LER 81-031/03X-1:on 810512,following Reactor Trip,Rcs Radioiodine Content Exceeded Limit.Caused by Gas Leakage Through Fuel Cladding.Levels Decayed Off Below Limits.Tech Spec Revision Being Evaluated
ML20009D653
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 07/13/1981
From: Rowland M, Stotz J
TOLEDO EDISON CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML20009D650 List:
References
LER-81-031-03X, LER-81-31-3X, NUDOCS 8107240255
Download: ML20009D653 (2)


Text

U. 81 W

. JC FORf.1366 0 77)

LICENSEE EVENT REPORT CONTROL BLOCC l t

l l l l l e

lh (PLE ASE PRINT OR TYPE ALL REQUIRED INFORMATION)

I:l t l l 0l Ill_p l B l Sl il@l 01 O I -l 010101010 l - 101023]@l26 411 l 1 lT41PElJJ1 l@l LICENSE l

bl CAT bd l@

14 15 LICENSE wYdER 8 9 UCI NSEE COJE

,l:ltl

,"o% W @l0l510l0101314 l 61@l E

ed 40 0E' lINT5D ATE l 11218 l 11@l 01 71 Il80 3l 8 l 1 l@

14 75 REPORT DATE '

i 8 6J 61 GCCsET'.bv5Ea EVENT DESCRIPTION AND PROBABLE CONSECUENCES h l 3 2 l (NP-33-81-37) On May 12,1981 at 1457 hours0.0169 days <br />0.405 hours <br />0.00241 weeks <br />5.543885e-4 months <br /> following a reactor trip, a Reactor l

f-T~} l Coolant System (RCS) samp1' was collected in accordance with Technical Specif The analysis of the sample showed that the radio-iodine content j

3 ;4; j 3.4.8, Table 4.4-4.

At 2037 hours0.0236 days <br />0.566 hours <br />0.00337 weeks <br />7.750785e-4 months <br />, the level peaked at 1.52 uCi/gm dose equi- l

[ :Til I was approaching the limit.

There was no danger to the 1 i:

lell valent iodine I-131 with the limit being 1.0 uCi/gm.

There was no venting of con- l health and safety of the public or station personnel.

Io I7I I l

[yyiq l tainment gases until limits dropped below.the 1.0,uci/gm limit. 80 COMP. VALVE 7 89 CAUSE CALSE SUSCODE SUBCODE

$YSTEM COYPONE'.T CODE C00E CODE SLSC005 ygj g lR lC l@ l El@ W@ lF lU lE lL jX lX l@ g@ g @

12 12 18 is 20 REVISION 9 to 11 OCCgRRENCE REPORT 7 8 SEOLENTI AL No.

CODE TYPE REFORT NO W W 1 LER RO EVENT YE AR l0l3l1l l .,. - l l 0l 31 L--;

@ PE [8l1l 24 26 27 26 29 30 31 32 21 22 23

'SlSTSEE PO'I" Dis. ""sS$'iEE rdE[fC$n'se

'NIfo$ '

lN Q lN l@ lB l0 l1 l5 lg o'[lth'T -cVRS 22 S YArTN" 'fCTY$'

[_Zj@[Zj@

, lZl@ l Zh l10l0l0l 36 3 40 l C@

41 42 43 44 4r JJ 34 33 CAUSE DESCRIPTION AND CORRECTIVE ACTIONS h Some leakage is ]

t i l o l 11he cause was a slight leakage of gas tahrough the fuel cladding.

g l normal following a reactor trip when the gases in the fuel rods are further com j

The levels were monitored to ensure it decayed off to i

g ;by the contracting cladding.

A technical specification revision to change t!he limit is being evalu g l below limits. j g g ated per Facility Change Request 81-163. 80 f 8 9 03SCoVERY DESCRIPTION OTHER STATUS iC RY

% PC.'.E R l STA U l l Al@l Per Table 4.4-4 of Tech Spec 3.4.8

  • 1 5 [_XJ@ l 0l Ol 01@l"NA

'2

'Jnv,TY C& tnt LOCAT4ON OF RELEASE AVOUNT OF ACTIVITY l RELEASED OF RELE ASE I x^

8 La.]@ Laj@l NA to 18 44 I

45 80 7 4 9 PERSONNEL EXPOSURES NOVEER TYPE CESCRIPTICN l 1 7 I Ol 0l 0 hl NA PERbMNE L INJUR'ES NUVBE R CESCRlPTION  !

8 Ielelol@l

? 8 9 11 12 NA 60 LoS$ oF OR D AMAGE To F ActLITY TYPE CESCRIP TION 1 ao i o 1 zl@l u io 8107240255 B10713 NRC USE ONLY .,

1 PynuciTv PDR ADOCK 05000346 PDR g l lllilllIlll!l1 80 %

2 o issven@OEsCn.PricN

[_N_j l NA tis t39 7 8 9 10 (419) 259-5000, Ext. 243{2 NAug Or PREPAnER _

Mo m Rowland/Jan Stotz PHONE.

DVR 81.-072 _

O

TOLEDO EDISON COMPANY DAVIS-BESSE. NUCLEAR POWER STATION UNIT ONE PACE 2 SUPPLEMENTAL INFORMATION FOR LER NP-33-81-37 The dose equivalent I-131 exceeded 1.0 uCi/gm at 2037 hours0.0236 days <br />0.566 hours <br />0.00337 weeks <br />7.750785e-4 months <br /> on May~ 12, 1981, and was below that limit at 0350 hours0.00405 days <br />0.0972 hours <br />5.787037e-4 weeks <br />1.33175e-4 months <br /> on May 13, 1981. The total time dura-tion was approximately 9 hours1.041667e-4 days <br />0.0025 hours <br />1.488095e-5 weeks <br />3.4245e-6 months <br />. The maximum level was 1.52 uci/go.

Specific Activity Analysis:

Date Time Activity (uCi/gm) Dose Equivalent I-131 5/12/81 0500 0.132 1845 0.94 2037 1.52 5/13/81 0013 .~

1.14 0350 0.99 0555 0.74 0815 0.16 Designation of Apparent Cause of Occurrence: A reactor trip typically causes an

- iodine spike in the RCS. This is caused by a slight amount of gas leakage through the' fuel rod cladding due to transient conditions. The gas leak is a result of in-creased compression of gas by the contracting cladding. Any small defects would allow some gas to escape.

Analysis of Occurrence: There was no danger to the health and safety of the public or to station 1.arsonnel. There was no venting of containment gases until the levels had decayed. The highest levels found in any sample were still well below the allowa-ble limit of 60 uCi/gm per Figure 3.4-1 of Technical Specification 3.4.8.

Corrective Action: A corrective action is not applicable. Iodine spikes are typical following a reactor trip. No damage is indicated to the fuel. Monitoring of I-131 level was continued until it dropped below Technical Specification limit of 1 uCi/gm.

At 0555 hours0.00642 days <br />0.154 hours <br />9.176587e-4 weeks <br />2.111775e-4 months <br />.on May 13, 1981, the level dropped to .74 uCi/gm. A Technical Specifi-cation revision to change the limit is being evaluated per Facility Change Request 81-163.

Failure Data: There have been two previous reports of high iodine levels - see Licensee Event Reportis NP-33-80-114 (80-088) and NP 33-81-15 (81-016).