05000293/LER-1981-045, Forwards LER 81-045/03L-0

From kanterella
(Redirected from ML20010E718)
Jump to navigation Jump to search
Forwards LER 81-045/03L-0
ML20010E718
Person / Time
Site: Pilgrim
Issue date: 08/28/1981
From: Machon R
BOSTON EDISON CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML20010E719 List:
References
81-202, NUDOCS 8109080196
Download: ML20010E718 (1)


LER-1981-045, Forwards LER 81-045/03L-0
Event date:
Report date:
2931981045R00 - NRC Website

text

..-

B05 f GN g6b s.

Edison amu PILGRIM NUCLEAR POwen STATION RFD #1 ROCKY HILL RCAO P LY M O U T H, MASSACHUGETTs 0236C R. D. M ACHCN

- ve 6 a.. o.s.. e a e.

..c.

Director Region I Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, PA 19406 Licensee Event Report 81-045/03L-0 Docket Number 50-293 License DPR-35 Gentlemen:

The attached Licensee Event Report (LER 81-045/03L-0) entitled " Control Rod Drive", is hereby submitted in accordance with the requirements of Pilgrim Nuclear Power Station Technical Specification 6.9.B.2.b.

If there are any questions on this subject, please contact us.

Respec ully submitt d, s

/

vc4c.cv,/

.f.

t R. D. Mp.'on Nuclear Operations Manager Pilgrim Station GGW:gf

Enclosures:

(3 copies)

LER 81-045/03L-0 cc: Director (40 copies)

Office of Management Information and Program Control U. S. Nuclear Regulatory Commission Washington, D.C.

20555 p\\19*i s.

c W'y( #

\\

s

, /,

- q.

se

/,.

\\

8109080196 810828 PDR ADOCK 05000293 S

PDR