05000293/LER-1980-073-03, /03L-0:on 800917,mgt Review of Records Revealed That Monthly Surveillance Test SP74-41,visual Insp of Energy Piping Outside Containment,Was Not Performed within Required Interval.Caused by Scheduling Error

From kanterella
(Redirected from ML19338G148)
Jump to navigation Jump to search
/03L-0:on 800917,mgt Review of Records Revealed That Monthly Surveillance Test SP74-41,visual Insp of Energy Piping Outside Containment,Was Not Performed within Required Interval.Caused by Scheduling Error
ML19338G148
Person / Time
Site: Pilgrim
Issue date: 10/17/1980
From: Mcloughlin M
BOSTON EDISON CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML19338G144 List:
References
LER-80-073-03L, LER-80-73-3L, NUDOCS 8010280503
Download: ML19338G148 (1)


LER-1980-073, /03L-0:on 800917,mgt Review of Records Revealed That Monthly Surveillance Test SP74-41,visual Insp of Energy Piping Outside Containment,Was Not Performed within Required Interval.Caused by Scheduling Error
Event date:
Report date:
2931980073R03 - NRC Website

text

oAw I

s LICENSEE EVENT REPORT CONpOL BLOCK: l l

l l

l l

(PLEASE PRINT CR TYPE ALL REQUIRED INFORMATION) l o l i l*l M l A l P l P l S l 1 [gl50 l 0 l - l 0 l 0 j a l0 l0 l-l0 l 0 lgl 4 l 1 l t j t j 1 lgl l

lg 7

8 9 UCENSEE CODE 14 1

uCENSE NUMBEM 25 28 uCENSE TYPE JO 57 CAT $8 CON'T 10111 ERC ll hl 0l 5 l 0 l - l 0 l 2 l 9 l 3 @l 0l 9l 1l.7l 8] 0 l@l 1 l 0 l 1 l 718 l0 l@

?

8 60 61 DOCKET NUMBER 68 69 EVENT QATE 74 75 REPORT DA* E 80 EVENT DESCRIPTION AND PROBABLE CONSEQUENCES h lo lal l Management review of records on September 17, 1980 revealed that monthly surveillance l ml test number SP74-41 entitled " Visual Inspection of High Energy Piping Outs _de Cen-l j a 5 4,

[

tainment" was not performed within its required interval.

The test was performed Io Isi I immediately following this determination.

The surveillance interval exceeded its l

Io is l l time limit by six days.

l lo l7l l l

lots l l l

80 7

8 9 E

OCE SU C E CCMPONENT CODE SUSC00'E SU E

lo191 l Cl II@ l A l@ l X l@ l Zl Zl Z l Z l Z l Z l@ l Zl@ l Zl @

~

7 8

9 10 11 12 13 18 19 20 SEQUENTIAL OCCURRENCE REPORT R EVISION LER EVENT YEA R REPORT NO.

CODE TYPE No.

@ sug/RO 1810l l_l l0 l7 l3 l l-l l013 l ltl l_l l 0l as

_ 21 22 23 24 26 27 3

a 30 31 32 YKN AC ON ONP T

ME HOURS 22 SB l N lg l N lg l Z lg l Zl 9 l3"lER9lg I

FOR 8.

SUP't IE MA UP G l XlglJ4Xlg l5Z lg l36Zl@ l0 l0 l 0 l l

33 3

31 40 41 42 43 44 47 CAUSE DESCRIPTION AND CORRECTIVE ACTIONS tijotl This event was the result of a transposition of dates while preparing the schedule.

l l li l l Specific inspections conducted monthly via this procedure are performed less rigor-1 ii i 21 l ously on a daily basis, therefore this event did not create a degraded mode of l

l1 g3gl reactor operation. Computerization of the surveillance scheduling will eliminate l

gi;4i l this type of human error.

I 7

8 9 80 STA

% POWER OTHER STATVS On OV Y DISCOVERY OESCRIPTICN N.A.

l l B l@l Routine Management Review l

y l E l@ l 1 l 0 l 0 l@l 7

8 1

12 11 44 45 46 80 F.ELEASED OF RELEASE AMOUNT OF ACTIVITY LOCATION OF RELEASE N.A.

l l

N.A.

l g y Q lZlgl 7

.8 9

10 11 44 45 80 PERSONNEL EXPOSURES NUMBER TYPE

DESCRIPTION

l 1 l 7 l l 0 l 0 l0 l@lZ l@l N.A.

l IES PERSONNE L INJU oESCRi,TiO~@

NuM8ER

" ^-

I li is I lo lo 10 l@L 7

8 9 11 12 80 LOSS oF OR DAMAGE To FACILtTY TYPE CESCRIPTION N.A.

l lElhl 1 9 7

8 9 to 80 8010280603

,bE @?ECRirTiO,@

NRC USE ONLY N.A.

l [jlllllllllllf l

2 o

'7 8 9 10 68 69 80 ;;

Mr. M. Thomas McLoughlin 617-746-7900 o

m__

6 PHONE:

4