Other: 05000346/LER-1981-055-03, /03L-0:on 810925 & 1001,detergent Waste Drain Tank & Pump Room Door Was Found Open.Caused by Personnel Fears That Broken Door Handle Would Prevent Exit from Room. Personnel Reinstructed & Door Latch Repaired, ML20004D033, ML20010A368, ML20011A873, ML20011A937, ML20011A941, ML20031H265, ML20052C189, ML20263R472, ML20263R474, ML20263R475, ML20263R477
|
MONTHYEARIR 05000266/19810041981-03-16016 March 1981 IE Insp Rept 50-266/81-04 on 810224-25.No Noncompliance Noted.Major Areas Inspected:Control Rod Drive & Position Indication Checks,Control Rod Worth Measurement & Reactor Shutdown Margin Determination Project stage: Request ML20008F5661981-04-14014 April 1981 Submits Comments on Emergency Response Facilities Implementation,In Response to NRC on post-TMI Requirements.Description of Instrumentation Sys & Design of Physical Structures Will Be Submitted by 810601 Project stage: Other ML20004D0331981-06-0101 June 1981 Forwards Conceptual Design for Interim Emergency Response Facilities Expected to Be Operational by 821001,in Response to NRC .Outline of Requirements & Design Encl for Preimplementation Review Project stage: Other ML20010A3681981-08-0303 August 1981 Notifies That Permanent Emergency Offsite Facility Will Be Located Adjacent to Util Headquarters Bldg.Location of Facility in Proximity to Util Headquarters Outweighs Disadvantages Resulting from Being 23 Miles from Plant Site Project stage: Other ML20031H2651981-10-21021 October 1981 Advises That Joint Powers Agency Representing Counties of Amador,Sacramento & San Joaqin Concurs W/Proposed Location of Emergency Operations Facility Project stage: Other ML20011A9411981-10-23023 October 1981 Advises That Ofc of Emergency Svcs Finds Proposed Emergency Offsite Facility Acceptable.Addl Work Needed on Remodeling & Refurbishing Facility Project stage: Other 05000346/LER-1981-055-03, /03L-0:on 810925 & 1001,detergent Waste Drain Tank & Pump Room Door Was Found Open.Caused by Personnel Fears That Broken Door Handle Would Prevent Exit from Room. Personnel Reinstructed & Door Latch Repaired1981-10-23023 October 1981 /03L-0:on 810925 & 1001,detergent Waste Drain Tank & Pump Room Door Was Found Open.Caused by Personnel Fears That Broken Door Handle Would Prevent Exit from Room. Personnel Reinstructed & Door Latch Repaired Project stage: Other ML20011A8731981-10-23023 October 1981 Advises of Acceptance of Proposed Location for Emergency Offsite Facility.Proposed Location Will Provide Ready Access by State Personnel & County Officials Project stage: Other ML20263R4771981-10-26026 October 1981 Location Sketch & Vicinity Map EOF and Office Buildings Project stage: Other ML20263R4741981-10-26026 October 1981 Training and Storage Building Project stage: Other ML20263R4751981-10-26026 October 1981 Smud Headquarters Building Project stage: Other ML20263R4721981-10-26026 October 1981 General Office Annex Project stage: Other ML20011A9371981-10-26026 October 1981 Submits Addl Info Requested in 810924 Telcon W/Nrc for Approval of Proposed Emergency Offsite Facility,Per NUREG-0737,Item III.A.1.2.Four Oversize Drawings Encl. Aperture Cards Are Available in PDR Project stage: Other IR 05000266/19820021982-02-11011 February 1982 IE Emergency Preparedness Appraisal Repts 50-266/82-02 & 50-301/82-02 on 820104-15 & 20.Major Area Inspected:Special Appraisal of Emergency Preparedness Program Project stage: Request ML20041B4911982-02-22022 February 1982 Discovery Progress Rept 5,per ASLB 811003 & 1105 Orders.Nrc Reviewed Wi Environ Decade 820118 Answers to Interrogatories.No Discovery Requests Received from Licensee or Intervenor.Certificate of Svc Encl Project stage: Request ML20050D8801982-03-26026 March 1982 Confirms 820326 Telcon Requesting 1-wk Extension to 820405 of Response to NRC Re Emergency Preparedness Appraisal.Extension Requested for Further Mgt Review of New Proposal Project stage: Other ML20050C7391982-03-31031 March 1982 Discusses Util Response Re Emergency Plan Training, Emergency Plan Implementing Instructions,Meteorological Instrumentation & Unusual Event Notification Procedures. Response Appears Acceptable Project stage: Other ML20050D9601982-04-0606 April 1982 Forwards Responses to NRC Discussing NRC 820104-15 Emergency Preparedness Appraisal.Requests That Item 7 of Encl 1 Be Reviewed by 820501,per Requirements of NUREG-0696 Project stage: Other ML20052C1891982-04-23023 April 1982 Requests Extension of 821001 Deadline for Completion of Emergency Operations Facility Per TMI Action Plan Item III.A.1.2.Extension Requested Due to Delay in Obtaining NRC Approval Project stage: Other ML20052C1291982-04-29029 April 1982 Ack Receipt of Cw Fay to Jg Keppler Re 820121 Emergency Preparedness Confirmation of Action Ltr.Matter to Be Reviewed at Future Insp Project stage: Other ML20069C7171982-07-15015 July 1982 Forwards Revised Description of Proposed Mods for Emergency Operations Facility for Review.Requests Date NRC Will Present Review to Commission Project stage: Other ML20058E0091982-07-16016 July 1982 Provides Solutions to Issues Arising in 820623 & 0708 Meetings Re Acceptance of Proposed Emergency Operations Facility Location Per TMI Action Item III.A.1.2 Project stage: Meeting ML20063N6281982-09-30030 September 1982 Forwards Addl Info Re Proposed Mods for Emergency Support Ctr Project stage: Other ML20079R8941983-03-30030 March 1983 Requests to Be Advised of Date & Time Commissioners Will Consider 820406 Request to Relocate Emergency Operations Facility at Corporate Headquarters Beyond Guideline Distance Contained in NUREG-0696 Project stage: Other ML20071L4641983-05-20020 May 1983 Requests Info Re Date,Time & Location for Commission Meeting on Emergency Operations Facility Location.Leave to Address Commission Requested Project stage: Meeting ML20072C5291983-06-16016 June 1983 Responds to Advising of Status of Util Request to Locate Emergency Operations Facility at Corporate Headquarters in Milwaukee,Wi.New Communication Apparatus & Revised Procedures Enhance Emergency Capabilities Project stage: Other ML20076B4491983-07-20020 July 1983 Forwards Draft Exercise Scope & Basic Senario Per 10CFR50,App E.Detailed Scenario Will Be Provided During Second Wk of Aug.Exercise Planned for Sept 1983.W/o Encl Project stage: Draft Other ML20085K6051983-10-14014 October 1983 Responds to Denying Concurrence W/Util Plans to Move Emergency Support Ctr from Two Creeks,Wi to Corporate Headquarters in Milwaukee,Approx 100 Miles from Facility. Potential Problems Overstated by NRC Project stage: Other ML20078P6961983-10-31031 October 1983 Response Opposing Atty General Bellotti 831007 Motion for Summary Disposition of State of Ma Contentions I-IV,Seacoast Anti-Pollution League 5 & New England Coalition on Nuclear Pollution 3,4,5,7,12 & 13.Certificate of Svc Encl Project stage: Other 1982-04-23
[Table View] |
Text
!
e suun SACRAMENTO MUNICIPAL UTILITY DISTRICT C) 6201 S street, Box 15830, sacramento California 95813; (916) 452 3211 August 3, 1981
'/.
gpp p /
/
/U N Uj;-) ih Y(3 9
AUG 10 7937 m =
DIRECTOR OF NUCLEAR REACTOR REGULATION u.s. %,o,%*"
- "'8 ATTENTION DARRELL G EISENHUT DIRECTOR DIVISION OF LICENSING e,,
3/
U S NUCLEAR REGULATORY COMMISSION
%g.Nr WASHINGTON D C 20555 DOCKET 50-312 RANCHO SEC0 NUCLEAR GENERATING STATION UNIT N0 1 TMI ACTION PLAN - ITEM III.A.l.2 In the District's letter of November 17, 1980, we indicated that the current Emergency Offsite Facility (E0F) location is at the California Division of Forestry Headquarters in Ione. The purpose of this letter is to describe the District's plan for a permanent E0F.
The District has recently purchased a facility acjacent to the SMUD Headquarters Building. One of the functions of this facility will be to house the permanent E0F. The District believes that the many advan-tages of proximity to all the resources available in the SMUD Headquarters Building outweigh the disadvantage of being located 23 miles from the Rancho Seco site. The permanent E0F is expected to replace the facility at Ione by October 1, 1982.
u
. Mattimoe Assistant General fianager and Chief Engineer OY$
/ C) 8108110362 810803 PDR ADOCK 05G00312 F