| Issue date: | 03/13/1982 |
| From: | Weil C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| Shared Package | |
| ML20027A600 | List: |
| References | |
| FOIA-82-545 NUDOCS 8302040440 | |
| Download: ML20028F815 (2) | |
Text
Eis.11c R. b2 14
[g@ 'Mg[o Uf:lT E D ET AT E S s.
- e './ ~ r c
m nocstvf LT 9010 o, YA '.(
ct En t tLyn,ittiecis t:n37
%, ' C
/
8....
i m R 1 3 Gsi 1
IEMORANDUM FOR:
Region-111 Files RFW THRU:
Robert F. Warnick, Director, Enforcement and Investigation Staff FFOM:
Charles U. Weil, Investigator
SUBJECT:
PERRY NUCLEAR POWER PLANT, DOCKET NO. 50-440; 50-441 FOR*ER QUALITY CONIRCL INSPECTOR IN POSSESSION OF FALSE AWS CERTIFICATE
_P;e c eipt of Information On February 9, 1982, Bill Albert, Senior Resident Inspector (SRI) at Washington Nuclear Plant (WNP), Units 3 and 5, t elephoned Richard C. Knop, Branch Chief in Region III's Division of Project and Resident Programs.
advised Washington Public Power Supply System (WPPSS) had found Albert I
~
"a Quality Control inspector at VNP 3/5, in possession
~.
and of~ a f alsifjed ~AFeTican Welding Society (AWS) welding certificate, Jennings had been previously employed at the Perry Nuclear Fower Plant construction site.
Rerion III Action On February 11, 1982, Ibert was te]cphoned by Region III Investigator Albert auI8 sed WPPSS had r?cently received an allegation that C. H. Weil.
1979.
in possession of a f alse A AS certificate, dated November was NPPSS--ont act ed AWS and found AWS had uever cert ified Jennings for any J
c activity.
AWS presumed h
',had attended a seminar given by a
" fly-by-night out fit" and was_given the certificate for completing the resume WPPSS found he was employed by course.
In reviewing; News National Inspection and 'ConsuTt ants, a subcontract or to Newport Industrial Corporation, at the Perry site from June 1979 until January 1980.
WPPSS has notified National Inspection and Consultants of this mat ter.
oo Subsequently, Max L. Gil dner, SRI-Perry, was inf ormed of this inf ormation.
a:
Gildner made several inquiries and Icarned:
the
-O l
uas employed by National Inspection and Consultants at N
I'erry site from June 1979 until January 1980.
was certified, 7
g l
$<7 by National Inspection and Consultants, as a L'evel 2 irspector for oe y
magnetic particle and dye penetrant. Newport News Industrial Corpora-tion tested to Newport's Proc 1 ures__a_nd-successfully d
j
- OLLp passed the examinations.
Throughout,I e6p3cy.eiif his inspec-tions were reviewed by the. Newport Level 3 and'
~ work was y
did not perf orm any inspections found to be acceptable. [
at Perry requiring an AWS certificate.
. -.~.
- S rfi e.
- 6 b i c _';
t
,k I 1 $32 i
D i on 111. Files -
~ -
1
.~.
--s Also,'
~ micsed. approximately one half of the work days during the period June '- Septenber 1979 for a Workingmen's Con.pensation injury,. a bat bite, sustained at the Perry Plant.
In September 1979,.'Clevelsnd Electric Illuninating stopped all of, Newport's safety related work.
This 'st on work3 asted past l terminatic,n in January 1980.
There-fore,f
' actual field uork Ws limited while at Ferry.
s
==
Conclusion:==
This matter is considered closed for the following reasons:
t a.
did not require an AWS certificate.to work at Terry.
b.
f successfully passed the examination for his work at Perry.
c.
work at Perry was reviewed by his supervising Level 3
' 'and {
work was found to be acceptable.
d.
The vnount of actual field work completed by luaslimited.
=
- C}uirles H. Weil
~
Investigator cc:
R. L. Spessard R. C. Knop J. E. Konklin M. L. Gildner t'