LER 80-074/04L-0:on 790125,0228 & 0301,condenser Delta T, Difference Between Intake & Discharge Canals Sea Water Temp, Exceeded Tech Specs.Caused by Condenser Tube Sheet Fouling & Low Tide.Power Reductions & Condenser Backwashes Initiated
ML19338G076
Person / Time
Site: Pilgrim
Issue date: 10/22/1980
From: Mcloughlin M
BOSTON EDISON CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML19338G068 List:
References
LER-80-074-04L, LER-80-74-4L, NUDOCS 8010280414
Download: ML19338G076 (4)


Text

(7 771 LICENSEE EVENT REPORT C CONTROL BLOCst: ll l l l l lh (PLEASE PRINT OR TYPE ALL REQUIRED INFORMATION) 6 l0 lt 8l 9lM l Al

' Pl Pl Sl 1l@l 14 15 0 l 0 l- l 0 l0 l0 l0 l0 l -l 0 l 0 l@l UCENSE NUMSER 25 426 l 1 LICENSE l 1 l 1TYPE l 140l@l57 CAT l Sa lg I UCENSEE CODE CON'T loIti O RC l60L l@l010 l 5 l COCKET 0 l - lNVI.18ER 0 l 2 l 9 l 363 @l690 l 1EVENT l 2 CATE l 5 l 7 l974l@]751 l 0REPORT l 2 lDATE 2 i 8 l Ol@

r 8 80 EVENT DESCRIPTION AND PROBABLE CONS 20UENCES h 1012 l l On January 25, February 28, and March 1, 1979 Condenser delta T, the difference l 1 o 13 l l between the intake and discharge canal's sea water temperature, exceeded the l 1O I411 Technical Specification Limit of 320F. On each occasion corrective action was _j

[ 0151 l immediately taken to reduce the temperature to allowable levels. l l o 16 I I I l0l7ll l l o is i I l 7 8 9 80 SYSTEM CAUSE CAUSe: COM8 VALVE CODE CODE SUBCODE COMPON ENT CODE SUSCODE SUSCCOE loist 'l Hj Cl@ [Z l@ l Zl@ l Z l Z l Z lZ l Z lZ l@ l Zl@ l Z l@

7 8 9 10 11 12 13 18 19 20 -

_ SEQUENTIAL OCCURRENCE REPORT REVISION LER/Ro EVENT YEAR REPORT NO. COCE TYPE N O.

@ ,R E g l-l l 0l 7l 4l l/l l0 l4 l lLl l-l l0l

[218 22l0 l 23 24 26 27 23 29 30 31 32 N A ON ONP NT HOURS SB i FOR B. SUP LIE MANUFAC RER lZl@lZl@ l35B l@ l36 Al@ l0l0l0l8l lYl@ lN l@ l43 Zl@ l44Z l 9 l 9 l 947l@

33 34 31 40 41 42 CAUSE DESCRIPTION AND CORRECTIVE ACTIONS liiol l Condenser tube sheet fouling and low tide contributed to these events. Power re- l li ii ; g ductions, condenser backwashes, and changes to environmental condition alleviated ]

,,,g; this problem. For these events reports were issued to the E.P.A. These reports  ;

,, ,3 y j are attached as supplements to this LER. l li l41 l I 7 8 9 80 STA  % POWER OTHER STATUS 01 RY DISCOVERY DESCRIPTION N.A. Operational Event l1 l 5 l l El@ l 1 l 0 l 0 l@l l lAl@l l A VITY CO TENT f,ELEASED OF RELEASE AMOUNT OF ACTIVITY LOCATION OF RELEASE N.A. N.A.

l1l6l* l* Zl@ lZ l l _l l

l PERSONNEt ExPOSOES NUM8CA TYPE DESCRIPTION i l t l 7 l l 0l 0 l 0 l@l Z l@l N.A. l PERSONNEL INJt RIES NuMsEs CESCRiPTiON@

li lg l l 0] 0l 0l@l N.A. l 7 8 9 11 12 60 LOSS OF OR CAMAGE TO FAC1UTY TY*E DESCRIPTION l l 1 l 98 l9 l Zl@l10 N.A. l l

7 30 g' '""'"' "O 8010280 M/Y 3,3, l,,,

"'f,,,lj i

'7 8 9 to 68 69 30 5 Mr. M. Thomas McLoughlin 617-746-7900 g J

e--a,. .L----...---.-~-- . .~. -- - - .- --+ . -...- - - . ~ - -

^

Jhh ATTACHNENT TO LER 80-074/04L-0

~

"','" Edson . .a : Page i of 3

, PILGluM NUCLEAR POWER STATION RFD # 1 ROCKY HILL HOAD PLYMOUTil MASSACHUSETTS 02300 January 26, 1979 l Mr. John A.~S. McClennon i

Regional Administrator Massachusetts Unter Resources Commission Division of Water Pollution Control Leverett Saltonstall Building 100 Cambridge St.

