IR 05000344/1981032
| ML20040B876 | |
| Person / Time | |
|---|---|
| Site: | Trojan File:Portland General Electric icon.png |
| Issue date: | 01/14/1982 |
| From: | Brock B, Norderhaug L, Wieder A NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | |
| Shared Package | |
| ML20040B870 | List: |
| References | |
| 50-344-81-32, NUDOCS 8201260503 | |
| Download: ML20040B876 (1) | |
Text
-_
_
_
_. _ -
-
._
__
__. _ _ _ _
.-
_
-
,
i
.
The information on this page is considered to be appropriate
for public disclosure pursuant to 10 CFR 2.790.
.
U.S. NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT Region V Report No. 50-344/81-32 (IE-V-472)
>
I Docket No. 50-344 License No.NPF-1 Safeguards Group
Licensee: Portland General Electric Company i
121 S. W. Salmon Street i
Portland, Oregon 97204
)
Facility Name: Trojan Nuclear Power Plant Inspection at: Trojan NPP, Rainier and PGE Co. Corp. Hdgrs., Portland, Oregon Inspection Conducted: November 18-20, 1981 Date of Last Material Control and Accounting Inspection September 18-20, 1978
,_
.
Type of Inspection: Unannounced
,
,,,
Inspectors:
/ /M M
B. L. B ck Chemist
'Date"Signcd A hPH
'A. V. Meter, AuditoW
,W
!l/ YlTv Date Signed Date Signed c
'
/uglh i
/// efft i_
Approved by:
.
,
1.. R. (Nohprhaug>Ctiief, Safeguards Branch Date Signed i
<
)
Inspection Summary:
I
,
j Inspection of November 18-20, 1981 (Report No. 50-344/81-32 (IE-V-256))
l
!
Areas Inspected: Routine, material control and accounting inspection covering the following areas: Facility Organization and Operation, Measurement and
Controls, Shipping and Receiving, Inventory, and Records and Reports.
Ytte inspection involved 33 inspector-hours onsite by two NRC inspectors.
I Results:
No items of noncompliance or deviations were identified.
!
,
!
e201260sua e2011s PDR ADOCK 05000344
- -
-
..
, _ _,
-. _, _
.
. -
- - ~..
-
_, -, -. _..,