IR 05000344/1981016

From kanterella
(Redirected from ML20009A921)
Jump to navigation Jump to search
IE Insp Rept 50-344/81-16 on 810615-19 & 23.No Noncompliance Noted.Major Areas Inspected:Security Plan,Access Control, Detection Aids,Test & Maint & Security Organization.Details Withheld (Ref 10CFR2.790)
ML20009A921
Person / Time
Site: Trojan File:Portland General Electric icon.png
Issue date: 07/09/1981
From: Ivey L, Mcqueen A, Schuster M
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
Shared Package
ML19277A033 List:
References
50-344-81-16, NUDOCS 8107140496
Download: ML20009A921 (1)


Text

-

.

'

.

The infermation on this page is considered to be appropriate for public disclosure pursuant to 10 CFR 2.790.

U.S. NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT Region V Report No. 50-344/81-16 (IF-V-447)

Docket !!o. 50-344 License No. npp_1 Safeguards Group a

Licensee:

Portland General Electric Company 121 S. W. Salmon Street Portland. Orecon Facility Name:

Tro.ian Nuclear Plant Inspection at:

Prescott. Oreaon Inspection Conducted: June 15-19 and 23.1981 Date of Last physical Security Inspection Visit:

March 16JA 1QR1 Type of Inspection:

Ifnannnunrod rnntino. nhvcical cornritv

. _ _.

A[

Ju/s # /98/

Inspectors:

a e-L.

. I'

P sica'l secti y Inspector 4 ate' Signed

,

.D Jotv 2 / W/

m (

A. D. McQueen,' Physical fecurity Inspector Date Signed Date Signed 7k/W Approved by:

&b O M. D. Schuster, Chief, Physical Security Section Date Signed Ir spection Summary:

.

Areas Inspected:

Included a review of: Security Plan; Security Organization; Access Control (Identification., Authorization and Badging),; Access Control (Search); Access Control (Escorting); Access Control (Vital Area); Detection Aids; Test and Maintenance; and, Locks, Keys and Combinations.

The inspection involved 72 inspector hours onsite by two NRC inspectors. The inspection was started during regular hours and 10 hours1.157407e-4 days <br />0.00278 hours <br />1.653439e-5 weeks <br />3.805e-6 months <br /> were conducted ddring off shift periods.

Results: The 'icensee was found to be in compliance with NRC requirements within the nine areas examined during this inspection.

8107140496 810710 PDR ADOCK 05000344 O

PDR

,, _ _

._.

_

.. _ _

.

_

_ _ _ _.

-