05000293/LER-1981-031, Forwards LER 81-031/03L-0

From kanterella
(Redirected from ML20009E799)
Jump to navigation Jump to search
Forwards LER 81-031/03L-0
ML20009E799
Person / Time
Site: Pilgrim
Issue date: 07/18/1981
From: Machon R
BOSTON EDISON CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML20009E800 List:
References
81-165, NUDOCS 8107280455
Download: ML20009E799 (1)


LER-1981-031, Forwards LER 81-031/03L-0
Event date:
Report date:
2931981031R00 - NRC Website

text

_ _ _ _ _ _

uG~

...b sosrcu Edison cemu PILGRIM NUCLEAR POWER STATION RFD #1 rocky HILL ROAD PLYMOUTH, MAssACHustTTs 02360 July 18,1981 R. D. MACHON BECo Ltr. #81-165

. m....................

.n

,_1 s

l

.D dO

2_ 8 a, ( ' h(

h Director, Region I Office of Inspection and Enforcement

/gI U. S. Nuclear Regulatory Commission l, -

A

\\jsA

    • r 631 Park Avenue 4fp King of Prussia, PA 19406 Y')

C Licensee Event Report 81-031/03L-0 5

cen DPR-35 i

Gentlemen:

The attached Licensee Event Report 81-031/03L-0, entitled " Main Stack Sample Pump", is hereby submitted in accordance with the requirements of Pilgrim Nuclear Power Station Technical Specification 6.9.B.2.b.

If there are any questions on this subject, please contact us.

Respectfully submitted, Nuclear Operations Manager Pilgrim Station MIM:ep

Enclosures:

(3 copies)

LER 81-031/03L-0 cc: Director (40 copies)

Office of Management Information and Program Control U. S. Nuclear Regulatory Commission Washington, D.C.

20555 6 'lI 8107280455 810718 PDR ADOCK 05000293 S

PDR