05000293/LER-1980-053-03, /03L-0:on 800814,HPCI Snubber 23-3-36 Was Found to Be Inoperable.Caused by Low Reservoir Fluid.Analysis by Engineering Dept Underway

From kanterella
(Redirected from ML19343A200)
Jump to navigation Jump to search
/03L-0:on 800814,HPCI Snubber 23-3-36 Was Found to Be Inoperable.Caused by Low Reservoir Fluid.Analysis by Engineering Dept Underway
ML19343A200
Person / Time
Site: Pilgrim
Issue date: 09/12/1980
From: Mcloughlin M
BOSTON EDISON CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML19343A199 List:
References
LER-80-053-03L, LER-80-53-3L, NUDOCS 8009160402
Download: ML19343A200 (1)


LER-1980-053, /03L-0:on 800814,HPCI Snubber 23-3-36 Was Found to Be Inoperable.Caused by Low Reservoir Fluid.Analysis by Engineering Dept Underway
Event date:
Report date:
2931980053R03 - NRC Website

text

C'30C~"3CD (7 77) rs LICENSEE EVENT REPORT

()

CONTROL BLOCK:

l l

l l

l lh (PLEASE PRINT 03 TYPE ALL REQUIR2D INFCRMATIONI 6

f'0IIl l Ml Al P l P l Sl 1lgl150 l 0 l -l 0 l 010 l 0 l 0 l - l 0 l 0 l@l 4 l 1 l 1 l 1 l 1 l@l l

lg 7

8 9 LICENSEE CODE 14 UCENSE NUMBER 25 26 LICENSE TYPE JO SiCAF58 CON'T

,"o,y l L ]@l 0l 5 l 0 l - l 0 l 2 l 9 l 3 )@l 0 ] 8 l 1 l 4 l 8 l 0 l@l 0 l 9 l 1 l 2 l 8 l 0 l@

1011l

-?

8 60 61 DOCKET NUMBER 68 69 EVENT DATE 74 75 R EPORT DATE 80 EVENT DESCRIPTION AND PROBABLE CONSEQUENCES h 1012l l On August 14 and September 7.

1980,HPCI Snubber #23-3-36 were determined to be l

lOl3l l inoperable. The snubber is located On the HPCI Turbine Exhaust Line. On August I

1014 l l 14 during a scheduled visual surveillance inspection the snubbers fluid reservoir I 10 l s i I was low. A subsequent lockup test of the snubber failed.

On Sept. 14 1980 durinal 10 ls l l a routine plant tour the snubber was found severed. On both occasions an in-kind l El replacement was installed and the HPCI system returned to service.(Previously re-l l0tol i lated LER was80-034 /03L)

I 80 7

8 9 E

CODE SUSCO E COMPONENT CODE 5 BCODE SU E

10191 i Sl Flh Wh l B lh lS lU lP l0 lR lT lh lD lh l Zlh 7

8 9

10 11 12 13 18 19 20 SEQUENTIAL OCCURRENCE REPORT REVISION LER/RO EVENT YEAR REPORT NO.

CODE TYPE N O.

h yVE l218l0l j.__ l l0 l5 l3 l y

l0 l3 l lLl l-l l 0l aE 22 23 24 26 27 28 29 30 31 32 KN A ON ONP NT ME HOURS 22 S8 I FOR 8.

SUPPLIE MANUFAC RER l A lgl34Fl@

lZl@

W@

l 0 l 0 l 0 lg_j lN l@

lN ]@

l Al@

l B l 2 10 l9 l@

J3 35 M

31 40 41 42 43 44 47 CAUSE DESCRIPTION AND CORRECTIVE ACTIONS h 1 i l 0 l l A transient analysis has been undertaken to provide correlation between actual and I

g l calculated system loading. Temporarily,a 20 KIP snubber has been added to the system 1-I i 121 1 P ping but a permanent fix is dependent On the results of the current analysis. A l

i l i I a l l request to expedite this analysis has been issued to the Engineering Department.

l l

Li_J,4 ] I 80 7

8 9

$A

% POWER OTH E R STATUS OtS Y

DISCOVERY DESCRIPTION lTTsl W@ l1 l o lo l@l N.A.

l y @l Routine Testing l

ACTIVITY CO TENT r,ELEASED OF RELEASE AMOUNT OF ACTIVITY LOCATION OF RELEASE N.A.

l N.A.

l g [_Z_] h W@l PtRSONNEL EXPOSURES NUMBER

DESCRIPTION

y ] 0 l 0 l 0 lhlTYPEZlhl N.A.

l i

PERSONNE L INJURIES l

NUMBER DESCRIPTtON N.A.

l g l0l0l0l@l 7

8 9 11 12 80 LOSS OF OR OAMAGE TO FActLITY Q I

TY8E

DESCRIPTION

v N.A.

l l 1 l 9 l l Z l@l 7

8 9 to 80

[.2_1,O_l {_N,fhl E7CRIPTION @

N.A.

l lllllllllllll}

8009160 NRC uSE ONLY ISSUE D

'T 8 9 10 69 69 80 3 Mr. M. Thomas McLoughlin 617-746-7900 o

NAME OF PREPARER PHONE: