05000293/LER-1980-054-03, /03L-0:on 800901,changed Station Organization of Tech Specs.Caused by Continuing Efforts to Improve Mgt. Amends to Tech Specs Re Organizational Changes Will Be Submitted for Review & Approval.Organizational Charts Encl

From kanterella
(Redirected from ML19337A597)
Jump to navigation Jump to search
/03L-0:on 800901,changed Station Organization of Tech Specs.Caused by Continuing Efforts to Improve Mgt. Amends to Tech Specs Re Organizational Changes Will Be Submitted for Review & Approval.Organizational Charts Encl
ML19337A597
Person / Time
Site: Pilgrim
Issue date: 09/16/1980
From: Graham E
BOSTON EDISON CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML19337A567 List:
References
LER-80-054-03L, LER-80-54-3L, NUDOCS 8009290317
Download: ML19337A597 (3)


LER-1980-054, /03L-0:on 800901,changed Station Organization of Tech Specs.Caused by Continuing Efforts to Improve Mgt. Amends to Tech Specs Re Organizational Changes Will Be Submitted for Review & Approval.Organizational Charts Encl
Event date:
Report date:
2931980054R03 - NRC Website

text

(7 77) 1.lCENSEE EVENT REPORT 7h CONTROL BLOCK: l l

l l

l l

lh (PLEASE P". INT OR TYPE ALL RFQUIRED INFORMATION) i o

R'lM l A lP lP lS l 1 l@l 0 l 0l 0l 0 l 0 ] 0 l 0 l 0 l 0 l 0 l 0 l@l 4 l 1 l l l 1 l l@l l

l@

j 7

8 9 LICENSEE CODE 14 15 LICENSE NUMB ER 25 26 L6 CENSE TYPE JO 57 CAT 58 l

CON'T loIil 3o[pCE lL }@l0 l 5 l 0l -l 0l 2l 9l 3 @l 0l 9 l 0 l ll 8l 0 }@l 0l 9 l ll 6 l 8 l O l@

7 6

60 61 DOCKET NUMBER 68 69 EVENT DATE 74 75 REPORT DATE 80 EVENT DESCRIPTION AND PROBABLE CONStOUENCES h 10 t 21 l On September 1, 1980 Pilgrim Station Unit #1 changed its Station Organization as I

totalI indicated 'n Figures 6.2.1 and 6.2.2 of the Technical Specifications. The new l

[o 14; I organization charts are attached to the LER.

I lo Isl l I

~

10161l l

lo l7 l l l

~

10181 I I

SOos" SUSNDE COMPONENT CODE SUSCODE SU E

^

CODE iol91

'lx l xl@ l xl@ l Z l@ 12 I z 121212 I z l@ Iz l@ LZ i @

7 8

9 10 11 12 13 18 19 T.0 SEQUEN TI AL OCCURRENCE REPORT REVISION LER RO EVENT YE AR REPORT NO.

CODE TYPE NO.

@,RE l8l0l l-l l015l4l y

l013 l lL l l-l l0 l

,,, 21 22 23 24 26 27 28 29 30 31 32 T KN AC 0 ON PLANT ME O

HOURS SS IT POR B.

S JPPLIE MANUFAC URER l Z lgl34Gl@

lZl@

lZl@

l0l0l0l0l lY l@

l N l@

l2l@

l Z l 9 l 9 l 9 l@

3J 35 36 3/

40 41 42 43 44 47 CAUSE DESCRIPTION AND CORRECTIVE ACTIONS joil The changes to Boston Edison's Nuclear Organization result from Boston Edison's l

i gl continuing efforts to improve the management of Pilgrim Unit 1.

Amet;dments to the I

l Tech. Specs, reflecting these organization changes will be submitted to the l

,,3i ; Commission for their review and approval.

l L' Li.J l I

7 8 9 8G SA S

% POWER OTHER STATUS IS O RY DISCO % ERY CESCRIPTION 11 15llzl@ l1l0l0l@l N.A.

l lZl@l N.A.

l ACTIVITY CO TENT RELE ASED OP RELEASE AMOUNT OF ACTIVITY LOCATION OF RELEASE N.A.

l l

N.A.

l l1 l6l

@lZl@l 7

8 9 10 11 44 45 80 PERSONNEL EXPOSURES NUMBER TYPE

DESCRIPTION

l i 17 l l 0 l 0 l 0 l@l Z l@l N.A.

l PE RSONN E L INJURIES NUM8ER D ESCRIPT10N It l a l l 0l 0 ] 0l@l N.A.

l 7

8 9 11 12 80 LOSS OF OR OAMAGE TO FACILITY TYPE

DESCRIPTION

li l 91 I Zl@l N.A.

l 7

8 9 10 80 Vf@OE CRIPTION N.A.

l lllllllllllljj l

L2.jgj i 7

8 9 10 68 69 80 3 617-746-7900 g

8 00929 o g N

E OF PREPARER PHONE:

Office of the President President Senior Vice Presidents Vice President Huclear Huclear Safety Review

.,,,8 and Audit Committee g

1 I

I 1

I i

u ear pera ti ns u ear p ra i ns Quality Assurance Nuclear Engineering Han ger - PNPS Support Manager Manager Deputy Managers (2)

Hanager 1

i I

I l

i e

i i

i I

I I

I Operations g

g Conun i t tce ATTACllMENT 1 to LER 80-054/03L-0

fl0CLFAR OPERATifGS HANAcER (NSRAC) (ORC)

~

OtTUTY HP.N?/:E!;S HANNIDIPUT (2)

(COC)

SERVICES CROUP NUCLEAR OPERATintas (ORC)

STAFF ASSISTANTS I

I C0tlFLIANCE OUTAGE OFFICE ENGINEER (S)

SCHEDULING SUTERVISOR CLERICAL STAFF CillEF P10 CLEAR CillEF CillEF ClllEF TECitNICAL SECURITY TR\\lNitEl OPERATING MAINTENANCE RADIOLOGICAL EhGillEER SUPERVISOR STAfT lilG1HEER ENGINEER EllGINEER (ORC)

(ORC) (SRO)

(ORC)

(ORC)

I I

TECliNICAL TECHillCAL TECilNICAl,

STAFF WATCl3 STAtF STAFF LilCINEER(S) 1 l

I I

I (SRO) i WASTE REACTOR CllEHICAL AND IIEAl.Til SUPERVISOR (S)

HAlHTENANCE PflYSICS ALARA HANAGEHENT ENGINEER ENGINEERS OPERATitlG (RO)

SUPERVISOR (S)

ENGINEER (S)

ENGINEER EffCINEER SO I

I I

I I

I I

I NUCl. EAR tlUCLEAR llEALTil PIAtlT HECII ANIC(S)

PilYSICS ALARA NUCLEAR NUCLEAR ClifNICAl.

NUCLEAR TECilNICI AN(S)

TECilNICIANS PIANT TECllNICIAN(S TECllNICI AN(S:

CONTROL TECilNICI AN(S)

OPERATOR (S)

AND

.0 )

ATTEliDANT(S)

AND CLERKS ATTENDENTS HUCLEAR M'% :ARY OPERATOR (S)

CODE: IISRAC - itEHBER OF NSRAC 011C

- HEH11ER OF ORC
- NRC REACTOR OPERATOR LICENSE f(0
- NRC SENIOR REACTOR OPERA 10R LICENSE Sl(O ATTACllMENT 2 to LER 80-054/03L-0