Boston, MA 02202 '

Environmental Protection Agency Region I ,

P.O. Box 8127 '

Boston, MA 02114 .

Attn: Permits Branch '

Dear Sir:

In accord with State Permit No. 359, Authorization to Discharge Under the National Pollutant Discharge Elimination System, we are hereby notifying you of an ef fluent discharge from our main condenser of greater than .320F. 4 T.

Due to a severe storm on January 25, 1979, that resulted in extremely rough

' seas, and coastal flooding, our main condenser became fouled with seaweed and silt.

Normally we can track the rise in condenser 4T and take appropriate action; however this rise took place over a relatively short time due to the heavy seas of Rocky Point.

, An accounting of the incident is as follows: -

1 At 1207 hours0.014 days <br />0.335 hours <br />0.002 weeks <br />4.592635e-4 months <br /> the condenser AT reached 320F, ,

2. Operations personnel immediately started additional pumps and increased seawater flows to heat exchangers in order to reduce our effluent temperatures.

3 i

At 1320 hours0.0153 days <br />0.367 hours <br />0.00218 weeks <br />5.0226e-4 months <br />, the outlet valves on the main condenser were opened wide.

. The condenser 4T at this time was,33.30F. Operations personnel back-washed heat exchangers and increased flows to maximum in order to reduce '

l the 4T.

4

> At 1400 hours0.0162 days <br />0.389 hours <br />0.00231 weeks <br />5.327e-4 months <br /> the Chief operating Engineer ordered the station to start reducing pouer. The condenser uT at this time yas 33.50F.

5 I The station continued to reduce load and at 1936 hours0.0224 days <br />0.538 hours <br />0.0032 weeks <br />7.36648e-4 months <br /> the unit was at

, 50% power and in the process of hdekvashing the main condenser to alleviate the fouling problem caused by the storm.

I hope this chronolony explains our problem and our immediata corrective

' actions taken to comply with our . Discharge Permit. Please be assured that we sy_ intend to operate within the limits outlined in our Permit at all_ times.

I n

a- .

-- ,,.. .__...s -- - ,

...7,.,__.,.-_._.

l i

... ATTACllMENT TO LER 80-074/04L-0 ,

a , ,. page 2 of 3

, If you have.any questions concerning this incident, please feel free to call me at your convenience. .

, Yours truly, C- od ,

P. )McGuire Stasion Manager

. Nuclear Operations HRB:ep ,

\ .

cc: Mr. G. C. Andog'nini .

, e

  • M
  • e 0

0 0

e 0

e > *

  • e e O t V b

9 4

5 9

0 6

9 e

O 9

O 3

,q.

- 2- ..

e s

g s

. . ATTAC11 MENT:TO LER 80-074/04L-0 3,

$,; Page 3 of 3 8, """ Edison ,-

, _ 7 PILGRIM NUCLEAR POWER STATION

/ RFD

  • 1 ROCKY Hitt. ROAD PLYMOUTH, MASSACHUSETTS 02360 March 1, 1979 Mr. John A. S. McClennon R:gional Administrator Massachusetts Water Resources Commission Division of Water Pollution Control L;verett Saltonstall Building

' 100 Cambridge Street B:ston, Massachusetts 02202 -

~

Environmental Protection Agency R:gion I ,

P. O. Box 8127 Baston, Massachusetts 02114 Attention: Permits Branch Drar Sir:

In accord with State Permit No. 359, Authorization to Discharge Under the National Pollutant Discharge Elimination System, we are hereby notifying you cf an effluent discharge from our main condenser of greater than' 32 F.AT.

I i Due to a Northeasti storm early in the week of February 25, 1979, through March 3, 1979, we experienced increased seaweed impinge =ent on our traveling screens.

B1cause it is impossible to prevent all foreign material from reaching our main condenser, Operations personnel observed a slow rise in the condenser AT. In risponse to this, the Chief Operating Engineer has scheduled a power. reduction fer Sunday for the purpose of backwashing the main condenser.

Htwever, on Thursday, March 1st, the condenser AT 9xceeded 32* F. The Watch ,

Engineer took immediate corrective action by reducing the reactor power level ,

to stay within acceptable A T limits.

Please be assured that during the interim, between Thursday and Sunday, at which time we are scheduled to backwash the main condenser, we will not knowingly exceed cur AT effluent discharge limits and Operations personnel have been instructed to rcduce station power level as necessary to prevent a recurrence of this event.

If you have any questions regarding this incident, please feel free.to call me at

') .

ymur convenience.

Yours truly,

. / C,f I ,w "P. '

. McGuire, Station Manager

'. PJM:ch N.

+ .

4

s. ]