05000325/LER-1980-061-01, /01T-0:on 800804,per IE Bulletin 80-17 Review of Control Rod Driveline Piping,Found Piping & Support Testing Required by IE Bulletins 79-07 & 79-14 Had Not Been Performed on Reactor Controls Inc Piping

From kanterella
(Redirected from ML19344A782)
Jump to navigation Jump to search
/01T-0:on 800804,per IE Bulletin 80-17 Review of Control Rod Driveline Piping,Found Piping & Support Testing Required by IE Bulletins 79-07 & 79-14 Had Not Been Performed on Reactor Controls Inc Piping
ML19344A782
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 08/16/1980
From: Tollison A
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML19344A781 List:
References
IEB-79-07, IEB-79-14, IEB-80-17, LER-80-061-01T, LER-80-61-1T, NUDOCS 8008220198
Download: ML19344A782 (2)


LER-1980-061, /01T-0:on 800804,per IE Bulletin 80-17 Review of Control Rod Driveline Piping,Found Piping & Support Testing Required by IE Bulletins 79-07 & 79-14 Had Not Been Performed on Reactor Controls Inc Piping
Event date:
Report date:
3251980061R01 - NRC Website

text

.

s.11)

LICENSEE EVENT REPORT CONTROL BLOCK: l l

l l

l l

l (PLEASE PRINT OR TYPE ALL REQUIRED INFORMATION) l 6

foTil I N I C I B 1 E 1 e I i l@l 0 l01-l 010101010 l-1010 I@l 4l 1l 1l 1l 1[gl l

lg 7

8 9 LICENSEE CODE 14 15 LICENSE NUMBER 25 26 LICENSE TYPE.50 57 CAT 68 CON'T 3 uRCl l X @l 0 l 5 l 0 l - l 0 l 3 l 2 l 5 @l 0 l 8 l 014 l 8 l 0 l@l0 l 8 l1 16 l 8 l0 "E'

I0l11 7

8 60 61 OOCKET NUMBER 68 69 EVENT OATE 74 75 REPORT DATE 80 EVENT DESCRIPTION AND PROB ABLE CONSEQUENCES h I O l 2 l l As a result of our review or the CRD piping in conjunction with IE Bulletin 80-17, it [

l o 13 l lwas determined that piping and support testing as required by IE Bulletins 79-07 and l79-14 had not been performed on CRD piping designed and installed by Reactor Controls,

Io I4 l loIsl l Incorporated. While performing the required testing, several supports both inside and[

l o is l l outside the drvwell were determined to be inadequate under the worst case condition.

l l 0 l 7 l l LER 2-80-55 addressed a similar problem with the CRD piping.

[

' Technical Specifications 6.9.1.81 1

g o is ; l 80 7

8 9 E

CODE S SC E COMPONENT CODE SUB OO"E S

E lOl91 l Rl B l@ W@ W@ l Sl Ul Pl Oi Rl Tl@ l B l@ l Z l@

j 7

8 9

10 11 12 13 18 19 20 SEQUENTIAL OCCURRENCE REPORT REVISION LE R/Ro EVENT YEAR REPORT NO.

CODE TYPE N O.

@ RE l8 l0 l l-l l0 l6 l1 l y

l0 l1 l lTl l-l y

21 22 23 24 26 27 28 29 30 31 32 N A O

O P NT ME HOURS 22 S8 IT FOR 8.

UPPLIE MANUFACTURER l F lgl34F [g l35C lg l36Zl@ l 0 l3 l 5 lT l lY l g l Nl g l Xl g lR l1 l4 l0 lg i 33 37 40 41 42 4

4 47 CAUSE DESCRIPTION AND CORRECTIVE ACTIONS h l3joj,All supports which have been found to be inadequate have been modified as required l

r lijil lby an engineering analysis, I

li121l I

11 131 I I

li te l l 80 7

8 9 ST S

% POWER OTHER STATUS IS RY DISCOVERY DESCRif flON 11 15 l l Hl@ l0 l 0 l 0 lgl NAl lCl@lSpecialTest/ Inspection l

A TivlTY CO TENT nELE ASED OF RELEASJ AMOUNT OF ACTIVITY LOCATION OF RELE ASE l

"A l l

NA l

li 161 l Zl @ l Z l@OES PERSONNEt Execs DESCRi,TiO~ @

NuM8ER TvPE NA l

l1l7ll0l0l0l@lZl@l

,ERSONNE t iN2u' RIES DESCRi,TiCN@

NuM8ER NA l

li la I ! 0101 Ol@l 7

8 9 11 12 80 LOSS OF OR DAMAGE TO FACILITY Q fvPE OESCRIPTION v

"^

l Lt.hJ LzJ@l I

& 9 10 30 s^ sooses CESCRIPTION iSSy4@i

,,,,,,,,,,,,l; i

i2iOi 7

8 9 to 68 69 80 3 A.C. Tollison, Jr.

919-457-9521 o

NAME OF PREPARER PHONE:

a g, LER ATTACHMENT - RO # l-80-61 Facility:

BSEP Unit No. 1 Event Date: 8-16-80 During an investigation of the CRD system design in conjunction with IE Bulletin l

80-17, it was recognized that the CRD system had been omittpd from the scope of work performed to meet the requirements of IE Bulletics 79-07 and 79-14.

As-built verfication of the piping and hangers and reviews of the piping and hanger analysis was begun. It has been determined that fcur supports outside the. Unit No. 1 drywell and thirteen supports inside the drywell could exceed structural integrity under the worst case conditions.

The inspection of the Unit No. 1 CRD system is complete and the analysis of the as-built data is in progress. The Unit No. 2 CRD system is currently being inspected. Although the analysis is not complete, it is expected that the same supports found deficient on Unit No. 1 will be found deficient on Unit No. 2 based on unit similarity.

The principal cause for the inadequate supports is the original design deficiencies contained in the support structural analysis relative to the loads imposed by the pipe stress analysis. Additionally, as-built deviations from the designed support configurations have contributed to the degraded condition of the supports.

The piping stress analysis and the as-built condition of the piping have been reviewed and no deficiencies relative to IE Bulletins 79-07 and 79-14 were found.

Supports laund deficient will be strengthened to meet the analysis requirements.

All inaccessible piping and supports within the drywell will be analyzed and, as required, appropriate modifications to prevent failure will be complated prior to startup of each unit. Other supports essential for safe shutdown which could exceed structural integrity will be modified prior to startup.

Completion of the analysis outside the drywell will be pursued on an expedited basis with all required modifications completed prior to December 31, 1980.

.o_m2 3,