ML20003D598

From kanterella
Jump to navigation Jump to search
Forwards LER 81-030/03L-0
Date released: 01/17/2020 Download: ML20003D598


LER 81-030/03L-0:on 810219 & 0317,switch 1 of Reactor Pressure Switch 1-B21-PS-N021D Model 288 Would Not Actuate. Caused by Switch Actuation Screw Out of Adjustment.Screw Adjusted After First Event.Linkage Adjusted After Second
ML20003D601
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 03/20/1981
From: Pastva M
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML20003D601 (2)
Forwards LER 81-030/03L-0
ML20003D597
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 03/20/1981
From: Dietz C
CAROLINA POWER & LIGHT CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML20003D597 (1)