IR 05000344/1981031

From kanterella
Jump to navigation Jump to search
IE Insp Rept 50-344/81-31 on 811130 & 1201.No Noncompliance Noted.Major Areas Inspected:Observation of IAEA Ad Hoc Insp. Details Withheld (Ref 10CFR2.790)
ML20039C427
Person / Time
Site: Trojan File:Portland General Electric icon.png
Issue date: 12/23/1981
From: Nelson G, Norderhaug L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
Shared Package
ML20039C423 List:
References
50-344-81-31, NUDOCS 8112290337
Download: ML20039C427 (2)


Text

~

.

t hiATERIAL TRAMMITTED ltEREYdTH COMWM

2390 INFORWA110N

  1. .~

The information on this page is considered to be appropriate for public disclosure pursuant to 10 CFR 2.790.

U.S. NUCLEAR REGULATORY COMMISSIbN

!

0FFICE OF INSPECTION AND ENFORCEMENT

REGION V

Report No.

50-344/81-31 (IE-V-471)

NPF-1

50-344 License No.

Safeguards Group Docket No.

Licensee:

Portland General Electric Company 121 S. W. Salmon Street Portland, Oregon 97204 Facility Name:

Trojan Nuclear Power Plant Inspection at:

Trojan NPP, Rainier and PGE Co. Corp. Hdgrs., Portland, Oregon November 30 and December 1,1981 Inspection conducted:

November 18-20, 1981 Date of Last Physical Security Inspection Visit:

Type of Inspection:

Announced Special Safeguards

/ 2 4f' 8/

Inspector:

N M 'dnv Date Signed G. B. Nelson, Chemist ggg

Approved by: j L. R. NSrferhaug, Chief,4 a b s Bra"nch Date Signed

-

Inspection Summary:

!

Areas Inspected:

Observation of IAEA ad hoc inspection to audit the licensee'_s

!

records and reports, to replace film in two surveillance cameras in the SFP bay and to evalue.te a Night Vision Device as a means of detecting Cerenkov Radiation i

l in the SFP.

The inspection involved 9 inspector-hours onsite.

Results: Within the scope of this inspection, no items of noncompliance were identified.

MATERIAL TRAMMITTED HEREYCTH CWIT 2390 ifWORMAT10fi 8112290337 811223 PDR ADOCK 05000344 PDR G