Category:NRC TECHNICAL REPORT
MONTHYEARML20209G0351999-05-31031 May 1999 TER on Review of TMI-1 IPEEE Submittal on High Winds,Floods & Other External Events (Hfo) ML20056E5171993-08-31031 August 1993 Technical Review Rept, Tardy Licensee Actions ML20059J5351993-06-30030 June 1993 Review of 2.206 Petition Process:Background Discussion Paper ML20035F4141993-04-30030 April 1993 Unauthorized Forced Entry Into the Protected Area at Three Mile Island Unit 1 on February 7, 1993 ML19325C5301989-10-0606 October 1989 Evaluation Re Safety & Performance Improvement Program Programmatic Audit ML20246P9191989-03-31031 March 1989 The Status of Recommendations of the Presidents Commission on the Accident at Three Mile Island.A Ten-Year Review ML20235M5291989-01-11011 January 1989 TMI-2 Cleanup Program Status Update ML20148D0671988-03-17017 March 1988 Headquarters Daily Rept for 880317 ML20147E3211988-01-0606 January 1988 Rept of Interview W/Rg Lagrange to Discuss Gpu 830520 & s Re Environ Qualification equipment.Marked-up 850409 Statement from H Hukill Also Encl ML20133J5421985-02-14014 February 1985 Summary of Order Before Commission for Affirmation (SECY-84-475A) ML20088A7451984-03-31031 March 1984 Answers to Frequently Asked Questions About Cleanup Activities at Three Mile Island,Unit 2 ML20087P9481984-03-31031 March 1984 NRC Plan for Cleanup Operations at Three Mile Island Unit 2 ML20024C6951983-07-11011 July 1983 Portions of Chapter 1 to 10CFR50,Title 10, Emergency ML20024B9001982-05-10010 May 1982 Vol 2,Part 1 of TMI Rept to Commissioners & to Public ML20024B9191982-05-10010 May 1982 Tmi,Rept to Commissioners & to Public, Vol Ii,Part 1. Pp 109-111 Only ML20027C0931982-03-31031 March 1982 Recently Evaluated Preoperational Test Precursor of TMI-2 Accident, for Presentation at ANS 1982 Power Div Topical Meeting in Charleston,SC,820328-31 ML20054A5781982-03-16016 March 1982 NRC Plan for Cleanup Operations at Three Mile Island Unit 2 ML20023A5161982-03-11011 March 1982 Bevil Rept Input Re Ginna 820125 Steam Generator Tube Rupture Event.Nrc 16th Monthly Status Rept to Congress Re TMI-1 Restart Encl ML20054A6331982-02-28028 February 1982 NRC Plan for Cleanup Operations at Three Mile Island Unit 2: Revision 1 ML19352A8741981-05-29029 May 1981 Emergency Preparedness Evaluation for TMI-1 ML20003G7101981-04-30030 April 1981 TMI-1 Restart.Evaluation of Licensees Compliance with the Short and Long-Term Items of Section II of the NRC Order Dated August 9,1979.(Met Ed Et Al,Three Mile Island Nuclear Station,Unit 1,Docket No. 50-289) ML20003G7071981-03-31031 March 1981 Impact of the 1979 Accident at Three Mile Island Nuclear Station on Recreational Fishing in the Susquehanna River ML19350B7721981-03-31031 March 1981 TMI-1 Restart.Evaluation of Licensees Compliance W/Short & Long Term Items of Section II of NRC Order Dated August 9, 1979.(Met Ed Et Al,Three Mile Island Nuclear Station,Unit 1, Docket 50-289) ML20008F3211981-03-0505 March 1981 Evaluation of Radiation Protection Plan ML20148T0941981-01-31031 January 1981 Investigation Into Information Flow During the Accident at Three Mile Island ML19340E9031981-01-14014 January 1981 Rept on Saint Lucie 1 Natural Circulation Cooldown on 800611. Certificate of Svc Encl ML19347C6661980-12-31031 December 1980 Control Room Design Review Rept for TMI-1 ML19351F0731980-12-31031 December 1980 Emergency Preparedness Evaluation for TMI-1 ML20002D4031980-12-31031 December 1980 The Public Whole Body Counting Program Following the Three Mile Island Accident ML20148P6001980-12-24024 December 1980 Discusses Followup Study Re Degradation of Internal Appurtenances in LWR Piping During Normal Plant Operation & Potential Effects When Degraded Appurtenances Are Subj to Accident Loads.Recommends Review of Recurrent Problems ML19345D1411980-11-30030 November 1980 The Potential Impact of Licensee Default on the Cleanup of TMI-2 ML20008E0081980-09-30030 September 1980 Answers to Frequently Asked Questions About Cleanup Activities at TMI-2 ML19344A9881980-07-10010 July 1980 Status of NRC Activities & Plans as Related to Recommendations in Resolutions 207-211 by House of Representatives of Commonwealth of Pa ML19312E2781980-06-0202 June 1980 TMI-1 Potential Core Damage Accident Sequences & Preventive & Mitigative Measures ML19318B8541980-05-31031 May 1980 Environ Assessment of Radiological Effluents from Data Gathering & Maint Operation on TMI Unit 2 ML19331D4441980-05-31031 May 1980 Final Environ Assessment for Decontamination of TMI Unit 2 Reactor Bldg Atmosphere, Vol 1 of Final NRC Staff Report ML20155J7451980-04-28028 April 1980 Rept of Interview W/J Blessing as Recorded by Rk Christopher,Investigator,Us Nrc ML19323A6871980-04-25025 April 1980 Accident at TMI-2 & Ensuing Actions by Nrc ML20155J7781980-04-11011 April 1980 Rept of Interview W/Ms Coleman by IE & Ofc of Inspector & Auditor on 800410 ML19323A7231980-04-0505 April 1980 Tmi,Rept to Commissioners & to Public, Vol 2,Part 3. Final Version ML19323A7201980-04-0505 April 1980 Tmi,Rept to Commissioners & to Public, Vol 2,Part 1. Final Version ML19323A7221980-04-0505 April 1980 Tmi,Rept to Commissioners & to Public, Vol 2,Part 2. Final Version ML19323B5401980-04-0404 April 1980 Further Evaluation of Risk of Recriticality at TMI-2 ML19323A6441980-03-31031 March 1980 TMI Weekly Status Rept for 800322-28,providing Facility Status,Environ & Effluent Info,Major Activities,Future Evolutions & Public Affairs Info ML19308E1461980-03-0505 March 1980 NRC Action Plans Developed as Result of TMI-2 Accident, Draft 3 ML19322D8311980-02-13013 February 1980 Safety Evaluation & Environ Assessment Supporting Encl Tech Specs.Facility Will Remain in Safe & Stable Posture During Recovery Mode ML19345B9451980-02-0707 February 1980 Analysis of Feedwater Transient Sequences in B&W Nsss ML19257C1151980-01-24024 January 1980 Draft Tmi,Rept to Commissioners & to Public, Vol 2,Part 3 ML19257C1131980-01-24024 January 1980 Draft Tmi,Rept to Commissioners & to Public, Vol 2,Part 1 ML19257C1141980-01-24024 January 1980 Draft Tmi,Rept to Commissioners & to Public, Vol 2,Part 2 1999-05-31
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217G1001999-10-14014 October 1999 Errata to Safety Evaluation Supporting Amend 215 to FOL DPR-50.Credit Given for Delay in ECCS Leakage ML20217K4701999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for TMI-1.With ML20216F9231999-09-22022 September 1999 Safety Evaluation Supporting Amend 216 to License DPR-50 05000289/LER-1999-010, :on 990830,discovery of Condition Outside UFSAR Design Basis for Flood Protection Was Noted.Caused Because Original Problem Was Not Corrected by Design Change.Flood Procedure Was Immediately Revised.With1999-09-21021 September 1999
- on 990830,discovery of Condition Outside UFSAR Design Basis for Flood Protection Was Noted.Caused Because Original Problem Was Not Corrected by Design Change.Flood Procedure Was Immediately Revised.With
ML20211H5111999-08-31031 August 1999 Non-proprietary Rev 1 to MPR-1820(NP), TMI Nuclear Generating Station OTSG Kinetic Expansion Insp Criteria Analysis ML20211Q3551999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Tmi,Unit 1.With ML20211E8731999-08-24024 August 1999 Safety Evaluation Supporting Amend 215 to License DPR-50 ML20211B1931999-08-19019 August 1999 Safety Evaluation Supporting Amend 214 to License DPR-50 ML20210R4791999-08-13013 August 1999 Update 3 to Post-Defueling Monitored Storage SAR, for TMI-2 ML20210U4791999-07-31031 July 1999 Monthly Operating Rept for July 1999 for TMI-1.With 05000289/LER-1999-009, :on 990626,automatic Start of EDG 1A Occurred. Caused by Failure of Fault Pressure Relay on Auxiliary Transformer 1B.Failed Pressure Relay Has Been Replaced1999-07-22022 July 1999
- on 990626,automatic Start of EDG 1A Occurred. Caused by Failure of Fault Pressure Relay on Auxiliary Transformer 1B.Failed Pressure Relay Has Been Replaced
ML20210K7651999-07-0909 July 1999 Rev 2 to 86-5002073-02, Summary Rept for Bwog 20% Tp Loca ML20209G0011999-07-0909 July 1999 Staff Evaluation of Individual Plant Exam of External Events Submittal on Plant,Unit 1 ML20209H8251999-07-0101 July 1999 Provides Commission with Evaluation of & Recommendations for Improvement in Processes Used in Staff Review & Approval of Applications for Transfer of Operating Licenses of TMI-1 & Pilgrim Station ML20209H1421999-06-30030 June 1999 Monthly Operating Rept for June 1999 for TMI-1.With ML20212H9101999-06-21021 June 1999 Safety Evaluation Supporting Amend 212 to License DPR-50 05000289/LER-1999-007, :on 990528,increasing Failure Rate of ESAS Relays Characterized by Coil Overheating & Failing to Fully re-close After Being de-energized Was Discovered.Cause Indeterminate.Relay Check Procedure Has Been Changed1999-06-18018 June 1999
- on 990528,increasing Failure Rate of ESAS Relays Characterized by Coil Overheating & Failing to Fully re-close After Being de-energized Was Discovered.Cause Indeterminate.Relay Check Procedure Has Been Changed
ML20195J9401999-06-15015 June 1999 Safety Evaluation Supporting Amend 211 to License DPR-50 05000289/LER-1999-005, :on 990514,open Flood Path Between Turbine Bldg & Control Bldg Was Noted.Caused by Failure to Recognize That Mods Affected Flood Protection.Revised Flood Procedures.With1999-06-14014 June 1999
- on 990514,open Flood Path Between Turbine Bldg & Control Bldg Was Noted.Caused by Failure to Recognize That Mods Affected Flood Protection.Revised Flood Procedures.With
ML20195H0751999-06-0808 June 1999 Drill 9904, 1999 Biennial Exercise for Three Mile Island ML20195H9261999-05-31031 May 1999 Monthly Operating Rept for May 1999 for TMI-1.With ML20209G0351999-05-31031 May 1999 TER on Review of TMI-1 IPEEE Submittal on High Winds,Floods & Other External Events (Hfo) ML20207B6621999-05-27027 May 1999 SER Finding That Licensee Established Acceptable Program to Periodically Verify design-basis Capability of safety-related MOVs at TMI-1 & That Util Adequately Addressed Actions Required in GL 96-05 05000289/LER-1999-003-01, :on 990310,discovered Failure of Manual Balancing Damper in Supply Duct of Control Bldg Evs.Caused by Failure to Adequately Review Risk & Consequences of Change.Failed Damper Was Clamped Open1999-05-0707 May 1999
- on 990310,discovered Failure of Manual Balancing Damper in Supply Duct of Control Bldg Evs.Caused by Failure to Adequately Review Risk & Consequences of Change.Failed Damper Was Clamped Open
ML20206R0571999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Tmi,Unit 1.With ML20206D4201999-04-20020 April 1999 Safety Evaluation Granting Exemption from Technical Requirements of 10CFR50,App R,Section III.G.2.c for Fire Areas/Zones AB-FZ-4,CB-FA-1,FH-FZ-1,FH-FZ-6,FH-FZ-6, IPSH-FZ-1,IPSH-FZ-2,AB-FZ-3,AB-FZ-5,AB-FZ-7 & FH-FZ-2 ML20205Q6111999-04-15015 April 1999 Safety Evaluation Supporting Amend 210 to License DPR-50 ML20205Q5981999-04-13013 April 1999 Safety Evaluation Supporting Amend 209 to License DPR-50 ML20206P2841999-04-12012 April 1999 SER Approving Transfer of License for Tmi,Unit 1,held by Gpu Nuclear,Inc to Amergen Energy Co,Llc & Conforming Amend, Per 10CFR50.80 & 50.90 ML20209G0071999-03-31031 March 1999 Submittal-Only Screening Review of Three Mile Island,Unit 1 Individual Plant Exam for External Events (Seismic Portion) ML20205K6851999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Tmi,Unit 1.With 05000289/LER-1999-002, :on 990212,potential Failure of Multiple Containment Monitoring Sys CIV (CM-V-1,2,3 & 4) Was Noted. Caused by Inappropriate Use of Vendor Info.Personnel Will Be Trained on Mgt Expectations.With1999-03-14014 March 1999
- on 990212,potential Failure of Multiple Containment Monitoring Sys CIV (CM-V-1,2,3 & 4) Was Noted. Caused by Inappropriate Use of Vendor Info.Personnel Will Be Trained on Mgt Expectations.With
ML20210C0161999-03-0101 March 1999 Forwards Corrected Pp 3 of SECY-98-252.Correction Makes Changes to Footnote 3 as Directed by SRM on SECY-98-246 ML20207M8461999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for TMI-1.With 05000289/LER-1999-001-01, :on 990122,short Sections of Piping Caused by Misplacement of Sensing Elements & Insulation.Caused by Failure to Adhere to Vendor instruction.Re-installed Heat Trace Sys1999-02-19019 February 1999
- on 990122,short Sections of Piping Caused by Misplacement of Sensing Elements & Insulation.Caused by Failure to Adhere to Vendor instruction.Re-installed Heat Trace Sys
ML20196K3561999-01-22022 January 1999 Safety Evaluation Concluding That Although Original Licensee Thermal Model Was Unacceptable for Ampacity Derating Assessments Revised Model Identified in 970624 Submittal Acceptable for Installed Electrical Raceway Ampacity Limits 05000289/LER-1998-014-01, :on 981210,missed TS Surveillance Was Noted. Caused by Human Error.Absolute & Relative Control Rod Positions Were Obtained Immediately & Verified to Agree within Required Range.With1999-01-11011 January 1999
- on 981210,missed TS Surveillance Was Noted. Caused by Human Error.Absolute & Relative Control Rod Positions Were Obtained Immediately & Verified to Agree within Required Range.With
ML20196G4661998-12-31031 December 1998 British Energy Annual Rept & Accounts 1997/98. Prospectus of British Energy Share Offer Encl ML20207A9291998-12-31031 December 1998 1998 Annual Rept for TMI-1 & TMI-2 ML20196F6861998-12-0202 December 1998 Safety Evaluation Accepting Licensee Second 10-yr Interval ISI Program Plan Request for Alternative to ASME B&PV Code Section XI Requirements Re Actions to Be Taken Upon Detecting Leakage at Bolted Connection ML20198B8641998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for TMI-1.With ML20195C6921998-11-12012 November 1998 Safety Evaluation Supporting Amend 52 to License DPR-73 ML20195J8591998-11-12012 November 1998 Rev 11 to 1000-PLN-7200.01, Gpu Nuclear Operational QA Plan ML20196B7191998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for TMI-1.With ML20203G1211998-10-30030 October 1998 Informs Commission About Staff Preliminary Views Concerning Whether Proposed Purchase of TMI-1,by Amergen,Inc,Would Cause Commission to Know or Have Reason to Believe That License for TMI-1 Would Be Controlled by Foreign Govt 05000289/LER-1998-013, :on 980916,failure to Perform Fire Protection Program Surveillances at Required Frequency Was Noted.Caused by Changes Not Being Made to Surveillance Schedule.Performed Missed Insp Surveillance1998-10-15015 October 1998
- on 980916,failure to Perform Fire Protection Program Surveillances at Required Frequency Was Noted.Caused by Changes Not Being Made to Surveillance Schedule.Performed Missed Insp Surveillance
ML20155E7511998-10-15015 October 1998 Rev 1 to Form NIS-1 Owners Data Rept for Isi,Rept on 1997 Outage 12R EC Exams of TMI-1 OTSG Tubing 05000289/LER-1998-010-01, :on 980825,potential Violation of Design Criteria During Single Auxiliary Transformer Operation Occurred.Caused by Failure to Adequately Define Job Performance Stds.Temporary Change Notice Issued1998-10-0909 October 1998
- on 980825,potential Violation of Design Criteria During Single Auxiliary Transformer Operation Occurred.Caused by Failure to Adequately Define Job Performance Stds.Temporary Change Notice Issued
ML20154L5541998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for TMI Unit 1.With 05000289/LER-1998-011, :on 980825,Thermo-Lag Fire Barrier Was Found Installed Outside Approved Joint Design Arrangement.Caused by Personnel Error.Initiated Continuous Fire Watch & Installed Trowel Grade Thermo-Lag in Void & on Outer Edge1998-09-23023 September 1998
- on 980825,Thermo-Lag Fire Barrier Was Found Installed Outside Approved Joint Design Arrangement.Caused by Personnel Error.Initiated Continuous Fire Watch & Installed Trowel Grade Thermo-Lag in Void & on Outer Edge
1999-09-30
[Table view] |