LER 80-078/01T-0:on 801030,review of Results of Salt Svc Water Sys Per IE Bulletin 79-14,indicated Design Deficiency. Caused by Installation of Salt Svc Water Anchor Point Outside Area Tornado Missile Barrier Protection
ML19339C766
Person / Time
Site: Pilgrim
Issue date: 11/13/1980
From: Mcloughlin M
BOSTON EDISON CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML19339C765 List:
References
IEB-79-14, LER-80-078-01T, LER-80-78-1T, NUDOCS 8011190411
Download: ML19339C766 (2)


Text

u sL gl3 'J & L$ WR4811OC@%QT@CU GEC823D (7.nl nU L.lCENSEE EVENT REPORT

, CONTROL BLOCK: l i

l l l l l lh e

(PLEASE PRINT OR TYPE ALL REQUIRED INFORMATION)

I ll0

'7 l1*4l l9 Ml Al PlPlSl1 LICENSEE CODE 14 l@l 15 0 l0 l- l 0 lUCENSE0 l 0 NUMBER0 l 0 l - l 0 l 025l@l26 4 l UCENSE 1 l l l 1TYPE l 1J0l@l57 CAT l Sa l@

CON'T

'l O l 11

? 8

"'[n"CE C

60 Il hl 0 l 5DOCKET 61 l0 l-NUM8ER lo l2 l9 l3 hl 1 EVENT 68 69 lo IlOATElnl8l0 hl1 l1 l1 74 75 l1 IA l n 80l@

REPORT OATE EVENT DESCRIPTION AND PROSA8LE CONSEQUENCES h

,10121 l On October 30, 1980 the ORC reviewed the results of an ann 1vn4n nf eko 9,le l

.[O la l i Service Water System conducted in response to IE Bulletin 79-14. The results l 7;g [ indicated that a design deficien-y existed because of the installation of a SSW l LO t s l l anchor point outside the area's tornado missile barrier protection. (Refer to 1 IO is I l attachment for additional details). I 10171 l I 10!81I l 7 8 9 80 E COE SUSCODE CCMPONENT CCOE SL8 CODE SU E lOl9l l C l F l h Wh l A l h l S l N l P l 0 l R I T lh l X lh [2,,,) h ' :"

7 8 9 10 11 12 13 19 20

_ SEQUENTfAL OCtuR Rt . E REPCRT REVISION L EVENT YEAR R EP7RT NO. CODE TYPE NO.

ag l218 l 0l

@ su'ER/RO M

,,,. 22 l-l 23 l017l8l 24 26 l/l 27 I ol li 28 29

[,,r_j 30 l-l 31

[,g_j 32 TKN AC ON ON Pt.A T M HOURS S8 i POR 5 8. SUP U MAN P C RER Ir 3J l@[z,,,jh 34 7

l35 lh 7

l36 lh 3l70 l 0 l 01040l lY lh l N lh l A lh 41 42 43 l44B l1 l 3 l047l@I '

CAUSE DESCRIPTION AND CORRECTIVE ACTIONS l

[i l O l l To correct this design deficiency the seismic anchor was relocated within ekn I 1 i t i ; imissile protective barrier. I li121 I I tilli l l 11 14 1 l I 7 8 9 80 STA  % PCWER OTHER STATUS 015 O ERY OISCOVERY DESCRIPTION lt isl W h l1l0l0lhl NA l lnlhl IE Bulletin 79-14 l A T1VITY CO TENT MELEASED OPRELEASE AMOUNT OF ACTIVITY LOCATION OF RELEASt NA l l NA li is l8 l9 z l @ l10z l@l 7 11 44 45 80 l

PERSONNEL EXPOSURES NUMBER TYPE DESCRIPTION li l 71 10 I 0101@lz l@l NA l PERSONNE L INJURIES NUMBER CESCRIPTION@

li l a l l 0 l 0 l Oj@l NA l 1 8 9 11 12 80 LOSS OP OR OAMAGE TO PACILITY TYPE OESCRIPTION NA l l 1 l 9 l l z l@l10 7 8 9 80 PU8LICITY NRC USE ONLY DESCRl* TION 45 ISSU ED

[,2,j,o_j [,N jhl 8 01 ]19 0$ i NA l l l l l l l l l l l l l l :}

7 89_ 10 68 69 80 3 4ASLSv1A__suswe 6L_

BOST01: EDISON COMPAhT ,

PILGRIM h'JCLEAR POWER STATION '

DOCKET NO. 50-293

-Attachment to LER 80-078/0lT-0 Description On October 30, 1980, tha ORC reviewed the results of an analysis of the Salt Service Water (SSW) System conducted in response to IE Bulletin 79-14.

The review indicated that the original seismic analysis for the Salt Service Water System took credit for a seismic anchor located beyond the outboard isolation valves. The seismic anchors in this case are the screen wash pumps.

However, recent analyses for adequate tornado missile protection has revealed that this anchor point extends beyond the missile protected area, thereby jeopardizing operability of the SSW should a tornado induced missile impact at this anchor point.

To permit continued reactor operation until a modification of the SSW system could be implemented, which would preclude adverse consequence from this remote, postulated event, a " Request for Immediate Relief from Technical Specification 3.5.B", was requested and received.

Cause and Corrective Action As an interim measure, a temporary operating procedure had been implemented and remained in effect until these modifications were completed. This procedure i required the facility to be immediately shut down in the event a Tornado Warning l in the immediate area is issued.

Analysis indicet>< that the permanent correction action would be to relocate the seismic anchors ' side the tornado barriers. These mdofications were completed on November 6, 1980.

I ,

e