IR 05000344/1981022
| ML20011A960 | |
| Person / Time | |
|---|---|
| Site: | Trojan File:Portland General Electric icon.png |
| Issue date: | 10/22/1981 |
| From: | Mortensen W, Schuster M, Schwan C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | |
| Shared Package | |
| ML20011A956 | List: |
| References | |
| 50-344-81-22, NUDOCS 8111030410 | |
| Download: ML20011A960 (1) | |
Text
.
.
The information on this page is considered to be appropriate for public disclosure pursuant to 10 CFR 2.790.
U.S. NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT Region V
,
Report No.
50-344/81-22(IE-V-461)
Docket No.
50-344 License No.
NPF-1 fafeguards Group Licensee:
Portland General Electric 121 S. W. Salmon. Street
.
Portland, Oregon
_
Facility Name:
Trojan Nuclear Plant
,__
Inspection at:
Prescott, Oregon
,
_
Inspection Conducted:
September 21-25, 1981 Date of Last Physical Security Inspection Visit:
June 19, 1981 Type of Inspectiony,
unannounced, Regjne, Physical Security
.WLLlWl f
=>
Inspectors:
' W.
P. Mortensen, fysica! Security 7nspect9e Date Signed
/A;, //
)
abalei
~
C. A. Schwan,* Physical Security Inspector Date Signed
~~
Date Signed
.
Date Signed
'
.
Approved by:
-
"&
/$
)
M. D.' Schus'ter, Chier, Phgal Security Section Date Sign'ed Summary:
Areas Inspected:
Included a review of Security Management; Security Personnel; Security Pesponse; Records and Reports; Testing and Maintenance; Vital Area Barriers; Protected Area Detection Aids; Licensee Action on Previous Inspection Findings; and Independent Effort. The inspection involved 60 inspector hours on site by two NRC inspectors. The inspection was started and conducted during regular hours.
8111d30410 811 26 ie areas examined during this inspection.
'
PDR ADOCK 05000334 O
,
__
, _ _ _
_
_
-