05000325/LER-1981-030-03, /03L-0:on 810219 & 0317,switch 1 of Reactor Pressure Switch 1-B21-PS-N021D Model 288 Would Not Actuate. Caused by Switch Actuation Screw Out of Adjustment.Screw Adjusted After First Event.Linkage Adjusted After Second

From kanterella
(Redirected from ML20003D601)
Jump to navigation Jump to search
/03L-0:on 810219 & 0317,switch 1 of Reactor Pressure Switch 1-B21-PS-N021D Model 288 Would Not Actuate. Caused by Switch Actuation Screw Out of Adjustment.Screw Adjusted After First Event.Linkage Adjusted After Second
ML20003D601
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 03/20/1981
From: Pastva M
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20003D598 List:
References
LER-81-030-03L, LER-81-30-3L, NUDOCS 8103270757
Download: ML20003D601 (2)


LER-1981-030, /03L-0:on 810219 & 0317,switch 1 of Reactor Pressure Switch 1-B21-PS-N021D Model 288 Would Not Actuate. Caused by Switch Actuation Screw Out of Adjustment.Screw Adjusted After First Event.Linkage Adjusted After Second
Event date:
Report date:
3251981030R03 - NRC Website

text

,nm LICENSEE EVENT REPORT O

  • CONTROL BLOCK: l l

l l

l l lh (PLEASE PRINT OR TYPE ALL REQUIREO INFORMATIONI 1

6

~!

'lTIT 'N IC la IC IP 11 l@l ol ol -l ol ol ol ol ol -l of ol@l4 11 11 11 li l@l I

l@

l 3 8 9 LICENSEE Co0E 14 lb uCENsENUMUER 23 26 UCENSE TYPE Jo 67 CAT ta CON'T

" ' "J Lt_l@lo I s to I-10 13 12 is l@l ol 21 tl 91 81 1J@l ol,I 21 ni al, l@

JoR a '

i e

G0 el coCKET NUMWER 6d 63 EVENT oATE 74 7$

REPoHToATE 80 EVENT DESCRIPTION AND PROBAOLE CONSEQUENCES h

' o 2 lDurb the nerfor mnce of Eccs pencPnr i nu proc

,,rn ch nn,,1 rn14kvar4nn nna 1:,,m e 4 rn ni j

. g l Test, PT 3.1.14PC, switch number 1 of reactor pressure switch,1-B21-PS-N021D, model l

On 3-17-81 during the functional test of this switch, l

g l number 288 would not actuate.

o s IPT 3.1.14P, it again would not actuate. This switch provides an open signal to the l

ILPCI injection valve and a RHR pump start at 410 psig + 15 psig in conjunction with l

o a ll RTTl l> 2 psig in the drywell. This event did not affect the health or safety of the public4 l o pl-l l Technical Specifications 3.3.3, 6.9.1.9b l

Coot ooE su C E COMPONENT CooE sua dE su E

l Il Bl@ 'd@ l A l@ lI lN I S lT lR lU lh l Sl@ W @

,7 8

9 10 11 12 13 18 19 20 stoutNTIAL '

OCCURRENCE REPORT REVistoN LERrRo EVENT YEAn REPORT No.

CoDG TYPE No.

(

,,_l218l1l b

l 0l 3l 0l y

l0 l3 l y

l-- j l0 l l

h, reg 22 23 24 26 27 28 23 30 31 32 U

A N

PLANT ME hours 22 sB B PoR 8.

sUPPLIE MAN FACTURER gl34Cl@

l 'Z lg l36Zl@ l0l0l0l0l lY l@

lY l@

lN l@

l B l 0 l 8 l 0 l@

33 36 37 40 41 42 43 44' 47 CAUSE DESCRIPTION AND CORRECTIVE ACTIONS @

After the I

g l Both events resulted from the switch actuation screw out of adiustment.

i i l first event, the screw was readjusted and the instrument calibrated. declared ener-I g l able and' returned to operation. Following the 3-17-81 cvent, the switch actuation I

g l linkage was adjusted to provide a normal-operating band and the switch was Calibrated,l 1 declared operable and returned to operation.

4 a s oTwEnsTArus @EksCoSOY ciscovERY cEsCRiPrioN @

'si"2NE C

sPowtR NA l

l B l@l Periodic Test I

l,F_,,,l@ l 0 l 9 l 6 l@l s s so 12 n

44 as 4s ag,,,,,ig r

RELEAsEf., oP RELE AsE AMOUNT oP ACTIVITY LoCATloN oP RELEM.E l

l NA l

l NA [Z_l@ l Zl@OEs l

t a nRsoNNEt Expos oEsCRiPrioN @

NuMeER TYPE I

l0l0l0l@lZl@l NA i 7 nRseNN A'iN;u'!,Es 10 l 010 l@oEsCRirneN@

NuMsER I

l NA i R 80 7

8 9 11 12 Loss or on oAMACE To FACIUTY TYPE

DESCRIPTION

I lZj@l NA i 9 r

e9 ia NRC uSr. Onty isNsut @oEsCRirfioN@

l MA i

11l1111111IlII 2 o 6s as so ;

l ee io (919) 457-9521 8103 2 7 ONAuE Or PREPAnEn M J Paseva Jr-rsONE:

757

1 LER A'1TACHMENT - RO #1-81-30 Facility: BSEP Unit No.1 Event Date: 2-19-81 Both of these events resulted from the NO21D instrument switch number 1 actuation screw out of adjustment. After the first event the switch adjustment screw was readjusted and the instrument was recalibrated according to plant procedures and returned to service. Following the 3-17-81 cvent, an inves-tigation determined that the actuation. screw adjustment band was not sufficient to allow for operation of the switch within its calibration range, taking into-account normal instrument drift encountered by the. instrument..The switch actuation linkage and the switch actuation screw were then readjusted to allow sufficient linkage movement and reaction with the screw to permit calibration of i

the instrument closer to the center of its specified operating band. The switch was then tscalibrated and retu'rned to operation.

~ l, A review of the calibration records for this instrument shows that from 8-7-78 up to the 2-19-81 event, no switch out of adjustment or failure to operate events had occurred. This instrument is presently on a quarterly calibration and monthly functional test schedule to ensure proper maintenance and operation.

As a result of the 3-17-81 event, the N021D instrument will be calibrated weekly for the next month to ensure no further problems exist with its proper This and other similar instruments are scheduled to be replaced with operation.

anolog' type instrumentation during the next Unit No.1 outage, which is expected to prevent future occurrences.similar to that reported here.

4,g,,

L

('